Loading...
HomeMy WebLinkAbout17960 Gresford Lane Survey(1002.7 ) E .O . F .X (9 9 9 . 7 )999.9(1001.0)OS 5 .00HUB=999.97OS 24.00HUB=1000.22OS 31 .50HUB=1000.27OS 5 .00HUB=1000.16FD IP FD IPR:996.55C.O.C.O .FD IPFD IPR:999.08SERV999.5999.8999.8999.7999.4999.61000.0999.9999.61000.01000.0999.9999.8997.4998.6997.6DECK7.5%GARAGEPROPOSEDHOUSEV A C A N T L O T VACANT LOTGRESFORD LANE(1001.4 )(1001.3) (1001 .7 )(1001.7) (998 .0 )(1001.7 )(1002.77)N69°19'02 "E90.00S20°40'58"E50.0090.00N69°19'02"E50.00S20°40'58"E 33 .00 29 .00 13.50 10 .00 26.50 50 .00 19.00 2 .00 21.00999.9(1001.0)(1001 .9 )POR.S.W.25.3322.185.005.0017.54(1002.4 )W.W.999.9DROP-1CDENOTES EXISTING CATCH BASINDENOTES EXISTING HYDRANTDENOTES EXISTING SANITARY MANHOLEDENOTES EXISTING STORM MANHOLEDENOTES EXISTING UTILITY BOXDENOTES EXISTING SERVICE OR CLEANOUTDENOTES IRON MONUMENT FOUNDDENOTES IRON MONUMENT SETDENOTES EXISTING POWER POLEDENOTES EXISTING LIGHT POLEDENOTES EXISTING CONSERVATION POSTOR WET LAND BUFFER POSTDENOTES EXISTING TREE8" TREE000.0DENOTES WOOD HUBDENOTES NAILDENOTES EXISTING RETAINING WALLDENOTES PROPOSED RETAINING WALLDENOTES EXISTING ELEVATIONDENOTES PROPOSED ELEVATIONDENOTES AS BUILT ELEVATION(000.0)000.0DENOTES EXISTING TREELINEDENOTES DIRECTION OF SURFACE DRAINAGEDENOTES EXISTING FENCELEGENDDENOTES EXISTING F.E.S.LOT AREA : 4,500 SQ. FT.HOUSE AREA : 2,177 SQ. FT.DECK AREA : 265 SQ. FT.PORCH AREA : 46 SQ. FT.DRIVEWAY AREA : 216 SQ. FT.SIDEWALK AREA : 24 SQ. FT.COVERAGE AREA : 2,728 SQ. FT. (60.6%)Legal Description:= FINISHED GARAGE FLOOR ELEVATION= BASEMENT FLOOR ELEVATION= TOP OF FOUNDATION ELEVATION(1002.77)(1003.44)(994.40)1. No specific soils investigation has been performed on this lotby the surveyor. The suitability of the soils to support thespecific house is not the responsibility of the surveyor.2.No title information was provided for this survey. This surveydoes not purport to show all easements of record.3. See architectural plans for final building dimensions.CERTIFICATE OF SURVEYAREAS:NOTE: MINIMUM ALLOWED LOW FLOOR ELEVATION = 994.40REVISED 08-31-2020: CHANGE FOUNDATION TO 9'-4" FRONT WALL WITH 1-COURSE DROPPED GARAGE.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.ENGINEERING REVIEWEDDate:__________________09/24/2020corlowsky