HomeMy WebLinkAboutItem 06.o Date: September 8, 2020 Item No. KINGSLEY LAKE OUTLET CONTROL STRUCTURE AGREEMENT WITH SUNRAM CONSTRUCTION Proposed Action Staff recommends adoption of the following motion: Move to approve Agreement with Sunram Construction for Kingsley Lake Outlet Control Structure, City Project 20-59. Overview Kingsley Lake is 40 acres in area and drains a watershed of approximately 180 acres. The lake is experiencing significant fluctuations in surface water elevations, negatively impacting abutting private property and the public storm sewer system. The existing outlet control structure is structurally deficient and not functioning as designed and needs to be replaced. The new outlet control structure is designed to reduce peak stormwater discharge rates and create efficiencies in maintenance. The new outlet control structure will be installed at the same Minnesota Department of Natural Resources (MnDNR) approved elevation as the original. The City received three quotes for City Project 20-59 ranging from a low quote of $22,435 submitted by Sunram Construction to a high quote of $28,550.30. The Engineer’s estimated construction cost was $47,175. The reduced cost is largely in part to the current low surface water elevation, thereby reducing dewatering efforts. The City’s total estimated project cost is $39,685 (includes engineering costs and Sunram Construction construction contract). The attached Agreement provides the scope of work, cost and schedule for completing the project. Primary Issues to Consider • Construction is anticipated to begin in September 2020, with substantial completion by October 2020. Supporting Information • Agreement; Wenck Letter of Recommendation dated September 2, 2020 Financial Impact: $22,435 Budgeted: Y☒ N☐ Source: Utility Fund – Env. Res. Envision Lakeville Community Values: Good Value for Public Services Report Completed by: Mac Cafferty, Environmental Resources Manager CITY OF LAKEVILLE RESOLUTION NO. 20- RESOLUTION AUTHORIZING FUNDING FOR KINGSLEY LAKE OUTLET CONTROL STRUCTURE CITY PROJECT 20-59 WHEREAS, the Kingsley Lake Outlet Control Structure, City Project 20-59, is programmed in the adopted Lakeville 2020 Budget. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Lakeville, Minnesota: The estimated project cost is $39,685 and anticipated funding sources are listed below. City staff is hereby authorized to amend the 2020 budget (if needed as the project is completed) and make the appropriate transfers between funds with respect to the project funding sources up to 10% above the estimated costs. Funding transfers may include loans between funds to cover engineering and other costs incurred on the project in advance of receiving other funding. Funding Sources Amount Utility Fund – Environmental Resources $39,685 Total $39,685 ADOPTED by the Lakeville City Council this 8th day of September 2020. ______________________________ Douglas P. Anderson, Mayor _________________________________ Charlene Friedges, City Clerk Technical Memo Wenck | Colorado | Georgia | Minnesota | North Dakota | Wyoming Toll Free 800-472-2232 Web wenck.com To: McKenzie Cafferty From: Jeff Madejczyk, Wenck Associates, Inc. Dan Elemes, P.E. Wenck Associates, Inc. Nick Weyers, P.E. Wenck Associates, Inc. Date: September 2, 2020 Subject: Kingsley Lake Outlet Retrofit: City Project 20-59 City Action Requested Staff is recommending Council authorize a Notice of Award for the Kingsley Lake Outlet Retrofit Project. Three contractors were invited to quote on the project and all quotes were received by the stated deadline. Wenck has reviewed all submitted quotes and provides the following summary for consideration by Staff. Quote Results Three quotes were received on September 1, 2020 for the Kingsley Lake Outlet Retrofit. Quote results are summarized below and detailed in the attached table. Summary Contractor Total Bid Blackstone Contractors, LLC $ 28,550.30 Minnesota Dirt Works, Inc $ 27,790.00 Sunram Construction, Inc. $ 22,435.00 The low quote was Sunram Construction, Inc. quote of $22,435.00. Engineer’s Recommendation Overall, the costs provided by all contractors are very competitive, and Wenck recommends that the contract for the base quote be awarded to Sunram Construction, Inc. for $22,435.00.