Loading...
HomeMy WebLinkAbout17915 Hawksbill Dr SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. ENGINEERING REVIEWED Date:__________________09/04/2020 corlowsky EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. Zoning = RS-4