Loading...
HomeMy WebLinkAbout20-090CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. 20-90 RESOLUTION APPROVING THE PRELIMINARY PLAT OF INTERSTATE SOUTH LOGISTICS PARK THIRD ADDITION WHEREAS, Scannell Properties #441, LLC, has requested approval of the preliminary plat of one industrial lot to be known as INTERSTATE SOUTH LOGISTICS PARK THIRD ADDITION, legally described in Exhibit A; and WHEREAS, the Planning Commission held a public hearing at their August 20, 2020 meeting, preceded by notice as required by the Subdivision Ordinance; and WHEREAS, the Planning Commission and the Parks, Recreation and Natural Resources Committee unanimously recommended approval of the preliminary plat; and WHEREAS, the preliminary plat is acceptable to the City; NOW THEREFORE BE IT RESOLVED by the Lakeville City Council: INTERSTATE SOUTH LOGISTICS PARK THIRD ADDITION preliminary plat is approved subject to the following conditions: 1. Implementation of the recommendations listed in the August 20, 2020 engineering report. 2. The site and buildings shall be developed in compliance with the plans approved by the City Council and Zoning Ordinance requirements. 3. A security shall be submitted to guarantee installation of the approved landscaping at the time of final plat approval. All landscaped areas within and adjacent to the parking lot shall be irrigated. 4. Snow storage shall not take place in required parking spaces. 5. The buildings shall be constructed of materials consistent with the requirements of the Zoning Ordinance for industrial buildings. 6. If required by the Federal Aviation Administration (FAA), approval of permit No. 7460 (crane permit) shall be obtained from the FAA prior to commencing construction with the use of a crane or cranes taller than 35 feet in height. 7. Parking deferment applications shall be submitted to the Planning Department prior to the issuance of building permits. 8. Prior to City Council consideration of the final plat, revised grading, drainage, erosion control, and utility plans must be submitted, reviewed and approved by the Engineering Division. ADOPTED by the Lakeville City Council this 31St day of August 2020 ATTEST: Charlene Friedges, City Cle Drafted By: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 2 CITY OF LAKEVILLE Douglas P. Anderson, Mayor EXHIBIT A That part of the Southeast Quarter (SE 1/4) of Section Thirty -One (31), Township One Hundred Fourteen (114) North, Range Twenty (20) West of the Fifth Principal Meridian, Dakota County, Minnesota, lying westerly of Dodd Road, EXCEPT that part platted as INTERSTATE SOUTH LOGISTICS PARK and INTERSTATE SOUTH LOGISTICS PARK SECOND ADDITION, Dakota County, Minnesota, according to the recorded plats thereof. And The west 50.00 feet of OUTLOT A, INTERSTATE SOUTH LOGISTICS PARK; That part of OUTLOT B, INTERSTATE SOUTH LOGISTICS PARK, lying southerly of the following described line: Beginning at the southeast corner of said OUTLOT B and assuming the most easterly east line of said OUTLOT B bears NORTH; thence westerly along a tangential curve concave to the north, having a radius of 625.00 feet and a central angle of 16 degrees 18 minutes 16 seconds and a chord that bears North 82 degrees 21 minutes 15 seconds west and there line terminating; Outlot C, Interstate South Logistics Park, except that part platted as Interstate South Logistics Park Second Addition; Outlot E, Interstate South Logistics Park. 3