Loading...
HomeMy WebLinkAboutItem 06.j Date: Item No. KNOB HILL OF LAKEVILLE SECOND ADDITION FINAL PLAT Proposed Action Staff recommends adoption of the following motion: Move to approve a resolution approving the Knob Hill of Lakeville Second Addition final plat. Overview KJ Walk, Inc. has submitted a final plat application for 36 single family lots and 42 detached townhome lots to be known as Knob Hill of Lakeville Second Addition, located west of Pilot Knob Road (CSAH 31) and north of 179th Street (future CSAH 9). The Knob Hill of Lakeville Second Addition final plat is consistent with the Knob Hill North preliminary plat approved by the City Council on May 18, 2020. This will be the only phase of the Knob Hill North preliminary plat. Primary Issue to Consider • Will 179th Street be completed this year? The Developer has provided the City with a schedule that indicates that they intend to complete construction of 179th Street from Eventide Way to the current terminus in Autumn Meadows Fourth Addition by November 30, 2020. Completion of this segment of the street opens the connection from Pilot Knob Road to Cedar Avenue. Supporting Information • Resolution • Signed development contract • Signed stormwater maintenance agreement • September 18, 2020 Planning and Engineering reports Financial Impact: $ Budgeted: Y☐ N☐ Source: Related Documents: (CIP, ERP, etc.): Envision Lakeville Community Values: A Home for All Ages and Stages of Life Report Completed by: Kris Jenson, Associate Planner October 5, 2020 None Zoning Ordinance (Reserved for Dakota County Recording Information) CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. ______ RESOLUTION APPROVING THE FINAL PLAT OF KNOB HILL OF LAKEVILLE SECOND ADDITION WHEREAS, the owner of the property described as KNOB HILL OF LAKEVILLE SECOND ADDITION has requested final plat approval; and WHEREAS, the preliminary plat was reviewed by the Planning Commission and the Parks, Recreation and Natural Resources Committee and approved by the City Council; and WHEREAS, the final plat is consistent with the preliminary plat; and WHEREAS, the final plat is acceptable to the City; NOW THEREFORE BE IT RESOLVED by the Lakeville City Council: 1. KNOB HILL OF LAKEVILLE SECOND ADDITION final plat is approved subject to the development contract and security requirements. 2. The Mayor and City Clerk are hereby authorized to sign the development contract, the final plat mylars, and the stormwater maintenance agreement. 3. The City Clerk is directed to file a certified copy of this resolution with the Dakota County Recorder. ADOPTED by the Lakeville City Council this 5th day of October 2020. 2 CITY OF LAKEVILLE Douglas P. Anderson, Mayor ATTEST: _______________________ Charlene Friedges, City Clerk STATE OF MINNESOTA ) CITY OF LAKEVILLE ) I hereby certify that the foregoing Resolution No. _________is a true and correct copy of the resolution presented to and adopted by the City Council of the City of Lakeville at a duly authorized meeting thereof held on the 5th day of October 2020 as shown by the minutes of said meeting in my possession. __________________________ Charlene Friedges City Clerk (SEAL) Drafted By: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 1 City of Lakeville Planning Department Memorandum To: Daryl Morey, Planning Director From: Kris Jenson, Associate Planner Date: September 18, 2020 Subject: Knob Hill of Lakeville Second Addition Final Plat Application Action Deadline: October 16, 2020 INTRODUCTION KJ Walk, Inc. has submitted an application and plans for the final plat of Knob Hill of Lakeville Second Addition, which includes 36 single family lots and 42 detached townhome lots located west of Pilot Knob Road (CSAH 31) and north of 179th Street (future CSAH 9). This plat was preliminary platted as Knob Hill North, which was approved by the City Council on May 18, 2020. The lot, block and street design of the Knob Hill of Lakeville Second Addition of Lakeville final plat is consistent with the approved Knob Hill North preliminary plat. The final plat plans have been reviewed by Engineering and Parks and Recreation staff. EXHIBITS A. Aerial Location Map B. Approved Preliminary Plat (2 pages) C. Final Plat (3 Pages) D. Grading Plan E. Dakota County Plat Commission Letter dated February 6, 2019 PLANNING ANALYSIS Zoning. The property is zoned RST-2, Single and Two-Family Residential District. Single family homes and detached townhomes are a permitted use within the RST-2 District. Existing Conditions. The Knob Hill of Lakeville Second Addition final plat area consists of one parcel that was previously platted as Outlot E, Knob Hill of Lakeville. Grading of the site began this summer and additional grading has been done as a part of the 179th Street construction. According to a certificate of survey, there are encroachments such as sheds, garden beds, fire pits, etc. from the adjacent Country View manufactured home park to the north. These 2 encroachments into the plat shall be removed with the development and the developer must post a security with the final plat to ensure their removal. SINGLE FAMILY LOT REQUIREMENTS Lots/Blocks. The following minimum single-family lot size requirements of the RST-2, Single and Two-Family Residential District pertain to the Knob Hill of Lakeville Second Addition final plat: Lot Area (Interior) Lot Area (Corner) Lot Width (Interior) Lot Width (Corner) Lot Width (Abutting 179th St) RST-2 8,400 s.f. 10,200 s.f. 70 feet 85 feet 95 feet Single family lot sizes within the Knob Hill of Lakeville Second Addition final plat range from 8,400 square feet to 15,953 square feet in area. All of the single family lots meet the lot area and width requirements of the RST-2 District. Setbacks. The following minimum requirements for single family building setbacks in the RST-2 District pertain to the Knob Hill of Lakeville Second A ddition final plat: Front Yard Side Yard (Interior) Side Yard (Corner) Side Yard (buffer) Rear Yard RST-2 20 feet (house) 25 feet (garage) 7 feet 20 feet 30 feet 30 feet The proposed house pads shown on the Knob Hill of Lakeville Second Addition grading, drainage and erosion control plan indicate that all 36 single-family lots have adequate building pad areas that meet setback requirements for principal structures. DETACHED TOWNHOME DEVELOPMENT STANDARDS Lot Requirements. The proposed unit lots shown on the Knob Hill of Lakeville Second Addition final plat have sufficient area to accommodate detached units. A homeowner’s association will be required to be established for ownership and maintenance of Lot 49, Block 1 and Lot 12, Block 4. The RST-2 District requires at least 7,500 square feet per unit. The Knob Hill of Lakeville Second Addition final plat has an average of 10,494 square feet per unit for the detached townhomes area, which exceeds the minimum lot area per unit requirements of the RST-2 District. Setbacks. The f ollowing minimum requirements for detach ed townhome building setbacks in the RST-2 District pertain to the Knob Hill of Lakeville Second Addition final plat: 3 Base Lot Between Buildings (Detached Units) Front Yard (to ROW) RST-2 30 feet 14 feet 20 feet (front), 25 feet (garage) The proposed building pads shown on the Knob Hill of Lakeville Second Addition grading, drainage and erosion control plan indicate that all 42 detached townhomes have adequate building pad areas that meet setback requirements. Development Density. The Knob Hill of Lakeville Second Addition final plat consists of 78 single family lots and detached townhome units on 29.81 acres. This results in a gross density of 2.62 units per acre. The net density, excluding the public stormwater ponds and future park area, is 3.4 units per acre. Phasing. Knob Hill of Lakeville Second Addition is the only phase of the Knob Hill North preliminary plat. Outlots. There are two outlots proposed with the Knob Hill of Lakeville Second Addition final plat. • Outlot A is 4.52 acres in area and will be deeded to the City for park purposes. • Outlot B is 2.32 acres in area and will be deeded to the City for stormwater management purposes. Access. Knob Hill of Lakeville Second Addition will have three access points from 179th Street as well as connect with 178th Street in Autumn Meadows Third Addition. Plat Commission. The Dakota County Plat Commission reviewed and approved the final plat at their February 4, 2019 meeting. The Plat Commission letter is included as Exhibit E. Streets & Right-of-Way. Knob Hill of Lakeville Second Addition will include the construction of local residential streets. Pilot Knob Road (CSAH 31) is an arterial road in the City’s Transportation Plan. Right of way was previously platted with the Knob Hill of Lakeville final plat. 179th Street (Future CSAH 9) is an arterial road in the City’s Transportation Plan. The full right of way was dedicated with the Knob Hill of Lakeville final plat. 179th Street is currently constructed between Pilot Knob Road and Eventide Way. 179th Street is currently being constructed from Eventide Way to its current terminus at Fieldcrest Avenue in Autumn Meadows Second Addition. 178th Street is a 32-foot-wide street within a 60 foot right-of-way with a five (5) foot wide sidewalk on the south side of the street that will be extended from its current terminus in the Autumn Meadows Third Addition and will provide a full connection to 179th Street. Lot 13, Block 3 is not permitted to have driveway access to 179th Street. Euclid Avenue will be a 32-foot-wide street within 60 feet of right-of-way with a five (5) foot wide sidewalk along the west side of the street and will provide a right-in/right-out access to 179th Street. 4 Everest Avenue will be a 32 foot wide street within 60 feet of right-of-way that will extend from 178th Street and end in a permanent cul de sac. A five (5) foot wide concrete sidewalk will be constructed along the south side of Everest Avenue between 178th Street and Euclid Avenue. Evershed Way will be a 32 foot wide street within a 60 foot right of way that will provide a right-in/right-out connection to 179th Street. A five (5) foot wide concrete sidewalk will be constructed along the east side of the street. Lot 6, Block 2 is not permitted to have driveway access to 179th Street. Trails. Trails along 179th Street were approved with the Knob Hill of Lakeville final plat. There are no trails proposed to be constructed as part of the Knob Hill of Lakeville Second Addition final plat. Buffer Yard/Landscaping. Knob Hill of Lakeville Second Addition is adjacent to Pilot Knob Road and 179th Street, both arterial roadways. Two single family lots have a side yard adjacent to 179th Street as does the townhome common areas (Lot 12, Block 4 and Lot 49, Block 1). The landscape plan for the buffer yard was approved with the Knob Hill North preliminary plat and includes staggered rows of evergreen trees to meet the buffer yard landscaping requirements. A security for $84,000 is required to guarantee installation of the landscaping. In addition, a $1,000 per lot escrow is required with the building permits for Lot 6, Block 2 and Lot 13, Block 3 for the installation of sod in the side yards to the edge of the trail. Park Dedication. Park dedication for Knob Hill of Lakeville Second Addition will be satisfied through land dedication. The amount of land being dedicated for park purposes with Outlot A exceeds the park dedication requirement established by the Subdivision Ordinance so the Developer will receive a credit to the final plat cash fees. See the September 18, 2020 Engineering report for more information. Tree Preservation. A tree preservation plan was submitted with the Knob Hill of Lakeville preliminary plat. Fifteen trees were proposed to be saved but none of those trees were within the Knob Hill of Lakeville Second Addition plat boundary. Wetlands. A site investigation was conducted in April 2017. No wetlands were identified within the project boundaries. Grading, Drainage and Erosion Control. The final plat includes grading, drainage and erosion control plans. Grading, drainage and erosion control is discussed in more detail in the September 18, 2020 engineering report. Subdivision Identification Sign. The developer is not proposing a subdivision identification sign within this phase of the final plat. RECOMMENDATION The Knob Hill of Lakeville Second Addition final plat is consistent with the approved preliminary plat and complies with the requirements of the Zoning and Subdivision Ordinances. Planning Department staff recommends approval of the Knob Hill of Lakeville Second Addition final plat subject to the following conditions: 5 1. The recommendations listed in the September 18, 2020 engineering report. 2. Outlots A and B shall be deeded to the City with the Knob Hill of Lakeville Second Addition final plat. 3. A homeowner’s association must be created for the ownership and maintenance of the Lots 1-49, Block 1 and Lots 1-12, Block 4 prior to issuance of building permits for the townhome units. 4. Five-foot-wide concrete sidewalks shall be constructed at the developer’s expense as shown on the approved final plat plans. 5. Landscaping shall be installed consistent with the approved landscape plan. An $82,000 security shall be submitted to guarantee installation of the approved landscaping. 6. A $1,000 cash escrow must be submitted with the building permit applications for Lot 6, Block 2, and Lot 13, Block 3 to guarantee installation of the buffer rear yard sod to the edge of the trail. This escrow will be in addition to the two trees/lot and front yard sod escrow required at the time of building permit. 7. The following lots are not permitted to have driveway access to 179th Street: • Lot 6, Block 2 • Lot 13, Block 3 EVENTIDEWAY± Knob Hill of Lakeville Second Addition final plat area PILOTKNOBRD(CSAH31)City of LakevilleLocation MapKnob Hill of LakevilleSecond AdditionFinal PlatEXHIBIT A 1 7 9 T H S T (F U T U R E C S A H 9 ) CITY OF FARMINGTON E V E N I N G LN 177TH ST I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 2 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwg060120 180Preliminary Plat SetPreliminary Plat (West)5'7'10'30'25'10'ROWTYPICAL LOTSETBACKS AND EASEMENTSROW20'HOUSE SETBACK GARAGE SETBACK20'10'10'30'25'10'20'HOUSE SETBACK GARAGE SETBACK ROWSITE DATATOTAL SITE AREA29.807 AC.NUMBER OF SINGLE FAMILY LOTS36 LOTSNUMBER OF DETACHED TOWNHOME LOTS 42 LOTSLOT AREA18.065 AC.RIGHT OF WAY AREA (LOCAL STREET)4.900 AC.OUTLOT AREA (OUTLOT A-B)6.842 AC.UNIT DENSITYGROSS2.62 UNITS PER AC.NET4.32 UNITS PER AC.SINGLE FAMILY LOT REQUIREMENTS (RS-4)MIN. LOT AREA - INTERIOR LOTS8,400 S.F.MIN. LOT WIDTH AT SETBACK - INTERIOR LOTS 70 FEETMIN. LOT AREA - CORNER LOTS10,200 S.F.MIN. LOT WIDTH AT SETBACK - CORNER LOTS 85 FEETMIN. LOT WIDTH AT SETBACK - CORNERLOTS ABUTTING 179TH ST W. 110 FEETMIN. LOT DEPTH - LOTSABUTTING 179TH ST W. 150 FEETDETACHED TOWNHOME MINIMUM SETBACKS (RM-1)ROW SETBACKS20' HOUSE25' GARAGEBASE LOT SETBACKS30' HOUSE20' PATIO/DECK179TH AND PILOT KNOB SETBACKS50' HOUSE30' PATIO/DECK LAST SAVED: April 22, 2020Lakeville, MNROWTYPICAL DETACHED TOWNHOME LOTSETBACKS AND EASEMENTSROW20'10'10'30'25'10'ROW14'20'DECK/PATIOSETBACKD&U EASEMENTBUILDING SETBACK5'7'01/07/19 OriginalRevised02/11/1950'70'40'70'01/28/20 Revised04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street NamesEXHIBIT B I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 3 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwg060120 180Preliminary Plat SetPreliminary Plat (East) LAST SAVED: April 22, 2020Lakeville, MN01/07/19 OriginalRevised02/11/1901/28/20 RevisedLegendOpen Space04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street Names EXHIBIT C I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comRegistration #: 51362SHEET 2 of 21Date: 7/31/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KH2.dwgGrading LAST SAVED: July 31, 20200100 200 300For ReviewJuly 22, 2020Date:07/22/2020Revision:OriginalOF LAKEVILLELAKEVILLE, MNSECOND ADDITIONEXHIBIT D Dakota County Surveyor’s Office Western Service Center  14955 Galaxie Avenue  Apple Valley, MN 55124 952.891-7087  Fax 952.891-7127  www.co.dakota.mn.us February 6, 2019 City of Lakeville 20195 Holyoke Ave. Lakeville, MN 55044 Re: KNOB HILL NORTH The Dakota County Plat Commission met on February 4, 2019, to consider the preliminary plat of the above referenced plat. The plat is adjacent to County State Aid Highway 31 (Pilot Knob Rd.) and future County Road 179th St. W., and is therefore subject to the Dakota County Contiguous Plat Ordinance. This is a replat of OUTLOT E, KNOB HILL OF LAKEVILLE. Restricted access symbols should be shown along all of CSAH 31 (shown as Lot 54 on the proposed plat). Restricted access should be shown along all of 179th Street (future County Road) except for the three access openings as shown on the proposed plat. A quit claim deed to Dakota County for restricted is required to be recorded with the plat mylars. The Plat Commission has approved the preliminary plat provided that the described conditions are met, and reviewed the final plat and recommends approval to the County Board of Commissioners provided that the described conditions are met. Traffic volumes on CASH 31 are 28,000 ADT and are anticipated to be 39,000 ADT by the year 2030. These traffic volumes indicate that current Minnesota noise standards for residential units could be exceeded for the proposed plat. Residential developments along County highways commonly result in noise complaints. In order for noise levels from the highway to meet acceptable levels for adjacent residential units, substantial building setbacks, buffer areas, and other noise mitigation elements should be incorporated into this development. No work shall commence in the County right of way until a permit is obtained from the County Transportation Department and no permit will be issued until the plat has been filed with the County Recorder’s Office. The Plat Commission does not review or approve the actual engineering design of proposed accesses or other improvements to be made in the right of way. Nothing herein is intended to restrict or limit Dakota County’s rights with regards to Dakota County rights of way or property. The Plat Commission highly recommends early contact with the Transportation Department to discuss the permitting process which reviews the design and may require construction of highway improvements, including, but not limited to, turn lanes, drainage features, limitations on intersecting street widths, medians, etc. Please contact Butch McConnell regarding permitting questions at (952) 891-7115 or Todd Tollefson regarding Plat Commission or Plat Ordinance questions at (952) 891-7070. Sincerely, Todd B. Tollefson EXHIBIT E Secretary, Plat Commission c: City of Lakeville Public Works – Engineering Division Memorandum To: Kris Jenson, Associate Planner From: Logan Vlasaty, Civil Engineer McKenzie L. Cafferty, Environmental Resources Manager John Hennen, Parks and Recreation Director Copy: Zach Johnson, City Engineer Jerilyn Erickson, Finance Director Gene Abbott, Building Official Daryl Morey, Planning Director Date: September 18, 2020 Subject: Knob Hill of Lakeville Second Addition • Final Plat Review • Final Grading and Drainage Plan Review • Final Erosion Control Plan Review • Final Utility Plan Review BBAACCKKGGRROOUUNNDD KJ Walk, Inc. has submitted a final plat named Knob Hill of Lakeville Second Addition. This is the first and only phase of the Knob Hill North preliminary plat approved by the City Council on May 18, 2020. The proposed subdivision is located west of and adjacent to Pilot Knob Road (CSAH 31), north of and adjacent to 179th Street (future CSAH 9). The parent parcel consists of Outlot E, Knob Hill of Lakeville and is zoned RST-2, Single and Two-Family Residential District. The final plat consists of thirty-six (36) single family lots and forty-two (42) detached town home lots and two (2) common HOA lots wit hin four (4) blocks, and two (2) outlots on 29.8 acres. The outlots created with the final plat shall have the following use: Outlot A: Park area; to be deeded to the City (4.52 acres) Outlot B: Stormwater management basin; to be deeded to the City (2.32 acres) The proposed development will be completed by: Developer: KJ Walk, Inc. KKNNOOBB HHIILLLL OOFF LLAAKKEEVVIILLLLEE SSEECCOONNDD AADDDDIITTII OONN –– FFIINNAALL PPLLAATT SSEEPPTTEEMMBBEERR 1188,, 22002200 PPAAGGEE 22 OOFF 1100 Engineer/Surveyor: KJ Walk, Inc. SSIITTEE CCOONNDDIITTIIOONNSS The Knob Hill of Lakeville Second Addition site consists of undeveloped agricultural land with some encroachments along the northern property line. The land generally slopes west to east and drains into the North Creek branch of the Vermillion River Watershed. The Developer began grading the site in July with a grading permit following City Council approval of the preliminary plat, additional grading was performed as part of the construction of 179th Street. Fencing, sheds and any encroachments on the existing parcel shall be removed with the Knob Hill of Lakeville Second Addition development. The Developer must post a $20,000 security with the final plat for the removal of the encroachments. SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT Pilot Knob Road (CSAH 31) Knob Hill of Lakeville Second Addition is located west of and adjacent to Pilot Knob Road, a minor arterial County highway, as identified in the City’s Transportation Plan. Pilot Knob Road adjacent to the site is a four-lane divided urban roadway. The current Dakota County Plat Review Needs Map indicates a half right-of-way requirement of 100-feet and designates it as a future six-lane divided urban roadway over its entire length adjacent to the plat. The expansion of Pilot Knob Road to a six-lane roadway is not identified in the City’s or County’s current Capital Improvement Plans. The Developer dedicated 100-feet of west half right-of- way for Pilot Knob Road adjacent to the parent parcel with the Knob Hill of Lakeville final plat. The Developer is responsible for any improvements to Pilot Knob Road, as required by Dakota County. 179th Street (Future CSAH 9) Knob Hill of Lakeville Second Addition is located north of and adjacent to 179th Street (future CSAH 9), a minor arterial highway, as identified in the City’s Transportation Plan. 179th Street is designated as a future County Road, as identified by the Dakota County East-West Corridor Preservation Study completed in 2006. The current Dakota County Plat Review Needs Map indicates a 120-foot wide right-of-way requirement and designates this roadway as a two- lane divided roadway over its entire length adjacent to the plat. The Developer dedicated the necessary right-of-way with the Knob Hill of Lakeville final plat. 179th Street is designed as a two-lane divided urban roadway with 10-foot wide bituminous trails along both sides of the road, and is consistent with Dakota County’s standards, access locations, and spacing requirements. 179th Street will provide a full access for the development at Pilot Knob Road. Right and left turn lanes will be provided at the roadway connections within the plat, as required by Dakota County. The alignment and design for 179th Street was reviewed and approved by the Dakota County Transportation Department. The City will maintain 179th Street until jurisdiction is transferred to Dakota County. KKNNOOBB HHIILLLL OOFF LLAAKKEEVVIILLLLEE SSEECCOONNDD AADDDDIITTII OONN –– FFIINNAALL PPLLAATT SSEEPPTTEEMMBBEERR 1188,, 22002200 PPAAGGEE 33 OOFF 1100 The Knob Hill of Lakeville Development Contract requires the construction and extension of 179th Street from Fieldcrest Avenue to Pilot Knob Road by November 30, 2020. 179th St is being constructed from Pilot Knob Road to Eventide Way with the development of the Knob Hill of Lakeville plat. 178th Street Development of Knob Hill of Lakeville Second Addition includes the extension of 178th Street, a local roadway. 178th Street is designed as a 32-foot wide, two-lane urban roadway with a 5- foot wide concrete sidewalk along the south side of the street. 178th Street will provide a full access to 179th Street. The Developer is dedicating 60-feet of right-of-way along the entire length of 178th Street. The Developer shall remove the temporary cul-de-sac and restore the easement area with the extension of 178th Street, including sodding any disturbed areas and replacing any irrigation/encroachments. The City will reimburse the Developer $2,634.52 (Escrow No. 8357) for the removal of the 178th Street Temporary Cul-de-sac. Evershed Way Development of Knob Hill of Lakeville Second Addition includes the construction of Evershed Way, a local roadway. Evershed Way is designed as a 32-foot wide, two-lane urban roadway with a 5-foot wide concrete sidewalk along the east side of the street. Evershed Way will provide a right-in-right out access to 179th Street and terminate with a T intersection at 178th Street. The Developer is dedicating 60-feet of right-of-way along the entire length of Evershed Way. Everest Avenue Development of Knob Hill of Lakeville Second Addition includes the construction of Everest Avenue, a local roadway. Everest Avenue is designed as a 32 -foot wide, two-lane urban roadway with a 5-foot wide concrete sidewalk along the south side of the street from 178th Street to Euclid Avenue. Everest Avenue will terminate to the west with a T intersection at 178th Street and to the east with a permanent cul-de-sac. The Developer is dedicating 60-feet of right-of-way along the entire length of Everest Avenue. Euclid Avenue Development of Knob Hill of Lakeville Second Addition includes the construction of Euclid Avenue, a local roadway. Euclid Avenue is designed as a 32-foot wide, two-lane urban roadway with a 5-foot wide concrete sidewalk along the west side of the street. Euclid Avenue will provide a right-in-right out access to 179th Street and terminate with a T intersection at Everest Avenue. The Developer is dedicating 60-feet of right-of-way along the entire length of Euclid Avenue. CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS Construction traffic access and egress for grading, utility and street construction shall be from a single rock construction entrance at 178th Street from 179th Street, west of Pilot Knob Road. No construction access shall be allowed from the existing streets to the south within the City of Farmington or from the existing streets to the west within Autumn Meadows. KKNNOOBB HHIILLLL OOFF LLAAKKEEVVIILLLLEE SSEECCOONNDD AADDDDIITTII OONN –– FFIINNAALL PPLLAATT SSEEPPTTEEMMBBEERR 1188,, 22002200 PPAAGGEE 44 OOFF 1100 PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS Development of Knob Hill of Lakeville Second Addition includes the construction of public trails and sidewalks. Five-foot wide concrete sidewalks, with pedestrian curb ramps will be installed along one side of all local streets, except for the cul-de-sac portion of Everest Avenue. A bituminous trail will be constructed along both sides of 179th Street with the Knob Hill of Lakeville development. The Park Dedication requirement has not been collected on the parent parcel and will be satisfied through land dedication that shall be dedicated with the final plat. The density of Knob Hill of Lakeville Second Addition final plat is 2.6 units/acre (78 proposed lots/29.8 acres). The land dedication requirement for subdivisions with a density less than 3.0 lots/acre is 12%. The land dedication and cash contribution requirements are estimated as follows: Gross Area of Knob Hill of Lakeville Second Addition 29.8 Acres Total Buildable Area 29.8 Acres Land Dedication Requirement (12%) 3.6 Acres The Developer will dedicate 4.52 acres in Outlot A to the City for park land. This exceeds the 3.6 acres park dedication requirement by 0.92 acres. The Developer shall receive a credit to its final plat cash fees for the park dedication that exceeds to land dedication requirements, calculated as follows: 0.92 acres x $50,000 = $46,000.00 Excess Park Dedication Credit per Acre Credit to Cash Fees The Developer shall mass grade the area of the future park, including Oulot X, Autumn Meadows Third Addition (existing City property west of the plat boundary) as shown on the Grading Plan. The restoration specifications for the park area will be determined with the final construction plans. UUTTIILLIITTIIEESS SSAANNIITTAARRYY SSEEWWEERR Knob Hill of Lakeville Second Addition is located within subdistrict NC-20030 of the North Creek sanitary sewer district, as identified in the City’s Comprehensive Sewer Plan. Wastewater will be conveyed to the MCES Elko/New Market Interceptor and continue to the Empire Wastewater Treatment Facility. Development of Knob Hill of Lakeville Second Addition includes the extension of public sanitary sewer. 8-inch sanitary sewer will be constructed within the subdivision and connect to an existing sewer stub to the north of 179th Street to provide sanitary sewer service to the development. KKNNOOBB HHIILLLL OOFF LLAAKKEEVVIILLLLEE SSEECCOONNDD AADDDDIITTII OONN –– FFIINNAALL PPLLAATT SSEEPPTTEEMMBBEERR 1188,, 22002200 PPAAGGEE 55 OOFF 1100 The Sanitary Sewer Availability Charge has not been collected on the parent parcel and will be required with the final plat. The fee will be based on the rate in effect at the time of final plat approval, calculated as follows: 78 units x $327.00 = $25,506.00 Total Units in Knob Hill of Lakeville Second Addition Sanitary Sewer Availability Charge Per Unit Sanitary Sewer Availability Charge required WWAATTEERRMMAAIINN Development of Knob Hill of Lakeville Second Addition includes the extension of public watermain. 8-inch watermain will be extended within the development to provide water service to the subdivision. Existing watermain stubs are present at the west, south, and east borders of the plat. The Lateral Watermain Access Charge is due for the portion of 12-inch watermain within Pilot Knob Road right-of-way and shall be paid with the final plat. The Lateral Watermain Access Charge will be based on the rate in effect at the time of final plat approval, calculated as follows: 388.49 x $41.50/Front Foot = $16,122.34 Front Footage along Pilot Knob Road Lateral Watermain Access Charge Total OOVVEERRHHEEAADD LLIINNEESS There are no overhead utility lines located on the existing parcel. DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG Knob Hill of Lakeville Second Addition is primarily located within subdistrict NCL-70 of the North Creek stormwater district as identified in the City’s Water Resources Management Plan. Development of Knob Hill of Lakeville Second Addition includes the construction of one City owned and maintained stormwater management basins to collect and treat the stormwater runoff generated from the site. The basin will be located within Outlot B and will provide water quality treatment and rate control of the stormwater runoff generated from the subdivision. The s tormwater management basin design is consistent with City requirements. Development of Knob Hill of Lakeville Second Addition includes the construction of one privately owned landscaped drainage swale. The Developer shall enter into a stormwater maintenance agreement with the final plat. The final grading plan shall identify all fill lots in which the building footings will be placed on fill material. The grading specifications shall also indicate that all embankments meet FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings placed on fill material are appropriately constructed. Building permits will not be issued until KKNNOOBB HHIILLLL OOFF LLAAKKEEVVIILLLLEE SSEECCOONNDD AADDDDIITTII OONN –– FFIINNAALL PPLLAATT SSEEPPTTEEMMBBEERR 1188,, 22002200 PPAAGGEE 66 OOFF 1100 a soils report and an as-built certified grading plan have been submitted and approved by City staff. Knob Hill of Lakeville Second Addition contains more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. SSTTOORRMM SSEEWWEERR Development of Knob Hill of Lakeville Second Addition includes the construction of public storm sewer systems. Storm sewer will be installed within the subdivision to collect and convey stormwater runoff generated from within the public right-of-way and lots to the public stormwater management basin located within Ou tlot B. The Trunk Storm Sewer Area Charge h as not been collected on the parent parcel and must be collected with the Knob Hill of Lakeville Second Addition final plat. The Trunk Storm Sewer Area Charge is calculated as follows: Gross Area of Knob Hill of Lakeville Second Addition 1,298,392.92 s.f. Less Area of Outlot A (Park Area) (-) 196,990.00 s.f. Less Area of Outlot B (Stormwater Management Basin) (-) 101,065.00 s.f. Total = 1,000,337.92 s.f. 1,000,337.92 s.f. x $0.178/s.f. = $178,060.14 Net Area of Knob Hill of Lakeville Second Addition Single Family Area Charge Total Trunk Storm Sewer Area Charge The Developer will receive a credit to the Trunk Storm Sewer Area Charge for deeding Outlot B to the City, consistent with City policy. The credit is based on the area of the outlot, and is calculated at the rate of $5,500 per acre, and will be applied to the final plat cash fees, calculated as follows: 2.32 acres x $5,500/acre = $12,760.00 Total Area of Outlot B Per Acre Credit Total Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final construction plans. RREESSIIDDEENNTTIIAALL BBUUFFFFEERR YYAARRDD RREEQQUUIIRREEMMEENNTTSS 179th Street and Pilot Knob Road are minor arterial County roadways as identified in the City’s Transportation Plan. A buffer yard screen containing a combination of earth berms, plantings, KKNNOOBB HHIILLLL OOFF LLAAKKEEVVIILLLLEE SSEECCOONNDD AADDDDIITTII OONN –– FFIINNAALL PPLLAATT SSEEPPTTEEMMBBEERR 1188,, 22002200 PPAAGGEE 77 OOFF 1100 or privacy fencing of sufficient density to provide a minimum visual screen shall be provided adjacent to 179th Street and Pilot Knob Road. FEMA FLOODPLAIN ANALYSIS Knob Hill of Lakeville Second Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation, there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. WWEETTLLAANNDDSS Jacobson Environmental conducted a site investigation on April 28, 2017. Eight areas within the Knob Hill of Lakeville plat were investigated, including the area that is Knob Hill of Lakeville Second Addition. No wetlands were identified within the project boundaries. The Notice of Application was sent out 6/27/2017. No comments were received during the comment period. Based on the information provided in the report dated 5/11/2017 and site visit, the wetland delineation for the area has been determined to be acceptable for use in implementing the Wetland Conservation Act. TTRREEEE PPRREESSEERRVVAATTIIOONN A tree preservation plan was submitted and approved with the Knob Hill of Lakeville development. The plan proposed to save 15 trees, none of which were in the Knob Hill of Lakeville Second Addition final plat boundaries. No tree preservation plan is needed for the Knob Hill of Lakeville Second Addition final plat. EERROOSSIIOONN CCOONNTTRROOLL The developer is responsible for obtaining a MPCA Construction Permit for the site as well as developing a SWPPP for the site prior to construction. The permit requires that all erosion and sediment BMPS be clearly outlined in a site’s SWPPP. Changes made throughout construction should be documented in the SWPPP. A native seed mix for the basins must be used and a maintenance schedule for the first 2 years must be included in the plans. This must include mowing 2 to 3 times, 30 days apart during the first year with the mower deck set about 6-8 inches off the ground. The second year, the pond areas must be mowed once before weeds set their seeds. This will reduce weed establishment and help stimulate the desirable vegetation. This will cut down on maintenance in the long-term. The rear swale along the north property line must be stabilized with erosion control blanket once graded and storm sewer is installed. Additional erosion control measures may be KKNNOOBB HHIILLLL OOFF LLAAKKEEVVIILLLLEE SSEECCOONNDD AADDDDIITTII OONN –– FFIINNAALL PPLLAATT SSEEPPTTEEMMBBEERR 1188,, 22002200 PPAAGGEE 88 OOFF 1100 required during construction as deemed necessary by City staff. Any additional measures required shall be installed and maintained by the developer. SECURITIES The Developer shall provide a Letter of Credit as security for the Developer-installed improvements relating to Knob Hill of Lakeville Second Addition. Construction costs are based upon estimates submitted by the Developer’s engineer on August 8, 2020. CONSTRUCTION COSTS Sanitary Sewer $ 237,551.00 Watermain 319,820.00 Storm Sewer 338,052.00 Street Construction 367,807.00 Erosion Control and Restoration 89,400.00 SUBTOTAL - CONSTRUCTION COSTS $ 1,352,630.00 SUBTOTAL - CONSTRUCTION COSTS REQUIRED $ 1,263,230.00 The Developer provided the City with a Letter of Credit in the amount of $89,400.00 for Erosion Control, Restoration, Grading, and Grading Certification following City Council approval of the preliminary plat. OTHER COSTS Developer’s Design (3.0%) $ 40,578.90 Developer’s Construction Survey (2.5%) 33,815.75 City’s Legal Expense (0.5%) 6,763.15 City Construction Observation (5.0%) 67,631.50 Developer’s Record Drawing (0.5%) 6,763.15 Landscaping Encroachment Removal 42,000.00 20,000 Street Lights 14,400.00 Lot Corners/Iron Monuments 8,200.00 SUBTOTAL - OTHER COSTS $240,152.45 TOTAL PROJECT SECURITY $ 1,503,382.45 The street light security totals $14,400 which consists of twelve (12) post-top street lights at $1,200 each. The Developer shall post a security to ensure the final placement of iron monuments at property corners with the final plat. The security is $100.00 per lot and outlot for a total of $8,200.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all irons have been placed following site grading, street and utility construction. CCAASSHH FFEEEESS KKNNOOBB HHIILLLL OOFF LLAAKKEEVVIILLLLEE SSEECCOONNDD AADDDDIITTII OONN –– FFIINNAALL PPLLAATT SSEEPPTTEEMMBBEERR 1188,, 22002200 PPAAGGEE 99 OOFF 1100 A cash fee for traffic control signs is due with Knob Hill of Lakeville Second Addition. Street signing consists of five (5) stop and street blade combinations at $550 each, one (1) dead end markers at $125 each, and a mobilization fee of $150 for a total of $3,025.00. If the street signs are installed during frost conditions, the developer shall pay an additional $150 for each street sign location. A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat approval and is calculated as follows: 78 units x $10.12/unit/qtr. x 4 qtrs. = $3,157.44 Dwelling Units Streetlight Operating Fee Total A cash fee for one-year of the Environmental Resources Fee shall be paid at the time of final plat approval and is calculated as follows: 78 units x $16.54/unit/qtr. x 4 qtrs. = $5,160.48 Dwelling Units Environmental Resources Fee Total A cash fee for the preparation of record construction drawings and for upgrading the City base map shall be paid at the time of final plat approval and is calculated as follows: 82 units x $90.00/unit = $7,380.00 Lots/Outlots City Base Map Updating Fee Total The Developer shall submit the final plat and construction drawings in an electronic format. The electronic format shall be in either .dwg (AutoCAD) or .dxf format. The Developer shall also pay a cash fee for City Engineering Administration. The fee for City Engineering Administration will be based on three percent (3.00%) of the estimated construction cost, or $40,578.90. CASH REQUIREMENTS Sanitary Sewer Availability Charge 25,506.00 Lateral Watermain Access Charge 16,122.34 Trunk Storm Sewer Area Charge 178,060.14 Traffic Control Signs 3,025.00 Streetlight Operating Fee 3,157.44 Environmental Resources Fee 5,160.48 City Base Map Updating Fee 7,380.00 City Engineering Administration (3.00%) 40,578.90 SUBTOTAL - CASH REQUIREMENTS $278,990.30 CREDITS TO THE CASH REQUIREMENTS Outlot B (Deeded to the City) (Trunk Storm Sewer) $ 12,760.00 Removal of 178th St Temporary Cul-de-sac (Escrow No. 8357) 2,634.52 KKNNOOBB HHIILLLL OOFF LLAAKKEEVVIILLLLEE SSEECCOONNDD AADDDDIITTII OONN –– FFIINNAALL PPLLAATT SSEEPPTTEEMMBBEERR 1188,, 22002200 PPAAGGEE 1100 OOFF 1100 Park Dedication Credit (Park Dedication) 46,000.00 SUBTOTAL - CREDITS TO THE CASH REQUIREMENTS = $ 61,394.52 TOTAL CASH REQUIREMENTS WITH THE FINAL PLAT $217,595.78 RREECCOOMMMMEENNDDAATTIIOONN Engineering recommends approval of the Knob Hill of Lakeville Second Addition final plat, grading and drainage plan, erosion control plan, and utility plan.