HomeMy WebLinkAbout16289 Durango Tr Survey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 7/28/17.7.Plan No. SBF18.20.04-THE HAMILTON-ELEVATION ANOTESProposedGarage Floor @ Front= 932.2Garage Top of Block= 932.9House Top of Block= 932.9Lowest Floor= 924.9Top of Block at Egress Window= 928.1PROPERTY DESCRIPTION16289 Durango Trail, Lakeville, MinnesotaPROPERTY ADDRESSSURVEYOR'S CERTIFICATEFLOOR ELEVATIONSTop nut of hydrant located at Lots 3 and 4, Block 6 = 933.03BENCHMARKDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationJames R. Hill, Inc.
PHONE: 952.890.6044 www.jrhinc.com
PLANNERS / ENGINEERS / SURVEYORS
CERTIFICATE OF SURVEY
FORDRAWN BYDATEREVISIONSCAD FILEPROJECT NO.SHEET 1 OF 1Lot= 5,000 sq. ft.House/Garage= 2,364 sq. ft.Porch= 162 sq. ft.Driveway= 234 sq. ft.Patio= 144 sq. ft.Total Impervious= 2,904 sq. ft. or58.1 % of lotHARD COVER CALCULATIONSFront(Garage)= 25'(House)= 20'Side(House)= 7'(Garage)= 7'(Street)= 15'Rear= 20'SETBACKSI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 14th day of September, 2020Marcus F. Hampton, MN L.S. No. 474819/14/2020A. 9/22/20: Move house2999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306Lot 20, Block 4, SPIRIT OF BRANDTJEN FARM 18TH ADDITON, Dakota County,MinnesotaROBERT THOMAS HOMESJCB
Lot 20, Block 4, SPIRIT OF BRANDTJEN FARM
18TH ADDITON, Dakota County, Minnesota401062.dwg401062Planning DepartmentApprovedDate:__________________09/22/2020dmoreyENGINEERING REVIEWEDDate:__________________09/29/2020corlowskyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.