HomeMy WebLinkAbout18136 Hartlin Ave Surveyf:\jobs\7761 - 7780\7769 - avonlea 4th addition\cad c3d\survey\7769.098.dwgSave Date:08/27/20House Address:
Certificate of Survey for:
M/I HOMES OF MINNEAPOLIS, LLC
18136 Hartlin Avenue, Lakeville, MN
House Model:
Dearborn (C)
Revisions:
ENGINEERING REVIEWED
Date:__________________09/29/2020 corlowsky
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will
be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.*Maintain 6" between bottom of siding and sod.*No structures in easements.
Planning DepartmentApprovedDate:__________________10/02/2020 mcroatt