Loading...
HomeMy WebLinkAbout17951 Havana Path-SURVEYZoning = RS-4 *Draintile connection required. ENGINEERING REVIEWED Date:__________________09/03/2020 corlowsky The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION