Loading...
HomeMy WebLinkAbout19954 Harrisburg Way SurveyZoning = RS-3 ENGINEERING REVIEWED Date:__________________08/20/2020 corlowsky EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements.