HomeMy WebLinkAbout19757 Henley Lane SurveyZoning = RS-3
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________09/04/2020 lvlasaty
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.