HomeMy WebLinkAbout18940 Katrine Ct SurveyZoning = RS-2FY - 30'SY - 15' Interior, 30' CornerRY - 30'SY Buffer - 40'RY Buffer - 50'The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________09/22/2020corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.