HomeMy WebLinkAbout17381 Eastwood Ave SurveyZoning = RM-1The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________09/04/2020lvlasatyEROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.