PINNACLE RESERVE AT AVONLEA 3RD ADDITION FINAL PLAT
Proposed Action
Staff recommends adoption of the following motion: Move to approve: 1) a resolution approving the
Pinnacle Reserve at Avonlea 3rd Addition final plat, and 2) a resolution designating “No Parking” areas.
Overview
D.R. Horton representatives are requesting approval of the Pinnacle Reserve at Avonlea 3rd Addition final
plat of 32 single family lots on property located east of Highview Avenue and north of future 185th Street
(CSAH 60). A “No Parking” resolution is included in conjunction with the final plat due to the 28-foot
street width for the Hamel Drive cul-de-sac. The Pinnacle Reserve at Avonlea preliminary plat of 183
single family lots and 85 detached townhome lots was approved by the City Council on May 20, 2019.
The Pinnacle Reserve at Avonlea final plat of 87 single family lots and 37 detached townhome lots was
approved by the City Council on August 5, 2019. The Pinnacle Reserve at Avonlea 2nd Addition final plat
of one lot for an HOA amenity building was approved by the City Council on March 2, 2020. The
Pinnacle Reserve at Avonlea final plat is consistent with the approved preliminary plat.
Primary Issues to Consider
Will any trails be constructed with this phase of Pinnacle Reserve?
The developer will construct a bituminous trail on the east side of Highview Avenue from Hideaway Trail to
Dodd Boulevard with this final plat.
Supporting Information
• Final plat and “No Parking” resolutions
• Signed development contract
• August 5, 2020 planning report and August 28, 2020 engineering report
Financial Impact: $ Budgeted: Y☐ N☐ Source:
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: A Home for All Ages and Stages of Life
Report Completed by: Daryl Morey, Planning Director
September 8, 2020
Zoning and Subdivision Ordinances, Avonlea PUD
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. __________
RESOLUTION APPROVING THE FINAL PLAT OF
PINNACLE RESERVE AT AVONLEA 3RD ADDITION
WHEREAS, the owner of the plat described as Pinnacle Reserve at Avonlea 3rd
Addition has requested final plat approval; and
WHEREAS, the preliminary plat was reviewed by the Planning Commission and
the Parks, Recreation and Natural Resources Committee and approved by the City
Council; and
WHEREAS, the final plat is consistent with the approved preliminary plat; and
WHEREAS, the final plat is acceptable to the City.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The final plat of Pinnacle Reserve at Avonlea 3rd Addition is hereby approved
subject to the development contract, security requirements, and the Avonlea
PUD ordinance as may be amended.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars,
development contract, and all documents required pursuant to the
development contract.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 8th day of September 2020
CITY OF LAKEVILLE
BY: _______________________
Douglas P. Anderson, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 8th day of September 2020, as shown by
the minutes of said meeting in my possession.
________________________
Charlene Friedges, City Clerk
(SEAL)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO:
RESOLUTION DESIGNATING “NO PARKING” AREA ON HAMEL DRIVE
WHEREAS, the City Council for the City of Lakeville is authorized in accordance
with City Code to designate parking zones within the city, and
WHEREAS, the Hamel Drive cul-de-sac west of Headwaters Drive will be
constructed to a width of 28 feet to allow a single traffic lane in each direction with
parking on one side only consistent with the approved street sections in the Avonlea
planned unit development, and
WHEREAS, establishing a “No Parking” area on the Hamel Drive cul-de-sac
west of Headwaters Drive will discourage potential on-street parking, maintain sufficient
access to the traffic lanes, provide increased sight lines for drivers, and reduce the
interaction between vehicles and pedestrians.
NOW, THEREFORE, BE IT RESOLVED, that the north side of the Hamel Drive
cul-de-sac west of Headwaters Drive shall be designated “No Parking” anytime.
ADOPTED by the Lakeville City Council this 8th day of September 2020
CITY OF LAKEVILLE
By: ________________________________
Douglas P. Anderson, Mayor
ATTEST:
__________________________________
Charlene Friedges, City Clerk
3601 Thurston Avenue
Anoka, MN 55303
763.231.5840
TPC@PlanningCo.com
1
MEMORANDUM
TO: Daryl Morey
FROM: D. Daniel Licht, AICP
DATE: 5 August 2020
RE: Lakeville – Avonlea; Pinnacle Reserve at Avonlea 3rd Addition Final Plat
TPC FILE: 135.01
BACKGROUND
D.R. Horton, Inc. has submitted plans to final plat the 3rd Addition of Pinnacle Reserve at
Avonlea, which is located east of Highview Avenue and north of future 185th Street. The
proposed final plat of Outlot K and a portion of Outlot L, Pinnacle Reserve at Avonlea has 32
single family lots within 3 blocks. The subject site is zoned PUD, Planned Unit Development
District as approved by the City Council on 6 April 2015. The City Council approved applications
for the Pinnacle Reserve at Avonlea Preliminary Plat and PUD Development Stage Plan on 20
May 2019.
Exhibits:
A. Site location map
B. Approved Preliminary Plat
C. Final Plat (3 pages)
ANALYSIS
Comprehensive Plan. The 2040 Land Use Plan guides the subject site for Low-to-Medium
Density Residential Uses tased on the Avonlea Illustrative Master. The proposed final plat
includes 32 single family lots that are to be a minimum of 70 feet wide, consistent with the
approved preliminary plat. The proposed final plat is consistent with the Comprehensive Plan.
2
Surrounding Land Uses. The table below summarizes existing and planned land uses
surrounding the subject site. The proposed final plat abuts a City greenway and neighborhood
park and will be compatible with similar 70 foot wide single family lots to the south.
Direction Land Use Plan Zoning Map Existing Use
North Low/Medium Density Residential PUD District Greenway
East Low/Medium Density Residential PUD District Park
South Low/Medium Density Residential
PUD District 70ft. Single family lots
West Low/Medium Density Residential RS-4 District 70ft. Single family lots
Density. The final plat has a gross area of 10.7 acres. There are no wetlands or stormwater
basins within the final plat and no dedication of collector or arterial street right-of-way. The
density of the proposed final plat of 32 single family lots is 3.0 dwelling units per acre.
Lots. The proposed single family lots are consistent with the minimum lot and setback
requirements established by the Avonlea PUD Booklet and Pinnacle Reserve at Avonlea PUD
Development Stage Plan outlined below:
Min.
Lot
Width
Min.
Lot
Depth
Max.
Lot
Cover
Setbacks
Front/
Side Corner
Side
Interior Rear
70ft. 120ft. 50% 20ft. Porch
30ft. garage face 7ft. 20ft. building
15ft. deck
Street. The lots within Block 1 are accessed by Hamel Drive as a cul-de-ac west of Headwaters
Drive. The street was approved as a cul-de-sac with the preliminary plat as compliant with
Section 11-4-3.S of the Subdivision Ordinance, which allows cul-de-sac streets only where
necessary due to limitations caused by natural conditions. The cul-de-sac street has a 50 foot
wide right of way and 28 foot wide street section without a sidewalk. The cul-de-sac street also
complies with Section 11-4-3.S.3 of the Subdivision Ordinance that requires cul-de-sac streets
to be at least 150 feet deep and not more than 600 feet deep with a turnaround end.
The lots within Blocks 2 and 3 of proposed final plat are accessed via intersections with
Headwaters Drive and the existing north terminus of Hamel Drive within the final plat of
Pinnacle Reserve at Avonlea. Construction of Hamel Drive within the proposed final plat is
designed to be consistent with the Transportation Master Plan included within the Avonlea
PUD Booklet. The street has a 32 foot wide section within a 60 foot wide right-of-way. A 5 foot
wide sidewalk is provided on the north and east side of the street.
All street construction plans are to be subject to review and approval of the City Engineer.
3
Landscaping: The developer submitted a landscape plan and details with the preliminary plat.
The landscape plan provides for trees within front yards along interior local streets, which
would include the 32 lots within the proposed final plat. The approved landscaping includes a
residential buffer yard as required by Section 11-21-9.E of the Zoning for Lots 10 and 11, Block
1. All of the tree types and sizes proposed on the landscape plan are consistent with the
requirements of Section 11-21-9.C of the Zoning Ordinance.
Park Dedication. The park dedication requirement for the proposed final plat is to be
calculated based on the preliminary plat for the development. The total park area required to
be dedicated to the City with the preliminary plat by Section 10-4-8.I of the Subdivision
The estimated net area that will be dedicated to the City for parks within the preliminary plat is
5.92 acres, or 39.95 percent of the required park dedication for the preliminary plat. The park
dedication requirement for the remaining 60.05 percent of the land will be required to be a
prorated cash fee in lieu of land for 32 lots at the time of final plat approval.
The developer will construct a trail along the east side of Highview Avenue from Hideaway Trail
to Dodd Boulevard. The construction plans also include a trail from Highview Avenue through
Outlots B and D, Pinnacle Reserve at Avonlea to the existing trail that connects between Hamel
Drive and Cedar Avenue. This trail connection will complete the major greenway corridor
through Avonlea identified by the PUD Master Plan and 2015 Parks, Trails and Open Space Plan.
Grading Plan. The construction plans include stormwater utilities. All grading, drainage, and
erosion control are subject to review and approval of the City Engineer.
Utility Plan. The developer has submitted construction plans for sewer and water utilities to
serve for the final plat. All utility issues are subject to review and approval of the City Engineer.
Easements. The final plat dedicates drainage and utility easements at the perimeter of all
single family lots as required by Section 10-4-4.A of the Subdivision Ordinance. All easements
are subject to review and approval of the City Engineer.
Homeowners Association. The proposed final plat must be incorporated as part of the
Pinnacle Reserve at Avonlea Homeowners Association. All homeowners association
documents must be submitted at the time of initial final plat approval and are to be subject to
review and approval of City staff and the City Attorney.
Development Contract. The developer is required to enter into a development contract with
the City for the public and private improvements, payment of applicable fees, and posting of
required securities. The development agreement will be drafted by the City Attorney and the
developer is required to execute the development agreement prior to City Council approval of
the final plat in accordance with Section 10-5-1 of the Subdivision Ordinance.
4
CONCLUSION
The Pinnacle Reserve at Avonlea 3rd Addition Final Plat is consistent with the requirements of
the Comprehensive Plan, Zoning Ordinance, Subdivision Ordinance and the Avonlea PUD
District. The proposed final plat is also consistent with the approved Pinnacle at Avonlea PUD
Development Stage Plan and preliminary plat. Our office and City staff recommend approval of
the final application, subject to the conditions outlined below:
1. Pinnacle Reserve at Avonlea shall be developed consistent with the approved Avonlea
Master Plan and the PUD booklet dated 10 March 2015, and the PUD Development
Stage Plan.
2. Lots within the final plat shall comply with the following requirements:
Min.
Lot
Width
Min.
Lot
Depth
Max.
Lot
Cover
Setbacks
Front/
Side Corner
Side
Interior Rear
70ft. 120ft. 50% 20ft. Porch
30ft. garage face 7ft. 20ft. building
15ft. deck
3. All right-of-way and street construction plans shall be subject to review and approval of
the City Engineer.
4. Landscaping shall be installed in accordance with the Landscape Plan approved with the
preliminary plat and the developer shall provide a security for installation and warranty
within the Development Agreement.
5. The developer shall pay a cash fee in lieu of land for park dedication purposes as stated
in the Development Agreement less credits for the construction of the greenway
corridor trail.
6. All stormwater management, grading, drainage, and erosion control issues shall be
subject to review and approval of the City Engineer.
7. All utility plans shall be subject to review and approval of the City Engineer.
8. All drainage and utility easements shall be subject to review and approval of the City
Engineer.
9. Documents establishing a homeowners association shall be submitted at the time of
initial final plat approval, subject to review and approval of City staff and the City
Attorney.
5
10. The developer shall execute a development agreement with the City prior to City
Council consideration of the final plat.
c. Justin Miller, City Administrator
Alex Jordan, Assistant City Engineer
John Hennen, Parks and Recreation Director
Andrea McDowell-Poehler, City Attorney
Phone (952) 937-5150 12701 Whitewater Drive, Suite #300
Fax (952) 937-5822 Minnetonka, MN 55343
Toll Free (888) 937-5150
Exhibit B
Exhibit C
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Alex Jordan, Assistant City Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Date: August 28, 2020
Subject: Pinnacle Reserve at Avonlea 3rd Addition
• Final Plat Review
• Final Grading and Erosion Control Plan Review
• Final Utility Plan Review
• Final Tree Preservation Review
BBAACCKKGGRROOUUNNDD
Forestar (USA) Real Estate Group has submitted a final plat named Pinnacle Reserve at
Avonlea 3rd Addition. This is the second phase of the Pinnacle Reserve at Avonlea preliminary
plat approved by the City Council at their May 20, 2019 meeting. The proposed subdivision is
located west of Hamburg Avenue, east of and adjacent to Highview Avenue and north of the
future 185th Street extension (CSAH 60). The parent parcels consist of Outlots K and L, Pinnacle
Reserve at Avonlea, zoned PUD – Planned Unit Development.
The final plat consists of thirty-two (32) single-family lots within three (3) blocks on 10.69
acres.
The proposed development will be completed by:
Developer: Forestar (USA) Real Estate Group aka DR Horton, Inc.
Engineer/Surveyor: Westwood Professional Services, Inc.
PPIINNNNAACCLLEE RREESS EERRVVEE AATT AAVVOONNLLEEAA 33RRDD AADDDDIITTII OONN–– FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2288,, 22002200
PPAAGGEE 22 OOFF 88
SSIITTEE CCOONNDDIITTIIOONNSS
The Pinnacle Reserve at Avonlea 3rd Addition site was mass graded with the overall Pinnacle
Reserve at Avonlea development.
EEAASSEEMMEENNTTSS
The parent parcels contain existing temporary public easements that will expire upon final
platting the underlying parcels into lots and blocks:
• Temporary Drainage and Utility Easement, per Document No. 3328208
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
Highview Avenue
Pinnacle Reserve at Avonlea 3rd Addition is located east of and adjacent to Highview Avenue,
a major collector roadway as identified in the City’s Transportation Plan. Highview Avenue is
currently constructed as a two-lane undivided rural roadway adjacent to the plat. The
necessary right-of-way for Highview Avenue was dedicated with the first phase final plat.
Hamel Drive
Development of Pinnacle Reserve at Avonlea 3rd Addition includes the construction and
extension of Hamel Drive. Hamel Drive is designed as a 32-foot wide urban roadway with a
sidewalk along the north/east side of the roadway east of Headwaters Drive. Hamel Drive will
terminate in a permanent cul-de-sac west of Headwaters Drive. The Developer is dedicating
the necessary right-of-way as shown on the final plat.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and street construction shall be from
an entrance on Headwaters Drive via Hideaway Trail and Highview Avenue. No construction
access shall be allowed from the adjacent residential roadways in Avonlea.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
The park dedication requirement fee has not been satisfied and is required with the final plat,
calculated as follows:
32 lots x $4,509.00 = $144,288.00
Lots in Final Plat Park Dedication Fee Park Dedication Required
with Final Plat
Greenway Corridor Trail
The City’s Parks, Trails, and Open Space Plan identifies a greenway corridor traversing
east/west through the area of the Master Plan. The Developer shall construct a portion of a
trail within the greenway corridor with the final plat. The City shall reimburse the Developer
$59,885 with the final plat for 100% of the costs for bituminous pavement and aggregate
base for the trail construction within the greenway corridor.
PPIINNNNAACCLLEE RREESS EERRVVEE AATT AAVVOONNLLEEAA 33RRDD AADDDDIITTII OONN–– FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2288,, 22002200
PPAAGGEE 33 OOFF 88
Development of Pinnacle Reserve at Avonlea 3rd Addition includes the construction of public
trails and sidewalks. 5-foot wide concrete sidewalks, with pedestrian curb ramps, will be
installed along one side of Hamel Drive except for the Hamel Drive cul-de-sac west of
Headwaters Drive. The Developer shall construct a bituminous trail along the east side of
Highview Avenue from Hideaway Trail to Dodd Boulevard with the final plat. The Developer
will be responsible for 100% of the grading and restoration for the bituminous trail. The
Developer shall receive a $12,180 credit to the final plat cash fees for the City’s 3/8th share
(excluding grading and restoration) of the trail construction costs and a $13,410 credit for
100% of the trail construction costs north of the plat boundary.
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
Pinnacle Reserve at Avonlea 3rd Addition is located within subdistricts NC-20170 of the North
Creek sanitary sewer district as identified in the City’s Sewer Plan.
The wastewater from the development will be conveyed via existing trunk sanitary sewer to
the MCES Farmington Interceptor and continue to the Empire Wastewater Treatment Facility.
The City’s Comprehensive Sewer Plan identifies the sewer downstream of the proposed 18-
inch extension as an area of Potential Future Capacity Constraints. This section of sanitary
sewer should be monitored for capacity as development continues upstream. A future
sanitary sewer analysis may be required to determine the capacity available in the sanitary
sewer downstream.
The Sanitary Sewer Availability Charge has not been collected on the parent parcels and shall
be paid with the final plat . The fee will be based on the current rate in effect at the time of
final plat approval, calculated as follows:
32 units x $327.00 = $10,464.00
Total Units 2020 Sanitary Sewer Availability Charge
Per Unit
Sanitary Sewer
Availability Charge required
WWAATTEERRMMAAIINN
Development of Pinnacle Reserve at Avonlea 3rd Addition includes the extension of public
watermain. Watermain will be extended within the development to provide water service to
the subdivision.
Consistent with the City’s Water Plan, trunk watermain extensions are required to be
completed with the final plat. The Developer shall extend the 12-inch trunk watermain along
Hamel Drive from the existing 20” watermain at Highview Avenue to the east plat boundary.
The City will credit the Developer $17,576.00 for the oversizing of the trunk watermain in the
development. The credit is based on the cost difference between 8-inch watermain and the
oversized watermain that will be installed. The credit will be applied to the Developer’s final
plat cash fees and is based on bid prices provided by the Developer’s engineer.
PPIINNNNAACCLLEE RREESS EERRVVEE AATT AAVVOONNLLEEAA 33RRDD AADDDDIITTII OONN–– FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2288,, 22002200
PPAAGGEE 44 OOFF 88
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
Pinnacle Reserve at Avonlea is located within subdistricts FO-6 and FO-8 of the Farmington
stormwater district as identified in the City’s Water Resources Management Plan. A Vermillion
River Watershed Joint Powers Organization (VRWJPO) Principal Connector and Water Quality
Corridor are located within the site draining from west to east. The water corridors are
conveyed under Cedar Avenue via existing culverts.
The stormwater management basins that will treat the runoff generated from the site were
constructed with the overall mass grading of Pinnacle Reserve of Avonlea.
The City and VRWJPO are planning to make improvements to the water corridors adjacent to
the site. The improvements would include restoration of the channels, repair of eroding
slopes and improving the vegetation. The improvements would be located within Outlots B
and D, Pinnacle Reserve at Avonlea.
The final grading plan shall identify al l fill lots in which the building footings will be placed on
fill material. The grading specifications shall also indicate that all embankments meet
FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings
placed on fill material are appropriately constructed. Building permits will not be issued until
a soils report and an as-built certified grading plan have been submitted and approved by
City staff.
Pinnacle Reserve at Avonlea 3rd Addition contains more than one acre of site disturbance. A
National Pollution Discharge Elimination System General Stormwater Permit for construction
activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre
being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be
submitted to the City upon receipt from the MPCA.
SSTTOORRMM SSEEWWEERR
Development of Pinnacle Reserve at Avonlea 3rd Addition includes the construction of public
storm sewer systems. Storm sewer will be installed within the subdivision to collect and
convey stormwater runoff generated from within the public right-of-way and lots to the
public stormwater management basins located within Outlots B and D, Pinnacle Reserve at
Avonlea.
Draintile construction is required in areas of non-granular soils within Pinnacle Reserve at
Avonlea 3rd Addition for the street sub-cuts and lots. Any additional draintile construction,
including perimeter draintile required for building footings, which is deemed necessary
during construction shall be the developer’s responsibility to install and finance.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcels and must
be paid with the Pinnacle Reserve at Avonlea 3rd Addition final plat, calculated as follows:
PPIINNNNAACCLLEE RREESS EERRVVEE AATT AAVVOONNLLEEAA 33RRDD AADDDDIITTII OONN–– FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2288,, 22002200
PPAAGGEE 55 OOFF 88
465,497.62 s.f. x $0.178/s.f. = $82,858.58
Net Area of
Pinnacle Reserve
at Avonlea 3rd Addition
Single Family
Area Charge
Total Trunk
Storm Sewer Area Charge
RREESSIIDDEENNTTIIAALL BBUUFFFFEERR YYAARRDD RREEQQUUIIRREEMMEENNTTSS
Highview Avenue is a major collector roadway as identified in the City’s Transportation Plan.
A buffer yard containing earth berms and/or plantings of a sufficient density to provide a
visual screen and a reasonable buffer a minimum of ten feet in height shall be provided
adjacent to Highview Avenue. A certified as-built grading plan of the buffer yard berm must
be submitted and approved by City staff prior to the installation of any buffer yard plantings.
FEMA FLOODPLAIN ANALYSIS
Pinnacle Reserve at Avonlea 3rd Addition is shown on the Flood Insurance Rate Map (FIRM) as
Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation,
there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as
determined by FEMA.
WWEETTLLAANNDDSS
There are no wetland impacts proposed with this phase. All wetland permitting was
completed with Pinnacle Reserve at Avonlea 1st Addition.
The Developer is responsible for the installation of 10 Natural Resource Signs along the
wetlands and creek buffers. Final locations must be review by City staff prior to installation.
TTRREEEE PPRREESSEERRVVAATTIIOONN
The site was mass graded with the Pinnacle Reserve at Avonlea 1st Addition. Tree removals
were completed with the 1st addition.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for meeting all the requirements of the MPCA Construction
Permit. A detailed SWPPP must be submitted to the City for review prior to any land
disturbance. Redundant silt fence is required along all wetlands and waterways that do not
have a 50-foot established buffer.
The Developer is responsible for the establishment of native vegetation around all
stormwater treatment basins and any disturbed or farmed buffer. The Developer is
responsible for establishment of native seeding within all stormwater basin, creek/wetland
buffers and any area outside of the city park. A management plan including a schedule for
the establishment and a minimum of 3 years of maintenance must be submitted to the City
for review.
PPIINNNNAACCLLEE RREESS EERRVVEE AATT AAVVOONNLLEEAA 33RRDD AADDDDIITTII OONN–– FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2288,, 22002200
PPAAGGEE 66 OOFF 88
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Vermillion River Watershed JPO. Any additional measures
required shall be installed and maintained by the developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Pinnacle Reserve at Avonlea 3rd Addition. Construction costs are
based upon estimates submitted by the Developer’s engineer on August 21, 2020.
CONSTRUCTION COSTS
Sanitary Sewer $ 196,792.20
Watermain 167,574.00
Storm Sewer 155,565.80
Street Construction 324,423.38
Erosion Control and Restoration 40,000.00
SUBTOTAL - CONSTRUCTION COSTS $884,355.38
OTHER COSTS
Developer’s Design (3.0%) $ 26,530.66
Developer’s Construction Survey (2.5%) 22,108.88
City’s Legal Expense (0.5%) 4,421.78
City Construction Observation (5.0%) 44,217.77
Developer’s Record Drawing (0.5%) 4,421.78
Natural Area Signs 1,500.00
Landscaping 65,000.00
Street Lights 4,800.00
Lot Corners/Iron Monuments 3,200.00
SUBTOTAL - OTHER COSTS $176,200.87
TOTAL PROJECT SECURITY $1,060,556.25
The street light security totals $4,800 which consists of four (4) post-top street lights at $1,200
each.
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$3,200.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
CCAASSHH FFEEEESS
A $3,300.00 cash fee for traffic control signs is due with Pinnacle Reserve at Avonlea 3rd
Addition. If the street signs are installed during frost conditions, the developer shall pay an
additional $150.00 for each street sign location.
PPIINNNNAACCLLEE RREESS EERRVVEE AATT AAVVOONNLLEEAA 33RRDD AADDDDIITTII OONN–– FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2288,, 22002200
PPAAGGEE 77 OOFF 88
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
32 units x $40.48/unit = $1,295.36
Dwelling Units Streetlight Operating Fee Total
A cash fee for one-year of environmental resources management expenses shall be paid at
the time of final plat approval and is calculated as follows:
32 units x $66.16/unit = $2,117.12
Single Family
Dwelling Units
Environmental Resources
Management Fee
Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
32 units x $90.00/unit = $2,880.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administ ration will be based on three percent (3.00%) of the estimated
construction cost, or $26,530.66.
CASH REQUIREMENTS
Park Dedication 144,288.00
Sanitary Sewer Availability Charge 10,464.00
Trunk Storm Sewer Area Charge 82,858.58
Traffic Control Signs 3,300.00
Streetlight Operating Fee 1,295.36
Environmental Resources Management Fee 2,117.12
City Base Map Updating Fee 2,880.00
City Engineering Administration (3.00%) 26,530.66
SUBTOTAL - CASH REQUIREMENTS $273,733.72
CREDITS TO THE CASH REQUIREMENTS
City’s 100% Trail Cost – Greenway Trail (Park Dedication) $ 59,885.00
City’s 3/8th Share of Trail Costs - Highview Avenue (Park Dedication)
City’s 100% Trail Cost - Highview Avenue (Park Dedication)
Trunk Watermain Oversizing (Trunk Water Fund)
12,180.00
13,410.00
17,576.00
SUBTOTAL - CREDITS TO THE CASH REQUIREMENTS = $ 103,051.00
TOTAL CASH REQUIREMENTS $170,682.72
PPIINNNNAACCLLEE RREESS EERRVVEE AATT AAVVOONNLLEEAA 33RRDD AADDDDIITTII OONN–– FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2288,, 22002200
PPAAGGEE 88 OOFF 88
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the final plat, grading and erosion control plan, and
utility plan for Pinnacle Reserve at Avonlea 3rd Addition, subject to the requirements and
stipulations within this report.