HomeMy WebLinkAbout18080 Hartlin Ave Surveyf:\jobs\7761 - 7780\7769 - avonlea 4th addition\cad c3d\survey\7769.089.dwgSave Date:08/10/20
House Address:Certificate of Survey for: M/I HOMES OF MINNEAPOLIS, LLC 18080 Hartlin Avenue, Lakeville, MN House Model: Dearborn (B) Revisions:EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONENGINEERING REVIEWEDDate:__________________09/25/2020corlowsky*Maintain 6" between bottom of siding and sod.*No structures in easements.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.Planning DepartmentApprovedDate:__________________09/25/2020mcroatt