SPIRIT OF BRANDTJEN FARM 23RD ADDITION FINAL PLAT
Proposed Action
Staff recommends adoption of the following motion: Move to approve: 1) a resolution
approving the Spirit of Brandtjen Farm 23rd Addition final plat, and 2) a resolution establishing
no parking areas.
Overview
Tradition Development (a/k/a SBF Development Corp.) representatives are requesting approval
of the Spirit of Brandtjen Farm (SBF) 23rd Addition final plat, which consists of 47 detached
townhouse lots, five common area HOA lots, and four outlots located south of 160th Street
(CSAH 46), north of 161st Street, and east of Eagleview Drive. This is the second phase of the
SBF 21st Addition preliminary plat of 43 attached townhouse lots and 99 detached townhome lots
approved by the City Council on April 1, 2019. The SBF 21st Addition final plat of 43 attached
townhome lots and 52 detached townhome lots was approved by the City Council on June 17,
2019. The layout of the SBF 21st Addition final plat is consistent with the approved preliminary
plat. In conjunction with the SBF 21st Addition final plat, a no parking resolution is required
consistent with the street designs approved with the SBF PUD.
Primary Issue to Consider
• Why is an access easement agreement included with this final plat? An easement is needed for
the publicly accessible, privately maintained sidewalks proposed within Outlot B, which will be
owned by the SBF HOA.
Supporting Information
• Final plat and no parking resolutions
• Signed development contract and PUD agreement and easement agreement
• August 20, 2020 planning memo and September 16, 2020 engineering memo
Financial Impact: $ None Budgeted: Y☐ N☐ Source:
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: A Home for All Ages and Stages of Life
Report Completed by: Daryl Morey, Planning Director
September 21, 2020
Subdivision Ordinance, SBF PUD Booklet
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. __________
RESOLUTION APPROVING THE FINAL PLAT OF
SPIRIT OF BRANDTJEN FARM 23RD ADDITION
WHEREAS, the owner of the plat described as Spirit of Brandtjen Farm 23rd
Addition has requested final plat approval; and
WHEREAS, the preliminary plat was reviewed by the Planning Commission and
the Parks, Recreation and Natural Resources Committee and approved by the City
Council; and
WHEREAS, the final plat is consistent with the approved preliminary plat; and
WHEREAS, the final plat is acceptable to the City.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The final plat of Spirit of Brandtjen Farm 23rd Addition is hereby approved
subject to the development contract and planned unit development
agreement, the security requirements, and the terms and conditions of the
Spirit of Brandtjen Farm Master Planned Unit Development Stage Plan
Agreement dated October 17, 2005.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars and
to execute the development contract and planned unit development
agreement, the easement agreement, and all documents required pursuant to
the development contract.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 21st day of September 2020.
CITY OF LAKEVILLE
BY: _______________________
Douglas P. Anderson, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 21st day of September 2020 as shown by
the minutes of said meeting in my possession.
________________________
Charlene Friedges, City Clerk
(SEAL)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO:
RESOLUTION DESIGNATING “NO PARKING” AREAS ON DUVANE WAY
WHEREAS, the City Council for the City of Lakeville is authorized in accordance
with City Code to designate parking zones within the city, and
WHEREAS, the section of Duvane Way will be constructed to allow a single
traffic lane in each direction with parking on one side only in Spirit of Brandtjen Farm
23rd Addition, consistent with the approved street sections in the Spirit of Brandtjen
Farm planned unit development, and
WHEREAS, establishing “No Parking” areas on Duvane Way will discourage
potential on-street parking, maintain sufficient access to the traffic lanes, provide
increased sight lines for drivers, and reduce the interaction between vehicles and
pedestrians.
NOW, THEREFORE, BE IT RESOLVED, that the inner loop of Duvane Way
shall be designated “No Parking” anytime.
ADOPTED by the Lakeville City Council this 21st day of September 2020.
CITY OF LAKEVILLE
By: ________________________
Douglas P. Anderson, Mayor
ATTEST:
__________________________________
Charlene Friedges, City Clerk
3601 Thurston Avenue
Anoka, MN 55303
763.231.5840
TPC@PlanningCo.com
1
MEMORANDUM
TO: Daryl Morey
FROM: D. Daniel Licht, AICP
DATE: 20 August 2020
RE: Lakeville – Spirit of Brandtjen Farm; 23rdAddition Final Plat
TPC FILE: 135.01
BACKGROUND
SBF Development Corporation has submitted application to final plat Spirit of Brandtjen Farm
23rd Addition. The final plat consists of 47 detached townhouse dwelling units, 4 outlots, and
public right-of-way to be developed upon Outlot F, SBF 21st Addition, which is located east of
Eagleview Drive and north of 161st Street. The subject site is zoned PUD, Planned Unit
Development District as approved by the City Council on 20 June 2005. The PUD Development
Stage Plan and preliminary plat for SBF 21st Addition was approved by the City Council on 1
April 2019.
Exhibits:
A. Site Location Map
B. Approved Preliminary Plat
C. Landscape Plan (3 sheets)
D. Final Plat (3 sheets)
ANALYSIS
SBF Land Use Plan. The SBF Master Land Use Plan (Page 3.4 of the SBF PUD Booklet)
designates development of the subject site for Residential Village Center abutting Eagleview
Drive with Medium Density Residential uses at 6 to 8 dwelling units per acre extending east to
the regional greenway corridor trail. The overall density of the preliminary plat is 6.75 dwelling
units per acre. The area of Outlot F, SBF 21st Addition is 8.6 acres. The proposed density of the
2
47 detached townhouses proposed within the SBF 23rd Addition Final Plat is 5.47 dwelling units
per acre. As approved with the PUD Development Stage Plan for SBF 21st Addition, the
proposed detached townhouse dwellings within the final plat provide a transitional land use
between Eagleview Drive and the public elementary school to the east consistent with the SBF
Land Use Plan.
Lot Area. The PUD Development Stage Plan for the subject site included allowance for 4,762
square feet of lot area per dwelling unit. The proposed number of dwelling units within the
subject site has been approved based on the key flexibilities established for the SBF PUD
District for density transfer. Allowance of the lot area per dwelling unit for the proposed
development is also appropriate in the context of an acceptable site plan that provides for a
unique neighborhood character.
Setbacks. The table below indicates the required setbacks for the proposed development as
established by the PUD Development Stage Plan approval to provide for building forward
streetscape character and to allow the detached townhouse buildings to be shifted to one side
of the unit lot line. This offset of the detached townhouse building within the unit lot allows
opportunity for outdoor living areas to the side the building within a larger side yard, which is a
creative and efficient use of the area between structures.
Yard Structure Min.
Setback
Front Building 15ft.
Garage Door NA
Side-Corner Building 15ft.
Rear Building NA
Garage Door 25ft.
Between
Buildings
Detached
TH
Sidewall to sidewall 14ft.
Sidewall to unenclosed deck or pergola 7ft. ROW/Buildings Guest parking 15ft.
Streets. The final plat provides for Duvane Way off of 161st Street as a public street within a 52
foot wide right-of-way and with a 28 foot wide street section consistent with the design for
SC.3 established by the SBF PUD Booklet. Parking will be restricted to one side of Duvane Way
at the time of final plat approval. The construction plan for the proposed public street is to be
subject to review and approval of the City Engineer.
Private Drives. The final plat includes 4 private drives within outlots for rear loaded access to
the attached garage for each detached townhouse. The section design for the private drives
are 20 feet in width and have concrete curb on each side. The proposed private drive section
design is consistent with the standards incorporated as part of the SBF PUD Booklet. The
proposed private drives are to be posted as fire lanes with no parking allowed. The
construction plans for the proposed private drives are to be subject to review and approval of
the City Engineer.
3
Trails/Sidewalks. A trail is currently under construction along the south side of 160th Street
(CSAH 46) from Eagleview Drive to Diamond Path abutting the subject site. There is an existing
five-foot wide sidewalk abutting the subject site on the north side of 161st Street. The
submitted plans indicate that five-foot wide concrete sidewalks will be constructed both sides
of Duvane Way at the front of the detached townhouse dwellings (but not including on the
north side not of Duvane Way between Lots 9 and 10, Block 1). The site plan also provides for 2
sidewalks within Outlot B at the front of the row townhomes within Blocks 3 and 4.
Construction plans for the proposed sidewalks are to be subject to review and approval of the
City Engineer.
Landscaping. A landscape plan has been submitted for the proposed final plat that includes
street boulevards, private drives, common open spaces, and the typical foundation plantings
for the townhouse and detached townhouse dwellings. A landscape buffer yard abutting 160th
Street (CSAH 46) consistent with previous phases of SBF is also illustrated on the landscape
plan, with the plantings installed on the interior side of a 10 foot high berm. The types and
sizes of proposed plantings comply with Section 11-21-9.C.1 of the Zoning Ordinance. The
developer must provide cost estimates for the plantings to be installed to verify compliance
with the requirements of Section 11-58-21.J.1 of the Zoning Ordinance.
Park Dedication. The final plat for SBF 23rd Addition does not include dedication of land to the
City for public parks in accordance with the 2015 Parks, Trails, and Open Space Plan. Park
dedication requirements are to be satisfied by payment of a cash fee in lieu of land at the time
of final plat approval based on the provisions of the SBF Master PUD Agreement.
Easements. Section 10-4-4 of the Subdivision Ordinance requires 10-foot wide drainage and
utility easements at the perimeter of the base lots. The final plat provides for dedication of
drainage and utility easements over all of the base lots as well as over all of the outlots. The
proposed drainage and utility easements comply with the Subdivision Ordinance. All drainage
and utility easements are subject to review and approval of the City Engineer.
Grading. The plans with the final plat application include grading, drainage, and erosion control
plans. All grading plans are subject to review and approval by the City Engineer.
Utilities. The subject site is included within the current MUSA. Plans for construction of sewer
and water utilities to the detached townhomes within the proposed final plat have been
submitted. All utility plans are subject to review and approval of the City Engineer.
Outlots. The preliminary plat includes the following outlots:
Outlots Purpose Ownership
A, C, D Private drive HOA
B Publicly accessible/privately maintained sidewalk HOA
4
Homeowners Association. Documents including SBF 23rd Addition as part of the SBF Master
Homeowners Association and establishing separate homeowners association provisions for the
detached townhomes are required. All homeowners association documents are subject to
review and approval by the City Attorney.
Development Agreement. Section 10-5-1.A of the Subdivision Ordinance requires the
developer to provide construction and warranty securities for the public improvements within
the final plat that are to be outlined within a development agreement. The development
agreement is to be drafted by the City Attorney and executed by the applicant prior to City
Council consideration of the final plat.
Dakota County. The subject site abuts 160th Street (CSAH 46). Right-of-way for 160th Street
(CSAH 46) has been dedicated with prior final plat approvals. The proposed SBF 23rd Addition
final plat is subject to review and approval by the Dakota County Plat Commission.
CONCLUSION
The final plat for SBF 23rd Addition final plat is consistent with the requirements of the SBF PUD
District, Zoning Ordinance, Subdivision Ordinance, and PUD Development Stage Plan and
preliminary plat. Our office and City staff recommend approval of the proposed development
subject to the conditions outlined below:
1. SBF 23rd Addition shall be developed consistent with the approved SBF Master Plan, the
PUD booklet dated 20 June 2005 and the PUD Development Stage Plan/Preliminary Plat.
2. Structures within SBF 23rd Addition shall be subject to the lot requirements in
accordance with the PUD Standards table on page 7.1 of the SBF PUD Booklet, except as
modified below:
Yard Structure Min.
Setback
Front Building 15ft.
Garage Door NA
Side-Corner Building 15ft.
Rear Building NA
Garage Door 25ft.
Between
Buildings
Detached
TH
Sidewall to sidewall 14ft.
Sidewall to unenclosed deck or pergola 7ft. ROW/Buildings Guest parking 15ft.
3. All street, private drive, and sidewalk construction plans shall be subject to review and
approval of the City Engineer.
5
4. The developer shall submit cost estimates for the plantings to be installed in accordance
with the landscape plan to verify compliance with the requirements of Section 11-58-
21.J.1 of the Zoning Ordinance.
5. Park dedication requirements shall be satisfied at the time of final plat approval as
payment of a cash fee in lieu of land based on the formula established by the SBF
Master PUD Development Agreement.
6. All drainage and utility easements shall be subject to review and approval of the City
Engineer.
7. All grading, drainage and erosion control plans shall be subject to review and approval
of the City Engineer.
8. All utility plans shall be subject to review and approval of the City Engineer.
9. Outlots A, B, C, and D shall be conveyed to a homeowners association.
10. Homeowners Association documents for SBF 23rd Addition shall be subject to review
and approval by the City Attorney.
11. The applicant shall execute a development agreement with the City as drafted by City
Attorney and subject to approval of the City Council.
12. The proposed SBF 23rd Addition final plat shall be subject to review and approval by the
Dakota County Plat Commission.
c. Justin Miller, City Administrator
Alex Jordon, Senior Project Engineer
John Hennen, Parks and Recreation Director
Andrea McDowell Poehler, City Attorney
KNOW ALL PERSONS BY THESE PRESENTS: That Cobblestone Lake, LLC, a Minnesota limited liability
company, fee owner and SBF Development Corp., a Minnesota corporation, contract purchaser, of
the following described property:
Outlot F, SPIRIT OF BRANDTJEN FARM 21ST ADDITION, according to the recorded plat thereof,
Dakota County, Minnesota
Have caused the same to be surveyed and platted as SPIRIT OF BRANDTJEN FARM 23RD ADDITION
and do hereby dedicate to the public for public use the public ways and the drainage and utility
easements as created on this plat.
In witness whereof said Cobblestone Lake, LLC, a Minnesota limited liability company, has caused
these presents to be signed by its proper officer this day of , 20 .
Cobblestone Lake, LLC
By: the
STATE OF
COUNTY OF
This instrument was acknowledged before me on , by
the of
Cobblestone Lake, LLC, a Minnesota limited liability company, on behalf of the company.
Signature
Printed
Notary Public, County,
My commission expires
In witness whereof said SBF Development Corp., a Minnesota corporation, has caused these presents
to be signed by its proper officer this day of , 20 .
SBF Development Corp.
By: the
STATE OF
COUNTY OF
This instrument was acknowledged before me on ,
by the of
SBF Development Corp., a Minnesota corporation, on behalf of the corporation.
Signature
Printed
Notary Public, County,
My commission expires
I, Marcus F. Hampton, do hereby certify that this plat was prepared by me or under my direct
supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a
correct representation of the boundary survey; that all mathematical data and labels are correctly
designated on this plat; that all monuments depicted on this plat have been or will be correctly set
within one year; that all water boundaries and wet lands as defined in Minnesota Statutes, Section
505.01, Subd. 3, as of the date of this certificate are shown and labeled on this plat; and all public
ways are shown and labeled on this plat.
Dated this day of , 20
______________________________________________________________
Marcus F. Hampton, Licensed Land Surveyor, Minnesota License No. 47481
STATE OF MINNESOTA
COUNTY OF
This instrument was acknowledged before me on this day of , 20 ,
by Marcus F. Hampton.
Signature
Printed
Notary Public, County,
My commission expires
CITY COUNCIL OF CITY OF LAKEVILLE, COUNTY OF DAKOTA, STATE OF MINNESOTA
This plat of SPIRIT OF BRANDTJEN FARM 23RD ADDITION was approved and accepted by the City
Council of the City of Lakeville, Minnesota at a regular meeting thereof held this day of
, 20 , and said plat is in compliance with the provisions of Minnesota
Statutes, Section 505.03, Subd. 2.
By:
Mayor Clerk
BEARINGS ARE BASED ON THE NORTH LINE OF OUTLOT F,
SPIRIT OF BRANDTJEN FARM 23RD ADDITION WHICH IS
ASSUMED TO HAVE A BEARING OF N 89°53'04" E
NOTE: NO MONUMENT SYMBOL SHOWN AT ANY STATUTE
REQUIRED LOCATION INDICATES A PLAT MONUMENT THAT WILL
BE SET WITHIN ONE YEAR FROM THE RECORDING DATE OF THIS
PLAT. SAID MONUMENTS SHALL BE 1/2 INCH x 14 INCH
IRON PIPES MARKED BY R.L.S. NO. 47481.
DENOTES 1/2 INCH IRON MONUMENT FOUND AND
MARKED BY R.L.S. NO. 47481
DENOTES RESTRICTED ACCESS TO DAKOTA COUNTY PER
THE DAKOTA COUNTY CONTIGUOUS PLAT ORDINANCE
AND DOC NOS. 3139211, 3157300 AND 3157301
COUNTY SURVEYOR, COUNTY OF DAKOTA, STATE OF MINNESOTA
I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has
been reviewed and approved this day of , 20 .
By:
Todd B. Tollefson, Dakota County Surveyor
COUNTY BOARD, COUNTY OF DAKOTA, STATE OF MINNESOTA
We do hereby certify that on the _____ day of ___________, 20___, the Board of Commissioners of
Dakota County, Minnesota, approved this plat of SPIRIT OF BRANDTJEN FARM 23RD ADDITION and
said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2, and
pursuant to the Dakota County Contiguous Plat Ordinance.
By: ___________________________________ Attest: ___________________________________
Chair, Dakota County Board Dakota County Treasurer - Auditor
DEPARTMENT OF PROPERTY TAXATION AND RECORDS, COUNTY OF DAKOTA,
STATE OF MINNESOTA
Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20 on the
land hereinbefore described have been paid. Also pursuant to Minnesota Statutes, Section 272.12,
there are no delinquent taxes and transfer entered this day
of , 20 .
By:
Amy A. Koethe, Director
Department Of Property Taxation and Records
COUNTY RECORDER, COUNTY OF DAKOTA, STATE OF MINNESOTA
I hereby certify that this plat of SPIRIT OF BRANDTJEN FARM 23RD ADDITION was filed in the office of
the County Recorder for public record on this day of , 20 ,
at o'clock . M. and was duly filed in Book
of Plats, Page , as Document Number .
Amy A. Koethe, County Recorder
BEARINGS ARE BASED ON THE NORTH LINE OF OUTLOT F,
SPIRIT OF BRANDTJEN FARM 23RD ADDITION WHICH IS
ASSUMED TO HAVE A BEARING OF N 89°53'04" E
NOTE: NO MONUMENT SYMBOL SHOWN AT ANY STATUTE
REQUIRED LOCATION INDICATES A PLAT MONUMENT THAT WILL
BE SET WITHIN ONE YEAR FROM THE RECORDING DATE OF THIS
PLAT. SAID MONUMENTS SHALL BE 1/2 INCH x 14 INCH
IRON PIPES MARKED BY R.L.S. NO. 47481.
DENOTES 1/2 INCH IRON MONUMENT FOUND AND
MARKED BY R.L.S. NO. 47481
DENOTES RESTRICTED ACCESS TO DAKOTA COUNTY PER
THE DAKOTA COUNTY CONTIGUOUS PLAT ORDINANCE
AND DOC NOS. 3139211, 3157300 AND 3157301
DRAINAGE AND UTILITY EASEMENTS
BEING 10 FEET IN WIDTH, UNLESS
OTHERWISE INDICATED, ADJOINING
LOT LINES AND RIGHT OF WAY LINES,
AS SHOWN ON THE PLAT.
DRAINAGE AND UTILITY EASEMENTS
ARE SHOWN THUS:
BEARINGS ARE BASED ON THE NORTH LINE OF OUTLOT F,
SPIRIT OF BRANDTJEN FARM 23RD ADDITION WHICH IS
ASSUMED TO HAVE A BEARING OF N 89°53'04" E
NOTE: NO MONUMENT SYMBOL SHOWN AT ANY STATUTE
REQUIRED LOCATION INDICATES A PLAT MONUMENT THAT WILL
BE SET WITHIN ONE YEAR FROM THE RECORDING DATE OF THIS
PLAT. SAID MONUMENTS SHALL BE 1/2 INCH x 14 INCH
IRON PIPES MARKED BY R.L.S. NO. 47481.
DENOTES 1/2 INCH IRON MONUMENT FOUND AND
MARKED BY R.L.S. NO. 47481
DENOTES RESTRICTED ACCESS TO DAKOTA COUNTY PER
THE DAKOTA COUNTY CONTIGUOUS PLAT ORDINANCE
AND DOC NOS. 3139211, 3157300 AND 3157301
DRAINAGE AND UTILITY EASEMENTS
BEING 10 FEET IN WIDTH, UNLESS
OTHERWISE INDICATED, ADJOINING
LOT LINES AND RIGHT OF WAY LINES,
AS SHOWN ON THE PLAT.
DRAINAGE AND UTILITY EASEMENTS
ARE SHOWN THUS:
City of Lakeville
Public Works– Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Alex Jordan, Assistant City Engineer
McKenzie Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Date: September 16, 2020
Subject: Spirit of Brandtjen 23rd Addition
• Final Plat Review
• Final Grading Plan Review
• Utility Plan Review
• Erosion Control Plan Review
BBAACCKKGGRROOUUNNDD
SBF Development Corporation has submitted a final plat named Spirit of Brandtjen Farm (SBF)
23rd Addition. The proposed development is located south of and adjacent to 160th Street
(CSAH 46), west of Diamond Path (future CSAH 33), east of and adjacent to Eagleview Drive,
and north of and adjacent to 161st Street. The parent parcel consists of Outlots F, Spirit of
Brandtjen Farm 21st Addition. The development is zoned PUD, Planned Unit Development.
The final plat consists of 47 detached townhome lots, 5 common open space lots within 5
blocks and four (4) outlots. The outlots created with the final plat will have the following uses:
Outlot A: Private roadway; to be retained by the Developer (0.51 acres)
Outlot B: Private sidewalk greenway corridor and public utilities; to be retained by the
Developer (0.91 acres)
Outlot C: Private roadway; to be retained by the Developer (0.51 acres)
Outlot D: Private roadway; to be retained by the Developer 0.10 acres)
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2233RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22002200
PPAAGGEE 22
The proposed development will be completed by:
Developer: SBF Development Corporation
Engineer/Survey or: James R. Hill, Inc.
SSIITTEE CCOONNDDIITTIIOONNSS
The site was previously a gravel processing operation. The gravel processing on the pa rent
parcels has been completed and the site encroachments have been removed.
EEAASSEEMMEENNTTSS
The following easement will expire upon final platting of the underlying outlot into lots and
blocks:
• Temporary Grading and Construction Easement per Doc. No. 3316285
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
160th Street (CSAH 46)
SBF 23rd Addition is located south of and adjacent to 160th Street, a minor arterial County roadway
as identified in the City’s Transportation Plan. 160th Street adjacent to the site is a four-lane
divided urban roadway, with a continuous concrete center median island. Dakota County
controls the right-of -way requirements and access locations along 160th Street. The current
Dakota County Plat Review Needs Map indicates a half right-of-way requirement of 100-feet and
designates this roadway as a future six-lane divide d urban roadway over its entire length adjacent
to the plat. The widening of 160th Street is not identified in the City’s or County’s current Capital
Improvement Plans. The final plat were reviewed and recommended for approval by the Dakota
County Plat Commission at their September 16, 2020 meeting.
Duvane Way
Development of Spirit of Brandtjen Farm 23rd Addition includes the construction of Duvane
Way, a local roadway. Duvane Way is designed as a 28-foot wide urban roadway with a 5-foot
wide concrete sidewalk along both sides of the street, with the exception of the north portion
of the roadway abutting 160th Street. The Developer is dedicating 52-feet of right-of-way. The
street and landscaped boulevard design is consistent with the Spirit of Brandtjen Farm
Planned Unit Development Plan.
Private Roadways
Development of Spirit of Brandtjen Farm 23rd Addition includes the construction of several
privately owned and maintained roadways (alleys) providing driveway access to the
residential lots. The private roadways are designed as 20-foot wide urban roadways. The
Developer is dedicating a 55-foot wide drainage and utility easement over the private
roadways. Utilities located within the private roadway shall be privately owned and
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2233RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22002200
PPAAGGEE 33
maintained. The street and landscaped boulevard design is consistent with the Spirit of
Brandtjen Farm Planned Unit Development Plan.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and street construction for SBF 23rd
Addition shall be from a single rock construction entrance off of 161st Street and Duvane Way.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
Development of SBF 23rd Addition includes the construction of public sidewalks and trails. 5-
foot wide concrete sidewalks will be constructed along both sides of all streets with the
exception of the north portion of the roadway abutting 160th Street. Privately owned and
maintained sidewalks will be constructed within Outlot B.
The Parks, Trails, and Open Space Plan identifies a 10-foot wide bituminous trail along the
south side of 160th Street adjacent to the development. This trail is currently under
construction with City Project No. 20-11.
The Park Dedication Fee has not been collected on the parent parcel and will be required to
be collected with the final plat, calculated as follows:
47 units x $2,250 = $105,750.00
Detached Units in
SBF 21st Addition
Detached Unit Park
Dedication Rate
SBF 23rd Addition
Park Dedication Fee
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR::
SBF 23rd Addition is located within sub-district NC-20060 of the North Creek sanitary sewer
district as identified in the City’s Comprehensive Sewer Plan. Wastewater will be conveyed via
existing trunk sanitary sewer to the MCES Farmington Interceptor and continue to the Empire
Wastewater Facility. The downstream facilities have sufficient capacity to serve the proposed
subdivision.
The Sanitary Sewer Availability Charge has not been collected on the parent parcel and must
be paid with the final plat. The fee will be based on the rate in effect at the time of final plat
approval, calculated as follows:
47 units x $327.00/unit = $15,369.00
Units in SBF 23rd Addition Sanitary Sewer
Availability Charge
Total Required with
the final plat
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2233RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22002200
PPAAGGEE 44
WWAATTEERRMMAAIINN::
The Developer is connecting to existing 8-inch watermain stubs to provide water service to
the subdivision. The public utilities located within Outlot B shall be constructed to City
standards.
Final locations and sizes of all public sanitary sewer and watermain facilities will be reviewed
by City staff with the final construction plans.
OOVVEERRHHEEAADD LLIINNEESS
There are no existing overhead utility lines and/or poles within the parent parcels.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
BBAACCKKGGRROOUUNNDD
Spirit of Brandtjen Farm (SBF) is a planned unit development of which development began in
2005. The proposed development encompasses nearly all of the north half of Section 1,
Township 114, Range 20 and a substantial portion of the south half of said section. The initial
stormwater modeling and drainage plan for SBF, located on the south half of Section 1, was
prepared by Westwood Professional Services. The original design consisted of a main basin,
Spirit, surrounded by six National Urban Runoff Program (NURP) basins.
The Spirit basin design did not include a gravity outlet other than infiltration. A system of
pumps was incorporated into the design to serve three functions: 1) Irrigation supply, 2)
Recirculation for water features, and 3) Drawdown, if needed. During 2008, a decision was
made to not construct the recirculation features. As a result, the proposed pumping station
was not constructed, however, the pump station draw intake line was.
As development has continued, Spirit basin appears to have adequately infiltrated all runoff
from the development without the presence of the pumping system.
A gravel processing area has been in operation on the north half of Section 1 in excess of forty
years. As part of gravel operations years ago, a series of basins was constructed as wash basins
for sand processing. The operational need for these basins ended approximately in 2013 and
a reclamation plan was prepared for the gravel processing area. As part of the reclamation
plan, the largest basin was measured and quantified, and incorporated into the reclamation
plan with intended use as a stormwater management basin. The basin is referred to as
Nordeast Basin.
PPRROOPPOOSSEEDD SSTTOORRMMWWAATTEERR MMAANNAAGGEEMMEENNTT PPLLAANN
SBF 23rd Addition is located within the North Creek drainage district as identified in the City’s
Water Resources Management Plan. The plat is located within sub-districts NC-13 and NC 14-
B.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2233RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22002200
PPAAGGEE 55
The proposed stormwater management plan is a regional plan that connects the 96 acres
within the Nordeast Basin drainage area. The proposed system utilizes the existing Nordeast
Basin for flood storage and infiltration, having peripheral National Urban Runoff Protection
(NURP) and stormwater collection systems. The pretreatment NURP basins are multi-celled.
The stormwater management system to serve SBF 23rd Addition was constructed with
development of SBF 18th Addition and SBF Commercial 2nd Addition.
A National Pollution Discharge Elimination System General Stormwater Permit for
construction activity is required by the Minnesota Pollution Control Agency for areas
exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit
Coverage must be submitted to the City upon receipt from the MPCA.
SSTTOORRMM SSEEWWEERR
Development of SBF 23rd Addition includes the construction of a public and private storm
sewer system. Storm sewer will be installed to collect and convey stormwater runoff
generated from the streets and open space within the development. The storm sewer will
convey the runoff to the stormwater management basins located downstream of the
development. The constructed public storm sewer shall be located within public right-of-way
and/or public drainage and utility easements.
The Trunk Storm Sewer Area Charge will not be collected for SBF 23rd Addition as the entire
area of the plant drains directly to Nordeast.
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FFEEMMAA FFLLOOOODDPPLLAAIINN AANNAALLYYSSIISS
The area of SBF 23rd Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by
the Federal Emergency Management Agency (FEMA). Based on this designation, the
development is not located within a Special Flood Hazard Area (SFHA), as determined by
FEMA.
WWEETTLLAANNDDSS
There are no wetlands within the project area.
TTRREEEE PPRREESSEERRVVAATTIIOONN
There are no significant trees within the project area.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2233RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22002200
PPAAGGEE 66
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing and maintaining the SWPPP throughout construction phase. The permit requires
that all erosion and sediment BMPS be clearly outlined in a site’s SWPPP. Changes made
throughout construction should be documented in the SWPPP.
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Dakota County Soil and Water District. Any additional measures
required shall be installed and maintained by the developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Spirit of Brandtjen Farm 23rd Addition. Construction costs are based
upon estimates submitted by the Developer’s engineer on August 26, 2020.
CONSTRUCTION COSTS
Sanitary Sewer $ 108,159.33
Watermain 150,994.41
Storm Sewer 100,566.86
Street Construction 326,025.50
Erosion Control, Grading Certification and Restoration 26,629.00
SUBTOTAL - CONSTRUCTION COSTS $ 712,375.10
OTHER COSTS
Developer’s Design (3.0%) $ 21,371.25
Developer’s Construction Survey (2.5%) 17,809.38
City’s Legal Expense (0.5%) 3,561.88
City Construction Observation (5.0%) 35,618.76
Developer’s Record Drawing (0.5%) 3,561.88
Landscaping 100,870.00
Street Lights 7,200.00
Lot Corners/Iron Monuments 5,600.00
SUBTOTAL - OTHER COSTS $195,593.15
TOTAL PROJECT SECURITY $ 907,968.25
The street light security totals $7,200 which consists of six (6) post-top street lights at $1,200
each.
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2233RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22002200
PPAAGGEE 77
$5,600.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
CASH FEES
A $2,050 cash fee for traffic control signs is due with Spirit of Brandtjen Farm 23rd Addition. If
the street signs are installed during frost conditions, the developer shall pay an additional
$150.00 for each street sign location.
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
47 units x $10.12/unit/qtr. x 4 qtrs. = $1,902.56
Dwelling Units Streetlight Operating Fee Total
A cash fee for one-year of environmental resources expenses shall be paid at the time of final
plat approval and is calculated as follows:
47 units x $16.54/unit/qtr. x 4 qtrs. = $3,109.52
Dwelling Units Environmental Resources Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
56 units x $90.00/unit = $5,040.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $21,371.25.
CASH REQUIREMENTS
Park Dedication Fee $ 105,750.00
Sanitary Sewer Availability Charge 15,369.00
Traffic Control Signs 2,050.00
Streetlight Operating Fee 1,902.56
Environmental Resources Fee 3,109.52
City Base Map Updating Fee 5,040.00
City Engineering Administration (3.00%) 21,371.25
TOTAL - CASH REQUIREMENTS $154,592.33
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 2233RRDD AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22002200
PPAAGGEE 88
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the SBF 23rd Addition final plat, grading plan, utility
plan, and erosion control plan subject to the requirements and stipulations of this report.