HomeMy WebLinkAbout19954 Harrisburg Way SurveyZoning = RS-3
ENGINEERING REVIEWED
Date:__________________08/20/2020 corlowsky
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
The curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.
*No structures in easements.