HomeMy WebLinkAboutLA184219 19820 Hamburg Ave Permit PackRESIDENTIAL BUILDING
PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
__________________
Permit Number
___________________
Received By
___________________
Date Received
___________________
Fee Total
SITE ADDRESS:
MAILING ADDRESS: CITY: STATE: ZIP:
JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________
LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________
ESTIMATED VALUATION: PROPOSED START DATE: END DATE:
(New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION:
APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL
NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED)
PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License)
RESIDENT OWNER
NAME:_______________________________________________________________________________
HOME PHONE #:_____________________________ CELL PHONE:___________________________
GENERAL CONTRACTOR
Homeowner
Contractor
CONTRACTOR:_______________________________________________________________________
LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE)
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
PLUMBING WORK
Homeowner
Contractor
CONTRACTOR:__________________________________________LICENSE #: PM______________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
MECHANICAL WORK
Homeowner
Contractor
CONTRACTOR:________________________________________ _______________________________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
BOND #:_______________________________________ EXPIRATION DATE____________________
SEWER/WATER CONTRACTOR
New Construction Only
NAME:________________________________________________ ______________________________
HOME PHONE _____________________________ CELL PHONE:______________________________
BOND #:_______________________________________ EXPIRATION DATE____________________
INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE
ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY
APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND
ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND
WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START
WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN.
NAME OF APPLICANT (Please Print)DATE
APPLICANT’S SIGNATURE:
www.lakevillemn.gov
CANNOT HOOK TO CITY SEWER/WATER
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
20195 Holyoke Avenue, Lakeville, MN 55044
952-985-4400 952-985-4499 fax
www.lakevillemn.gov
Sewer & Water Tie Card
Address:________________________________________
Contractor:______________________________________
Permit Number:__________________________________
Final Date:________________
Street Drain-Tile:______
Size of Water Service: 1”
Comments: AIRTEST SANITARY OVER 20’/2 FITTINGS
THIS CARD MUST BE COMPLETED AND ON-SITE AT TIME
OF SEWER & WATER INSPECTION
Secure door closed until deck isconstructed with a separate permit.Concept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode09/22/2020dmathews
UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.
Verify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.CS-PFCS-PFCS-PFCS-PFCS-PF
Verify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.Temper-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).
Stone Cottage
HVAC Load Calculations
for
Stone Cottage
19820 Hamburg Ave
Lakeville,mn
Prepared By:
Brian
Stone Cottage
14787 Energy Way
Apple Vallley, MN 55124
Monday, August 31, 2020
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 2
Project Report
General Project Information
Project Title:Stone Cottage
Project Date:Monday, August 31, 2020
Client Name:Stone Cottage
Client Address:19820 Hamburg Ave
Client City:Lakeville,mn
Company Name:Stone Cottage
Company Representative:Brian
Company Address:14787 Energy Way
Company City:Apple Vallley, MN 55124
Design Data
Reference City:Minneapolis, Minnesota
Building Orientation:Front door faces West
Daily Temperature Range:Medium
Latitude:44 Degrees
Elevation:834 ft.
Altitude Factor:0.970
Elevation Sensible Adj. Factor:1.000
Elevation Total Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29
Check Figures
Total Building Supply CFM:1,373 CFM Per Square ft.:0.387
Square ft. of Room Area:3,552 Square ft. Per Ton:1,078
Volume (ft³) of Cond. Space:31,968
Building Loads
Total Heating Required Including Ventilation Air:55,781 Btuh 55.781 MBH
Total Sensible Gain:29,651 Btuh 83 %
Total Latent Gain:6,270 Btuh 17 %
Total Cooling Required Including Ventilation Air:35,921 Btuh 2.99 Tons (Based On Sensible + Latent)
3.29 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19820 HAMBURG LAKEVILLE 08312020.rhv Monday, August 31, 2020, 9:54 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 3
Load Preview Report
Scope
Has
AED
Net
Ton
ft.²
/Ton Area
Sen
Gain
Lat
Gain
Net
Gain
Sen
Loss
Sys
Htg
CFM
Sys
Clg
CFM
Sys
Act
CFM
Duct
Size
Building 2.99 1,187 3,552 29,651 6,270 35,921 55,781 1,067 1,373 1,373
System 1 Yes 2.99 1,187 3,552 29,651 6,270 35,921 55,781 1,067 1,373 1,373 24x10
Ventilation 340 1,352 1,692 4,550
Zone 1 3,552 29,311 4,918 34,229 51,231 1,067 1,373 1,373 24x10
1-Main Level 1,149 12,045 1,855 13,900 19,548 407 564 564 7--6
2-Upper Level 1,254 12,604 2,444 15,048 19,516 406 590 590 7--6
3-Lower Level 1,149 4,662 619 5,281 12,167 253 218 218 3--6
C:\ ...\19820 HAMBURG LAKEVILLE 08312020.rhv Monday, August 31, 2020, 9:54 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 4
Total Building Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.34, SHGC 0.33
546 16,151 0 16,046 16,046
11N: Door-Metal - Polystyrene Core 42 1,096 0 302 302
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2796 15,811 0 2,417 2,417
15B0-15sf-10: Wall-Basement, , R-15 board insulation to
floor, no interior finish, 10' floor depth
1116 4,077 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1254 2,182 0 1,204 1,204
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1149 2,499 0 0 0
Subtotals for structure:41,816 0 19,969 19,969
People:7 1,400 1,610 3,010
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 101, Summer CFM: 53 9,415 1,018 732 1,750
Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692
Total Building Load Totals:55,781 6,270 29,651 35,921
Check Figures
Total Building Supply CFM:1,373 CFM Per Square ft.:0.387
Square ft. of Room Area:3,552 Square ft. Per Ton:1,078
Volume (ft³) of Cond. Space:31,968
Building Loads
Total Heating Required Including Ventilation Air:55,781 Btuh 55.781 MBH
Total Sensible Gain:29,651 Btuh 83 %
Total Latent Gain:6,270 Btuh 17 %
Total Cooling Required Including Ventilation Air:35,921 Btuh 2.99 Tons (Based On Sensible + Latent)
3.29 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19820 HAMBURG LAKEVILLE 08312020.rhv Monday, August 31, 2020, 9:54 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 5
Building Pie Chart
Building
Loss
55,781
Btuh
Floor 4%Roof 4%
Wall 36%
Glass 29%
Door 2%
Infiltration 17%
Ventilation 8%
Building
Gain
35,921
Btuh
Roof 3%Wall 7%
Glass 45%
Door 1%
People 8%
Equipment 26%
Infiltration 5%Ventilation 5%
C:\ ...\19820 HAMBURG LAKEVILLE 08312020.rhv Monday, August 31, 2020, 9:54 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 6
System 1 Whole House Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.34, SHGC 0.33
546 16,151 0 16,046 16,046
11N: Door-Metal - Polystyrene Core 42 1,096 0 302 302
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2796 15,811 0 2,417 2,417
15B0-15sf-10: Wall-Basement, , R-15 board insulation to
floor, no interior finish, 10' floor depth
1116 4,077 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1254 2,182 0 1,204 1,204
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1149 2,499 0 0 0
Subtotals for structure:41,816 0 19,969 19,969
People:7 1,400 1,610 3,010
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 101, Summer CFM: 53 9,415 1,018 732 1,750
Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692
System 1 Whole House Load Totals:55,781 6,270 29,651 35,921
Check Figures
Supply CFM:1,373 CFM Per Square ft.:0.387
Square ft. of Room Area:3,552 Square ft. Per Ton:1,078
Volume (ft³) of Cond. Space:31,968
System Loads
Total Heating Required Including Ventilation Air:55,781 Btuh 55.781 MBH
Total Sensible Gain:29,651 Btuh 83 %
Total Latent Gain:6,270 Btuh 17 %
Total Cooling Required Including Ventilation Air:35,921 Btuh 2.99 Tons (Based On Sensible + Latent)
3.29 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19820 HAMBURG LAKEVILLE 08312020.rhv Monday, August 31, 2020, 9:54 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 7
Detailed Room Loads - Room 1 - Main Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,149.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,149.0 sq.ft.Supply Air:564 CFM
Ceiling Height:9.0 ft.Supply Air Changes:3.3 AC/hr
Volume:10,341.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:7 Actual Winter Vent.:53 CFM
Runout Air:81 CFM Percent of Supply.:9 %
Runout Duct Size:6 in.Actual Summer Vent.:29 CFM
Runout Air Velocity:411 ft./min.Percent of Supply:5 %
Runout Air Velocity:411 ft./min.Actual Winter Infil.:45 CFM
Actual Loss:0.106 in.wg./100 ft.Actual Summer Infil.:24 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
N -Wall-12F-0sw 40 X 9 330 0.065 5.7 1,866 0.9 0 285
S -Wall-12F-0sw 40 X 9 290 0.065 5.7 1,640 0.9 0 251
E -Wall-12F-0sw 44 X 9 309 0.065 5.7 1,747 0.9 0 267
W -Wall-12F-0sw 44 X 9 293 0.065 5.7 1,657 0.9 0 253
W -Door-11N 3 X 7 21 0.300 26.1 548 7.2 0 151
W -Door-11N 3 X 7 21 0.300 26.1 548 7.2 0 151
N -Gls-4A-1a-o shgc-0.33 100%S 30 0.340 29.6 887 10.7 0 320
S -Gls-4A-1a-o shgc-0.33 0%S 70 0.340 29.6 2,071 19.4 0 1,361
E -Gls-4A-1a-o shgc-0.33 0%S 87 0.340 29.6 2,573 35.3 0 3,068
W -Gls-4A-1a-o shgc-0.33 0%S 61 0.340 29.6 1,804 35.3 0 2,151
Subtotals for Structure:15,341 0 8,258
Infil.: Win.: 45.3, Sum.: 23.6 1,512 2.782 4,207 0.216 455 327
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:1,000 3,000
Room Totals:19,548 1,855 12,045
C:\ ...\19820 HAMBURG LAKEVILLE 08312020.rhv Monday, August 31, 2020, 9:54 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 8
Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,254.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,254.0 sq.ft.Supply Air:590 CFM
Ceiling Height:9.0 ft.Supply Air Changes:3.1 AC/hr
Volume:11,286.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:7 Actual Winter Vent.:53 CFM
Runout Air:84 CFM Percent of Supply.:9 %
Runout Duct Size:6 in.Actual Summer Vent.:30 CFM
Runout Air Velocity:430 ft./min.Percent of Supply:5 %
Runout Air Velocity:430 ft./min.Actual Winter Infil.:44 CFM
Actual Loss:0.116 in.wg./100 ft.Actual Summer Infil.:23 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
N -Wall-12F-0sw 43 X 9 347 0.065 5.7 1,962 0.9 0 300
S -Wall-12F-0sw 43 X 9 363 0.065 5.7 2,053 0.9 0 314
E -Wall-12F-0sw 39 X 9 276 0.065 5.7 1,561 0.9 0 239
W -Wall-12F-0sw 39 X 9 286 0.065 5.7 1,617 0.9 0 247
N -Gls-4A-1a-o shgc-0.33 100%S 40 0.340 29.6 1,183 10.7 0 427
S -Gls-4A-1a-o shgc-0.33 0%S 24 0.340 29.6 710 19.5 0 467
E -Gls-4A-1a-o shgc-0.33 0%S 75 0.340 29.6 2,219 35.3 0 2,645
W -Gls-4A-1a-o shgc-0.33 0%S 65 0.340 29.6 1,923 35.3 0 2,292
UP-Ceil-16B-50 1254 X 1 1254 0.020 1.7 2,182 1.0 0 1,204
Subtotals for Structure:15,410 0 8,135
Infil.: Win.: 44.2, Sum.: 23.0 1,476 2.782 4,106 0.216 444 319
People: 200 lat/per, 230 sen/per:5 1,000 1,150
Equipment:1,000 3,000
Room Totals:19,516 2,444 12,604
C:\ ...\19820 HAMBURG LAKEVILLE 08312020.rhv Monday, August 31, 2020, 9:54 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 9
Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,149.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,149.0 sq.ft.Supply Air:218 CFM
Ceiling Height:9.0 ft.Supply Air Changes:1.3 AC/hr
Volume:10,341.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:3 Actual Winter Vent.:33 CFM
Runout Air:73 CFM Percent of Supply.:15 %
Runout Duct Size:6 in.Actual Summer Vent.:11 CFM
Runout Air Velocity:371 ft./min.Percent of Supply:5 %
Runout Air Velocity:371 ft./min.Actual Winter Infil.:12 CFM
Actual Loss:0.087 in.wg./100 ft.Actual Summer Infil.:6 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
E -Wall-12F-0sw 44 X 9 302 0.065 5.7 1,708 0.9 0 261
W -Wall-15B0-15sf-10 44 X 9 396 0.042 3.7 1,447 0.0 0 0
N -Wall-15B0-15sf-10 40 X 9 360 0.042 3.7 1,315 0.0 0 0
S -Wall-15B0-15sf-10 40 X 9 360 0.042 3.7 1,315 0.0 0 0
E -Gls-4A-1a-o shgc-0.33 0%S 94 0.340 29.6 2,781 35.3 0 3,315
Floor-21A-24 1 X 1149 1149 0.025 2.2 2,499 0.0 0 0
Subtotals for Structure:11,065 0 3,576
Infil.: Win.: 11.9, Sum.: 6.2 396 2.783 1,102 0.217 119 86
Equipment:500 1,000
Room Totals:12,167 619 4,662
C:\ ...\19820 HAMBURG LAKEVILLE 08312020.rhv Monday, August 31, 2020, 9:54 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 10
System 1 Room Load Summary
No
Room
Name
Area
SF
Htg
Sens
Btuh
Min
Htg
CFM
Run
Duct
Size
Run
Duct
Vel
Clg
Sens
Btuh
Clg
Lat
Btuh
Min
Clg
CFM
Act
Sys
CFM
---Zone 1---
1 Main Level 1,149 19,548 407 7-6 411 12,045 1,855 564 564
2 Upper Level 1,254 19,516 406 7-6 430 12,604 2,444 590 590
3 Lower Level 1,149 12,167 253 3-6 371 4,662 619 218 218
Ventilation 4,550 340 1,352
System 1 total 3,552 55,781 1,067 29,651 6,270 1,373 1,373
System 1 Main Trunk Size:24x10 in.
Velocity:824 ft./min
Loss per 100 ft.:0.095 in.wg
Cooling System Summary
Cooling
Tons
Sensible/Latent
Split
Sensible
Btuh
Latent
Btuh
Total
Btuh
Net Required:2.99 83% / 17%29,651 6,270 35,921
Recommended:3.29 75% / 25%29,651 9,884 39,535
Actual:1.00 77% / 23%9,240 2,760 12,000
Equipment Data
Heating System Cooling System
Type:Natural Gas Furnace Standard Air Conditioner
Model:QC-F38-E78-G QC-C12
Indoor Model:S12
Brand:Quikcool FE Series Quikcool AS Series
Description:Hi Efficiency Furnace Standard Efficiency Air Condit
Efficiency:78.3 AFUE 12.4 SEER
Sound:8.1 bels
Capacity:38,000 Btuh 12,000 Btuh
Sensible Capacity:n/a 9,240 Btuh
Latent Capacity:n/a 2,760 Btuh
C:\ ...\19820 HAMBURG LAKEVILLE 08312020.rhv Monday, August 31, 2020, 9:54 AM
Builders Associaton of Minnesota version 101014
Date Certificate Posted
x Passive (No Fan)
Active (With fan and monometer
or other system monitoring
Location (or future location) of Fan:
Other Please Describe Here
x
10/15 x x
x
20 x
20 x
21 x
49 x
x
x
x
x Not applicable, all ducts located in conditioned space
x Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:Input in
BTUS:
70,000 Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
93%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
x Passive
Low: Other, describe:
x Low:
Location of fan(s), describe: Cfm's
4" " round duct OR Flex
" metal duct
City Mailing Address of the Dwelling or Dwelling Unit
Combustion Air Select a Type
Location of duct or system:
35,921
Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.
Place your
logo here
New Construction Energy Code Compliance Certificate
Name of Residential Contractor
Stone Cottage Construction Inc.
MN License Number
Lakeville19820 Hamburg Ave
BC636874
Mech Room
Heat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
55,781
Heating Gain Cooling Load
Attic
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
Rim Joist (2nd Floor+)
0.30
Appliances
THERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Non or Not Applicable Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply
Mineral Fiberboard Insulation Location
Foam, Closed Cell0.22
Describe other insulated areas Fiberglass, BlownFiberglass, Batts Foundation Wall
R-value
Average U-Factor (excludes skylights and one door ) U:
Duct system air tightness: Building envelope air tightness:
Rim Joist (1st Floor)
GPVL-50 13ACXN042-230 Model
Heating System
Natrual Gas
Lennox
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Electric
Make-up Air Select a Type
AO Smith
Domestic Water
Heater
MECHANICAL SYSTEMS
Rating or Size
Efficiency 13 Seer
200CFM
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
29,651Residential Load Calculation
SEER
/EER
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Capacity continuous ventilation rate in cfms:
ML193UH070
Heating Loss
Manufacturer Lennox
Natural Gas
Output in
Tons:
3 Ton50
NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION
This form must be completed and submitted with all new residential permit applications.
New residential building permits WILL NOT be issued without this completed form.
Project Site Address: _____________________________________________________________________
Company Name: _________________________________________________________________________
Primary Contact: _________________________________________________________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Description of Land Disturbing Activity: _____________________________________________________
NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___
If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an
erosion and sediment control plan MUST be submitted with the residential building permit application.
“The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities
in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater
Permit.” (NPDES Construction Stormwater Permit, MPCA)
“The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least
once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.”
(NPDES Construction Stormwater Permit, MPCA)
Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control
inspections and corrective actions:
Name of Person: ________________________________Company: _______________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Entity that Provided Training: ________________________ Certification Expiration Date: ____________
NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots.
No land disturbing activity may begin until a residential building permit has been issued.
I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National
Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER;
withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater
Permit (MN R 100001) or erosion and sediment control plan.
Signature: ________________________________________________ Date:_________________________
Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500
DJM
X9/9/2020