HomeMy WebLinkAbout19820 Hamburg Ave Survey*Draintile connection required.ENGINEERING REVIEWEDDate:__________________09/22/2020lvlasatyEROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATIONThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.