Loading...
HomeMy WebLinkAbout18136 Hartlin Ave Surveyf:\jobs\7761 - 7780\7769 - avonlea 4th addition\cad c3d\survey\7769.098.dwgSave Date:08/27/20House Address: Certificate of Survey for: M/I HOMES OF MINNEAPOLIS, LLC 18136 Hartlin Avenue, Lakeville, MN House Model: Dearborn (C) Revisions: ENGINEERING REVIEWED Date:__________________09/29/2020 corlowsky EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required.*Maintain 6" between bottom of siding and sod.*No structures in easements. Planning DepartmentApprovedDate:__________________10/02/2020 mcroatt