Loading...
HomeMy WebLinkAboutITEM 4 3601 Thurston Avenue Anoka, MN 55303 763.231.5840 TPC@PlanningCo.com 1 MEMORANDUM TO: Daryl Morey FROM: D. Daniel Licht, AICP DATE: 8 October 2020 RE: Lakeville – Arris Apartments TPC FILE: 135.01 BACKGROUND Kami Holdings LLC has submitted applications for development of a 197 unit apartment building at the northeast quadrant of Kenrick Avenue and 173rd Street. The proposed development requires consideration of applications for preliminary plat, final plat, a Conditional Use Permit for multiple family uses within the M-1, Mixed Use I-35 Corridor District, a Conditional Use Permit for building height greater than 48 feet, site and building plan review, and vacation of existing public right-of-way and easements. A public hearing to consider the applications has been noticed for the Planning Commission meeting on 15 October 2020. Exhibits: A. Site Location Map B. Zoning Map C. Project Narrative D. Traffic Analysis dated June 13, 2020 E. Pedestrian Crossing Analysis dated September 30, 2020 F. Preliminary Plat G. Site Plan H. Utility Plan I. Grading, Drainage & erosion Control Plan J. Landscape Plan (6 sheets) K. Tree Preservation Plan L. Lighting plan (2 sheets) M. Site Cross Section N. Architectural elevations and cross section drawing (5 sheets) O. Building Floor plans (11 sheets) 2 ANALYSIS Comprehensive Plan. The 2040 Comprehensive Plan guides the subject site for Corridor Mixed Uses on the 2040 Land Use Plan. Corridor Mixed Use land uses are to provide for development within the I-35 corridor of commercial areas with opportunity for incorporating multiple family dwellings nearby to existing and planned transit facilities. The proposed development of the subject site with a multiple family use is consistent with the objectives of the Corridor Mixed Use land use designation based on proximity to the existing Metro Transit terminal on I-35 to the north of the subject site, surrounding businesses and providing for a desirable land use transition to low density residential uses to the east. Residential density for parcels guided Corridor Mixed Use is limited to 26 dwelling units per acre. Density is calculated on the basis of net area of the property to be developed less wetlands and right-of-way for collector and arterial streets. The subject site consists of 3 parcels east and north of Kenrick Avenue and 173rd Street, respectively. The net area of Lot 1, Block 1 is 8.31 acres, which would allow for development of up to 216 dwelling units at 26 dwelling units per acre. The proposed 197 dwelling units are within the density allowed for the subject site by the 2040 Comprehensive Plan. Zoning. The subject site is zoned M-1, Mixed Use I-35 Corridor District consistent with the 2040 Land Use Plan. Multiple family dwellings are allowed as a conditional use within the M-1 District subject to the performance standards established by Section 11-65-5.N of the Zoning Ordinance, which are reviewed in subsequent paragraphs. Surrounding Uses. The subject site is surrounded by the existing and planned uses shown in the table below: Direction 2040 Land Use Zoning Existing Use North Commercial C-3 District Fleet Farm East LD Residential RS-3 District Single family South Commercial C-3 District Pizza Hut, Goodyear, Vacant West -- -- I-35 The M-1 District performance standards require multiple family uses to provide for increased setbacks from the single family neighborhood to the east and the site plan has been designed to shift the building as far west as possible to preserve existing trees and plant additional landscaping as a buffer. The developer provided a cross section drawing of the proposed site plan illustrating the horizontal perspective of the site topography and site plan with the proposed building, landscaping and tree preservation to illustrate the relationship with the adjacent single family neighborhood to the east. The separation of the proposed building and active areas of the site plan from the adjacent residential uses is much greater than would be required of a commercial development of the property and adequately addresses potential compatibility issues. 3 Lot Area. Section 11-65-7.N.1.b(1) of the Zoning Ordinance requires multiple family uses to provide a minimum of 1,675 square feet of net lot area per dwelling unit. The area Lot 1, Block 1 is 8.31 acres or 361,983.6 square feet. Based on 197 dwelling units, the lot area per unit for the proposed multiple family use is 1,837 square feet per dwelling unit, which complies with the Zoning Ordinance. Floor Area Ratio. Section 11-65-7.N.1.b(2) of the Zoning Ordinance limits the floor area ratio for the proposed multiple family building to 0.7 as the subject site abuts single family lots zoned RS- 3 District to the east. The gross floor area of the proposed building (not including the below grade parking level) is 203,974 square feet and the area of the proposed lot is 361,983.6 square feet. The floor area ratio of the proposed development is 0.56, which complies with the limit established by the Zoning Ordinance. Setbacks. The table below outlines the setbacks required for development of the subject site by Section 11-65-7.N.6 and Section 11-65-13 of the Zoning Ordinance. The location of the proposed multiple family building within the lot exceeds the minimum setbacks required by the Zoning Ordinance, including an almost 34 foot increase above the setback required from the east property line abutting the adjacent single family neighborhood. The proposed building setbacks also take into account the future right-of-way requirements for the realignment of Kenrick Avenue as part of the I-35/CSAH 50 interchange ultimate design. Kenrick Ave. 173rd St. North East Required 30ft. 30ft. 10ft. 50ft. Proposed 54.3ft. 99.7ft. 32.8ft. 88.9ft. Dwelling Units. The proposed building has a mix of studio (efficiency), 1-bedroom, 2-bedroom and 3-bedroom dwelling units summarized in the table below: Min Floor Area Required Proposed Floor Area # of Units % of Total Units Studio 500sf. 515-621sf. 23 11.7% 1 Bedroom 700sf. 703-794sf. 80 40.6% 1+ Bedroom 700sf. 863-896sf. 28 14.2% 2 Bedroom 800sf. 1,030-1,199sf. 51 25.9% 3 Bedroom 880sf. 1,331-1,395 15 7.5% The proposed dwelling units comply with the minimum floor area requirements specified in Section 11-17-13.B of the Zoning Ordinance. Section 11-17-15 of the Zoning Ordinance further limits the mix of dwelling units to not more than 30 percent efficiency units, which the proposed building complies with. Exterior finish. The exterior materials for the proposed building must comply with Section 11-65- 7.N.3.a of the Zoning Ordinance requiring minimum of 50 percent of the combined area of all 4 elevations to have an exterior finish of brick, stucco, and/or natural or artificial stone. The submitted building elevation plans identify the type of all exterior finish materials and include a schedule indicating the percent of the total area of the exterior of the principal building using required materials. The use of brick or stone for the exterior finish of the proposed building is 50 percent of the total wall area and complies with the requirements of the Zoning Ordinance. Building Height. Multiple family buildings within the M-1 District are limited to a height of four stories or 48 feet by Section 11-65-7.N.2 of the Zoning Ordinance. Illustrations of the proposed building indicate a flat roof design except for architectural angled roof elements at the building entrances. The architectural design includes two, three, and four story sections to create a varied roof line and wall elevations that minimizes building mass further emphasized by changes in material texture and color. The developer modified the design of the building and site after discussions with City staff to keep the tallest sections of the structure as far west as possible as shown below measured from the east property line  Garage only: 87ft.  2-story section: N/A  3-story section: 138ft.  4-story section 189ft. The height of the roof above the four story building sections is 46 feet and the height to the tallest parapet is 48 feet. There are slanted roofs over the section of the building that include the entrances that have a height of 53 feet to the midpoint of the slanted roof defined in accordance with Section 11-17-7.A of the Zoning Ordinance. Exceptions to zoning district height limits are allowed by approval of a conditional use permit under Section 11-17-7.E of the Zoning Ordinance. The additional building height does not have any effect on the intensity of the use of the property and the site plan does meet the performance standard for the additional building height to provide for an additional 5 feet of setback for each 10 feet of building height above 35 feet for front and side yards. The easterly 53 foot roof section is approximately 400 feet from the property line abutting the adjacent single family neighborhood to the east. The proposed additional building height satisfies the criteria for approval of the conditional use permit. If mechanical equipment is to be located on the building roof, the parapets must be high enough so as to screen the mechanicals from view of Kenrick Avenue, 173rd Street, and the adjacent residential uses in accordance with Section 11-21-13 of the Zoning Ordinance. Streets. The subject site abuts Kenrick Avenue and 173rd Street. Kenrick Avenue is designated as a Major Collector street and 173rd Street as a local street by the 2040 Transportation Plan. The developer has provided a traffic study demonstrating that Kenrick Avenue has adequate capacity for the traffic generated by the proposed development. City staff recommends that 173rd Street be posted as a no parking zone to minimize conflicts with through traffic for the residential neighborhood to the east. The developer received feedback from the adjacent single family 5 neighborhood that 173rd Street should be closed at the east line of the proposed development to prevent traffic from entering the low density residential area. The traffic study indicates that Kenrick Avenue via 173rd Street is the primary access point for the proposed use as well as the single family neighborhood to the east based on ease of access. The report concludes that the single family residential neighborhood will be exposed to minimal through traffic from the proposed development. In addition, closing 173rd Street would leave the residential neighborhood with only one way in and out, which is a circuitous route to the north to Jonquil Avenue/170th Street through another residential neighborhood. Maintaining 173rd Street is consistent with the transportation policies of the 2040 Comprehensive Plan and best practices for subdivision design to provide connections between neighborhoods to encourage interaction, distribute traffic and ensure access for residents, as well as emergency vehicles. City staff does not recommend closing 173rd Street. The site plan has been designed to anticipate future realignment of Kenrick Avenue as part of the City’s long-term plan for the I-35/CSAH 50 interchange for which the City will need to acquire right-of-way in the future. The City has officially mapped acquisition of future right-of-way from the subject site that will be required to be platted as an outlot and the landscape plan must be revised to remove proposed plantings from this outlot such that mature trees are not required to be removed in the future. Existing public right-of-way for Hibbard Highway that is within the subject site is to be vacated concurrent with the platting of the subject site as it no longer serves a public purpose. The dedication of right-of-way for Kenrick Avenue and 173rd Street as shown on the preliminary plat and final plat is subject to review and approval by the City Engineer. Sidewalks. There are existing sidewalks on the east side of Kenrick Avenue and north side of 173rd Street for pedestrian access to the subject site. The sketch plan illustrates a sidewalk from the west end of the building to Kenrick Avenue and a sidewalk from the east end of the building to 173rd Street. The proposed pedestrian accesses meet the requirements of Section 11-65-7.N.4 of the Zoning Ordinance. The submitted plans also indicate provision of a pedestrian crossing from the northeast corner of the Kenrick Avenue and 173rd Street intersection to the west side of Kenrick Avenue, which would provide for access to commercial areas to the southeast. The developer has provided an analysis by a qualified Traffic Engineer of the proposed pedestrian crossing. The analysis finds that there are adequate sight lines for a crossing at this location based on the design and posted speed limit on Kenrick Avenue. The pedestrian crossing analysis also concludes that measures such as installation of button activated flashing crossing signs is not warranted based on established engineering criteria. Staff has forwarded the pedestrian crossing analysis to the City’s transportation engineering consultant for review and the pedestrian crossing is to be subject to review and approval of the City Engineer. Off-Street Parking. The subject site is proposed to have 2 accesses to 173rd Street. The west access is setback approximately 170 feet from the Kenrick Avenue and 173rd Street intersection. The west and east accesses to the subject site are spaced 350 feet apart along 173rd Street and 6 the east access is setback approximately 150 feet from the east lot line. The spacing of the proposed accesses complies with Section 11-19-7.I.6 of the Zoning Ordinance. The proposed building is to have 197 dwelling units and 278 total bedrooms equal to 1.4 bedrooms per dwelling unit. Section 11-19-13 of the Zoning Ordinance requires multiple family dwellings to provide 2.0 parking stalls per dwelling unit if there are less than 2.0 bedrooms per dwelling unit. Section 11-65-7.N.5 of the Zoning Ordinance further requires that a minimum of 1.0 of the required parking stalls per dwelling unit be provided within an attached garage. Based on 197 dwelling units, 394 parking stalls are required of which 7 must be ADA accessible. The breakdown of surface and garage parking shown on the submitted plans is summarized below: Garage stalls 197 Exterior stalls Actual 104 Proof-of-Parking 93 Total 394 The site plan illustrates three van accessible stalls on the surface. The building floor plan illustrates four ADA stalls within the garage. The provision of accessible parking stalls complies with ADA requirements. There are 93 proof of parking stalls shown on the site plan that could be required to be constructed if the City determines that a need has been demonstrated. The traffic analysis submitted by the developer includes an evaluation of off-street parking for the proposed development based on information from the Institute of Transportation Engineers. The parking evaluation reasonably concludes that the proposed apartment building, which has 1.4 bedrooms per dwelling unit, will have adequate off-street parking. A deferred parking agreement will be required for the proposed development. The proposed off-street parking areas and drive aisles are setback more than 15 feet from Kenrick Avenue and 173rd Street as required by Section 11-19-7.I.1 of the Zoning Ordinance and more than 50 feet from the east lot line as required by Section 11-65-7.N.6 of the Zoning Ordinance. Section 11-19-7.I.1 of the Zoning Ordinance requires off-street parking stalls to have minimum dimensions of 9 feet by 20 feet accessed by 24 foot wide drive aisles. The proposed surface parking stalls comply with these minimum dimensions. The floor plans verify that the enclosed garage stalls comply with the minimum dimensions specified by Section 11-19-7.I.3 for minimum 9 foot by 18 foot stalls accessed by 25 foot wide drive aisles (two-way).The plans must be revised to include this information. Sections 11-19-7.I.7 and 12 of the Zoning Ordinance requires the off-street parking area to be paved in accordance the specifications approved by the City Engineer. The parking stalls must striped as required by Section 11-19-7.I.13 of the Zoning Ordinance. The parking area must be surrounded by perimeter concrete curb as required by Section 11-19-7.I.15 of the Zoning Ordinance. 7 Landscaping. A landscape plan has been submitted as required by Section 11-21-7 of the Zoning Ordinance and a tree inventory and preservation plan prepared in accordance with Section 10-4- 11.B of the Subdivision Ordinance overlaid upon the grading plan has been submitted. The landscape plan and tree preservation plan address the perimeter of the site and building foundation with emphasis for screening along Kenrick Avenue and the north lot line, as well as the requirements of Section 11-21-9.A of the Zoning Ordinance for the required buffer yard between the building and existing single family neighborhood to the east as required by Section 11-65-7.N.6 of the Zoning Ordinance. The landscape plan also addresses the provisions of Section 11-21-9.D of the Zoning Ordinance for off-street parking areas. Specific to the yard between the building and the adjacent single family neighborhood to the east, the landscape plan preserves existing significant trees within 40 feet of the east property line and provides for planting of a double row of 20 6-foot black hills spruce and clusters of six- foot balsam fir trees and complemented by ornamental trees on the apartment side of the plantings. The developer has provided a cross section drawing illustrating the proposed buildings and existing single family dwellings to the east relative to tree preservation and proposed landscaping demonstrating the effectiveness of the proposed screening measures. The height of the black hills spruce and balsam fir trees (and all other evergreen trees shown on the landscape plan) must be increased to 8 feet in height to comply with Section 11-21-9.C.1 of the Zoning Ordinance. The location, type, size of proposed plantings comply with the requirements of the Zoning Ordinance and are to be subject to review and approval of the City Forester. Outdoor Amenities. The site plan illustrates a number of outdoor recreation amenities including a patio that includes a pool, play area, grilling area, pergola, and fire pit. These outdoor amenities are all located on the east end of the building and are setback 83 feet from the east lot line, exceeding the 50 foot setback required by Section 11-65-7.N.6 of the Zoning Ordinance. The building elevation plans show a pool mechanical building constructed of rock face block within the area. The outdoor area is enclosed by six foot high fencing that is to be a solid privacy fence on the east side of the patio to block visuals and noise from the area towards the single family neighborhood to the east. There is also pet exercise area on the west end of the building. Section 11-21-5.A of the Zoning Ordinance requires details regarding fencing for the patio and pool area to be submitted for review and approval by the Zoning Administrator, including compliance with Section 11-21-5.G of the Zoning Ordinance related to pools. Exterior Lighting. The developer has submitted a lighting plan showing the location, height, type, and illumination pattern of all exterior lighting. The intensity of exterior lighting is limited not to exceed 115 foot-candles at ground level measured at any point on the subject site and light may not exceed 1 foot-candle measured at the right of way or property line. The submitted exterior lighting plan complies with the provisions of Section 11-16-17 of the Zoning Ordinance. The developer has lowered the height of freestanding poles and added shielding to the fixtures to minimize visibility of the light sources and the amount of light cast towards the residential neighborhood to the east, which is demonstrated by the photometric plan as there is almost no light cast east of the building foot print. 8 Signs. The site plan indicates one freestanding sign to be located adjacent to the west site access to 173rd Street. Section 11-23-19.D of the Zoning Ordinance allows uses within the M-1 District one freestanding sign per lot not to exceed 100 square feet in area or 20 feet in height. With walls facing Kenrick Avenue and 173rd Street, one wall sign not to exceed 100 square feet would be allowed on each elevation, but none is shown on the submitted plans. A sign permit is required to be issued prior to placement of any sign upon the property in accordance with Section 11-23- 5 of the Zoning Ordinance. Waste Storage. The applicant’s narrative describes indoor collection of storage of trash and recycling stored in 2 rooms at the garage level, shown on the building floor plans, negating the need to address any outdoor waste containers being enclosed in compliance with Section 11-18- 11.B of the Zoning Ordinance. Park Dedication. Platting of the subject site requires dedication for the City’s park system in accordance with Section 10-4-8 of the Subdivision Ordinance. The 2015 Parks, Trails, and Open Space Plan does not identify acquisition of land from the subject site for public park use. Satisfaction of park dedication requirements is to be met as a cash fee in lieu of land paid at the time of final plat approval in accordance with Section 11-4-8.J Of the Subdivision Ordinance. Easements. Section 10-4-4 of the Subdivision Ordinance requires dedication of drainage and utility easements at the perimeter of the proposed lot and over public stormwater basins or utilities. Perimeter easements are shown on the preliminary and final plat. Existing public and private drainage and utility easements are also proposed to be vacated with approval of the proposed final plat as they no longer serve a public purpose. These and other easements to overlay public utilities are subject to review and approval of the City Engineer. Grading. The submittal includes a preliminary grading plan. All grading, drainage, retaining walls, erosion control and wetland impact/mitigation issues are to be subject to review and approval of the City Engineer. Utilities. The subject site is within the current Municipal Urban Service Area (MUSA). Sewer and water utilities are available to the subject site. The developer has submitted a utility plan for connection to municipal sewer and water utilities. All utility issues are subject to review and approval of the City Engineer. Outlot A. The preliminary plat and final plat include Outlot A which is the portion of the property being platted that is located south of 173rd Street. Outlot A is guided by the 2040 Comprehensive Plan for Commercial uses and is zoned C-3, General Commercial District. Outlot A will be retained under private ownership for future development. Development Agreement. A condition of final plat approval will require the developer to enter into a development agreement as drafted by the City Attorney and approved by the City Council to guarantee completion of all improvements, posting of required securities, and payment of any fees. 9 CONCLUSION The proposed Arris apartments development is consistent with the goals and policies of the 2040 Comprehensive Plan for inclusion of multiple family land uses within commercial developments adjacent to the I-35 corridor in proximity to transit facilities to provide market support for surrounding business and expand housing choices within Lakeville. Furthermore, the proposed development complies with the performance standards applicable to multiple family uses within the M-1 District established by the Zoning Ordinance and Subdivision Ordinance. Findings of fact supporting the approval of a conditional use permit to allow for the proposed multiple family use and building section height greater than 48 feet has been drafted for consideration by the Planning Commission. Our office and City staff recommend approval of the applications subject to the following stipulations: 1. The subject site shall be developed in accordance with the site and building plans as approved by the City Council. 2. Any mechanical equipment installed on the building roof shall be screened from view of Kenrick Avenue, 173rd Street, and the adjacent residential uses in accordance with Section 11-21-13 of the Zoning Ordinance. 3. Dedication of right-of-way for Kenrick Avenue and 173rd Street as shown on the preliminary and final plat and revision of the final plat to include an outlot for the public right-of-way to be acquired for the Ultimate I-35/CSAH 50 Interchange shall be subject to review and approval by the City Engineer. 4. A no parking zone on 173rd Street within the plat shall be designated by resolution of the City Council to be adopted at the time of final plat approval. 5. The proposed Kenrick Avenue pedestrian crossing at 173rd Street shall be subject to review and approval of the City Engineer. 6. A deferred parking agreement shall be approved for the 93 proof-of-parking stalls shown on the site plan. 7. The dimensions and construction specifications for enclosed off-street parking stalls and drive aisles shall comply with the provisions of Section 11-19-7.I.3 of the Zoning Ordinance. 8. The landscape plan shall be revised to remove proposed plantings from areas of the subject site the City has identified for acquisition of right-of-way for Kenrick Avenue and all plantings shall comply with Section 11-21-9.C of the Zoning Ordinance subject to review and approval of the City Forester. 10 9. All fences shall comply with Section 11-21-5 of the Zoning Ordinance and require issuance of a permit subject to review and approval of the Zoning Administrator prior to installation of any fence upon the property. 10. All signs shall comply with Section 11-23-19.D of the Zoning Ordinance and require a sign permit prior to placement upon the property, subject to review and approval of the Zoning Administrator. 11. Any exterior storage of waste containers shall require an enclosure meeting the requirements of Section 11-18-11.B of the Zoning Ordinance. 12. The final plat shall require satisfaction of park dedication requirements as a cash fee in lieu of land in accordance with in accordance with Section 11-4-8.J Of the Subdivision Ordinance. 13. All drainage and utility easements shall be subject to review and approval of the City Engineer. 14. All grading, drainage, erosion control, and wetland impact/mitigation plans shall be subject to review and approval of the City Engineer. 15. All utility plans shall be subject to review and approval of the City Engineer. 16. The developer shall enter into a development agreement drafted by the City Attorney and subject to approval of the City Council prior to approval of a final plat. c. Justin Miller, City Administrator David Olson, Community and Economic Development Director Alex Jordon, Assistant City Engineer Andrea McDowell-Poehler, City Attorney EXHIBIT C EXHIBIT D 1 | P a g e L a k e v i l l e A p a r t m e n t s A d d e n d u m , L a k e v i l l e , M N September 30, 2020 To: Matthew Knutson, AMCON From: Vernon Swing, PE Re: Pedestrian Crossing Analysis Addendum – Lakeville Apartments, Lakeville, MN Per your request, Swing Traffic Solutions, LLC has conducted a pedestrian crossing analysis as an addendum to the original traffic analysis dated July 13, 2020, which was completed on behalf of the proposed 196-unit Lakeville Apartments Multi-family Housing development in Lakeville, MN. The proposed project will develop the property at 17296 Kenrick Avenue which is approximately 8.31 acres in size and is located on the north side of 173rd Street West and east side of Kenrick Avenue, just south of the Fleet Farm store. This memorandum summarizes an investigation of pedestrian crossing traffic control options for a proposed crossing of Kenrick Avenue from the north side of 173 rd Street W. In particular, a safety analysis regarding sight distance, and a warrant analysis regarding potential upgraded crossing conditions were investigated. Sight Distance Several issues can affect the appropriateness of a location’s selection for a pedestrian crosswalk, including travel speed, traffic volumes, pedestrian volumes and sight distance. The need for enhanced traffic control at crossing locations varies depending on the speed of motor vehicle traffic in the area. In this case, Kenrick Avenue is signed for 30 mph. With a 30 mph speed limit we can determine the necessary sight distance for drivers of vehicles to able to see a pedestrian crossing the street and safely stop without striking the pedestrian. This is referred to as stopping sight distance and it is based on the distance travelled while reacting to first seeing an object, or pedestrian in this case, in the road and then stopping. The minimum stopping sight distances for various speed are summarized by the American Association of State Highway and Transportation Officials (AASHTO) and are shown in the Table below. EXHIBIT E 2 | P a g e L a k e v i l l e A p a r t m e n t s A d d e n d u m , L a k e v i l l e , M N In this case, the stopping sight distance exceeds the 200-foot minimum in each direction from the anticipated crossing location, with field measurements confirming the actual sight distance is 467 feet to the west northwest, and 500+ feet to the south. Therefore, a crossing at this location can be considered and the type of crossing, whether signalized, augmented with flashing beacons or augment with warning signs was investigated. Pedestrian Signal Warrants The MNMUTCD has identified traffic signal warrants for installation of traffic signals to allow pedestrians to cross. According to the MNMUTCD, “The need for a traffic control signal at an intersection or mid- block crossing shall be considered if an engineering study finds that one of the following criteria is met: A. For each of any 4 hours of an average day, the plotted points representing the vehicles per hour on the major street (total of both approaches) and the corresponding pedestrians per hour crossing the major street (total of all crossings) all fall above the curve in Figure 4C-5; or B. For 1 hour (any four consecutive 15-minute periods) of an average day, the plotted point representing the vehicles per hour on the major street (total of both approaches) and the corresponding pedestrians per hour crossing the major street (total of all crossings) falls above the curve in Figure 4C-7.” 3 | P a g e L a k e v i l l e A p a r t m e n t s A d d e n d u m , L a k e v i l l e , M N The traffic volumes present on Kenrick Avenue assuming the Build out of the proposed project are shown on Figure 6 in the original traffic impact analysis and total 954 vehicles in the highest peak hour. From Figure 4C-7 (Peak Hour) the pedestrian traffic crossing Kenrick Avenue would need to be 300 per hour to warrant a traffic signal. Similarly, from Figure 4C-5 (4 Hour), if the Kenrick Avenue traffic were to total at least an average of 900 vehicles per hour for four hours the pedestrian crossing demand would need to be 160 per hour. Based on field investigations conducted in September of 2020 there is no pedestrian demand during the PM Peak hour today, thus it is very unlikely a traffic signal would be warranted for this crossing. Similarly, MNMUTCD includes warrants for a hybrid rapid flashing beacon to alert drivers to the presence of pedestrians crossing roadways. The MNMUTCD states, “If a traffic control signal is not justified under the signal warrants of Chapter 4C and if gaps in traffic are not adequate to permit pedestrians to cross, or if pedestrian delay is excessive, the need for a pedestrian hybrid beacon should be considered on the basis of an engineering study that considers major-street volumes, speeds, widths, and gaps in conjunction with pedestrian volumes, walking speeds, and delay. For a major street where the posted or statutory speed limit or the 85th-percentile speed is 35 mph or less, the need for a pedestrian hybrid beacon should be considered if the engineering study finds that the plotted point representing the vehicles per hour on the major street (total of both approaches) and the corresponding total of all pedestrians crossing the major street for 1 hour (any four consecutive 15-minute periods) of an average day falls above the applicable curve in Figure 4F-1 for the length of the crosswalk.” In this case the pedestrian crossing distance is 42 feet. 4 | P a g e L a k e v i l l e A p a r t m e n t s A d d e n d u m , L a k e v i l l e , M N Again the traffic volume on Kenrick Avenue totals 954 vehicles during the PM Peak hour, and based on a crossing distance of 42 feet the pedestrian traffic would need to exceed 120 per hour to justify the installation of a hybrid rapid flashing beacon. It is very unlikely this treatment will be warranted. It is suggested that advanced crosswalk warning signs (W11-2) and crosswalk signs (W11-2 plus W16-7P) be installed to alert drivers of potential pedestrian activity. Please contact Vernon Swing at vswingtraffic@gmail.com or 612-968-4142 with any questions. EXHIBIT F EXHIBIT G EXHIBIT H EXHIBIT I 17 ARB 7 BH 3 CH 3 BO 3 CH 3 CA 1 JL 2 BF 3 JL 3 FM 3 RM 1 JL 1 JL 3 CA 3 SB 3 CA 1 BL 3 BF 1 BO 3 JL 1 BF 1 HL 1 BO 5 BH 7 SB 5 BF 6 SB 5 BH 3 RB 1 JL 20 BH 3 SB 5 BL 5 BL 1 BO 3 HL 2 BO 5 CA 1 JL 3 JL 6 SB 1 FM 5 WP 20 MKL 14 BF f:\jobs\8681 - 8700\8689 - kami - lakeville apartments\cad c3d\landscape\8689_landscape.dwgSave Date:08/14/20ofKAMI HOLDINGS LLC3120 Woodbury Drive, Suite 100Woodbury, MN 55125REVISIONS DRAWN BY: DESIGNED BY: ISSUE DATE:08/12/20ARRIS APARTMENTSLakeville, MinnesotaName: Signature: Date: 08/12/20 License #: 1. 08/14/20 Per Owner Ryan J. Ruttger, RLA 56346 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. RJR RJR 6 PRELIM I N A R Y 2'(MIN.)6"12" UNDISTURBED SUBSOIL ( SEE LANDSCAPE NOTES FOR TYPE OF MULCH ) REMOVE BURLAP & ROPE FROM TOP 1/3 OF BALL IF SHRUB IS B & B, THEN BACKFILL MIX 4 INCHES MULCH EXISTING GRADE GUY WIRE WITH WEBBING FLAGGING- ONE PER WIRE PLANTING SOIL MIXTURE (SEE SPEC.) MINIMUM 1/2 WIDTH OF ROOT BALL 4"-6" SHREDDED BARK MULCH UNDISTURBED OR STABILIZED SUBSOIL NOTE: GUY ASSEMBLY OPTIONAL BUT CONTRACTOR ASSUMES FULL RESPONSIBILITY FOR MAINTAINING TREE IN A PLUMB POSITION FOR THE DURATION OF THE GUARANTEE PERIOD GUY ASSEMBLY- 16" POLYPROPYLENE OR POLYETHYLENE (40 MIL) 1-1/2" WIDE STRAP (TYP) DOUBLE STRAND 10 GA. WIRE, 2-7" ROLLED STEEL POSTS (MnDOT 3401) @ 180° O.C. (SEE STAKING DIAGRAM) COORDINATE STAKING TO INSURE UNIFORM ORIENTATION OF GUY LINES AND STAKES 2. TRIM OUT DEAD WOOD AND WEAK AND/OR DEFORMED TWIGS. DO NOT CUT A LEADER. DO NOT PAINT CUTS. 4. PLACE PLANT IN PLANTING HOLE WITH BURLAP AND WIRE BASKET, (IF USED), INTACT. BACKFILL WITHIN APPROXIMATELY 12" OF THE TOP OF ROOTBALL, WATER PLANT. REMOVE TOP 1/3 OF THE BASKET OR THE TOP TWO HORIZONTAL RINGS, WHICHEVER IS GREATER. REMOVE ALL BURLAP AND NAILS FROM TOP 1/3 OF THE BALL. REMOVE ALL TWINE. 3. SET PLANT ON UNDISTURBED NATIVE SOIL OR THOROUGHLY COMPACTED BACKFILL SOIL. INSTALL PLANT SO THE ROOT FLARE IS AT OR UP TO 2" ABOVE THE FINISHED GRADE. 6. WATER TO SETTLE PLANTS AND FILL VOIDS. 5. PLUMB AND BACKFILL WITH BACKFILL SOIL. 7. WATER WITHIN TWO HOURS OF INSTALLATION. WATERING MUST BE SUFFICIENT TO THOROUGHLY SATURATE ROOT BALL AND PLANTING HOLE. 8. PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERING UNLESS SOIL MOISTURE IS EXCESSIVE. 1. SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING PLAN TREE WRAP BACKFILL MIX PAINTED FLUORESCENT ORANGE WHITE FLAGGING (TYP.) DOUBLE STRAND 12 GAUGE WIRE 8" 2-PLY NYLON STRAPS 8' STEEL TEE POST- 4 INCHES HARDWOOD MULCH FROM TOP 1/3 OF THE BALL REMOVE BURLAP & ROPE UNDISTURBED SUBSOIL 4 INCH DEEP SAUCER NOTE: SEE PLANTING NOTES FOR THE TYPE OF MULCH MATERIAL TO USE. 12"6"2'(MIN.)6"6"3 REQUIRED AT 120 L1PRELIMINARY LANDSCAPE PLANEXHIBIT J SHRUBS CODE COMMON NAME BCB Autumn Magic Black Chokeberry SSC Summersweet RTD Dwarf Red Twig Dogwood DBH Dwarf Bush Honeysuckle CWH Common Witch Hazel ABH Annabelle Hydrangea NBS Summer Wine Seward Ninebark LLA Lemon Lights Azalea APC Alpine Currant SPG Goldflame Spirea MKL Miss Kim Lilac VBC Bailey`s Compact American Cranberry Bush EVERGREEN SHRUBS CODE COMMON NAME JSG Sea Green Juniper YEW Tauton Yew ARB Little Giant Arborvitae GRASSES CODE COMMON NAME KFG Feather Reed Grass PDS Prairie Dropseed PERENNIALS CODE COMMON NAME MSY Moonshine Yarrow NEA Purple Dome New England Aster MBC Moonbeam Coreopsis PCF Prairie Splendor Coneflower DLB Baja Daylily DLS Stella De Oro Daylily BSC Berry Smoothie Coral Bells SGF Spike Gayfeather WLC Walkers Low Catmint LRS Little Spire Russian Sage BES Goldsturm Coneflower SCS Stonecrop PLANT KEY f:\jobs\8681 - 8700\8689 - kami - lakeville apartments\cad c3d\landscape\8689_landscape.dwgSave Date:08/14/20ofKAMI HOLDINGS LLC3120 Woodbury Drive, Suite 100Woodbury, MN 55125REVISIONS DRAWN BY: DESIGNED BY: ISSUE DATE:08/12/20ARRIS APARTMENTSLakeville, MinnesotaName: Signature: Date: 08/12/20 License #: 1. 08/14/20 Per Owner Ryan J. Ruttger, RLA 56346 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. RJR RJR 6 PRELIM I N A R Y L2PRELIMINARY LANDSCAPE PLAN SHRUBS CODE COMMON NAME BCB Autumn Magic Black Chokeberry SSC Summersweet RTD Dwarf Red Twig Dogwood DBH Dwarf Bush Honeysuckle CWH Common Witch Hazel ABH Annabelle Hydrangea NBS Summer Wine Seward Ninebark LLA Lemon Lights Azalea APC Alpine Currant SPG Goldflame Spirea MKL Miss Kim Lilac VBC Bailey`s Compact American Cranberry Bush EVERGREEN SHRUBS CODE COMMON NAME JSG Sea Green Juniper YEW Tauton Yew ARB Little Giant Arborvitae GRASSES CODE COMMON NAME KFG Feather Reed Grass PDS Prairie Dropseed PERENNIALS CODE COMMON NAME MSY Moonshine Yarrow NEA Purple Dome New England Aster MBC Moonbeam Coreopsis PCF Prairie Splendor Coneflower DLB Baja Daylily DLS Stella De Oro Daylily BSC Berry Smoothie Coral Bells SGF Spike Gayfeather WLC Walkers Low Catmint LRS Little Spire Russian Sage BES Goldsturm Coneflower SCS Stonecrop PLANT KEY f:\jobs\8681 - 8700\8689 - kami - lakeville apartments\cad c3d\landscape\8689_landscape.dwgSave Date:08/14/20ofKAMI HOLDINGS LLC3120 Woodbury Drive, Suite 100Woodbury, MN 55125REVISIONS DRAWN BY: DESIGNED BY: ISSUE DATE:08/12/20ARRIS APARTMENTSLakeville, MinnesotaName: Signature: Date: 08/12/20 License #: 1. 08/14/20 Per Owner Ryan J. Ruttger, RLA 56346 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. RJR RJR 6 PRELIM I N A R Y L3PRELIMINARY LANDSCAPE PLAN SHRUBS CODE COMMON NAME BCB Autumn Magic Black Chokeberry SSC Summersweet RTD Dwarf Red Twig Dogwood DBH Dwarf Bush Honeysuckle CWH Common Witch Hazel ABH Annabelle Hydrangea NBS Summer Wine Seward Ninebark LLA Lemon Lights Azalea APC Alpine Currant SPG Goldflame Spirea MKL Miss Kim Lilac VBC Bailey`s Compact American Cranberry Bush EVERGREEN SHRUBS CODE COMMON NAME JSG Sea Green Juniper YEW Tauton Yew ARB Little Giant Arborvitae GRASSES CODE COMMON NAME KFG Feather Reed Grass PDS Prairie Dropseed PERENNIALS CODE COMMON NAME MSY Moonshine Yarrow NEA Purple Dome New England Aster MBC Moonbeam Coreopsis PCF Prairie Splendor Coneflower DLB Baja Daylily DLS Stella De Oro Daylily BSC Berry Smoothie Coral Bells SGF Spike Gayfeather WLC Walkers Low Catmint LRS Little Spire Russian Sage BES Goldsturm Coneflower SCS Stonecrop PLANT KEY f:\jobs\8681 - 8700\8689 - kami - lakeville apartments\cad c3d\landscape\8689_landscape.dwgSave Date:08/14/20ofKAMI HOLDINGS LLC3120 Woodbury Drive, Suite 100Woodbury, MN 55125REVISIONS DRAWN BY: DESIGNED BY: ISSUE DATE:08/12/20ARRIS APARTMENTSLakeville, MinnesotaName: Signature: Date: 08/12/20 License #: 1. 08/14/20 Per Owner Ryan J. Ruttger, RLA 56346 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. RJR RJR 6 PRELIM I N A R Y L4PRELIMINARY LANDSCAPE PLAN SHRUBS CODE COMMON NAME BCB Autumn Magic Black Chokeberry SSC Summersweet RTD Dwarf Red Twig Dogwood DBH Dwarf Bush Honeysuckle CWH Common Witch Hazel ABH Annabelle Hydrangea NBS Summer Wine Seward Ninebark LLA Lemon Lights Azalea APC Alpine Currant SPG Goldflame Spirea MKL Miss Kim Lilac VBC Bailey`s Compact American Cranberry Bush EVERGREEN SHRUBS CODE COMMON NAME JSG Sea Green Juniper YEW Tauton Yew ARB Little Giant Arborvitae GRASSES CODE COMMON NAME KFG Feather Reed Grass PDS Prairie Dropseed PERENNIALS CODE COMMON NAME MSY Moonshine Yarrow NEA Purple Dome New England Aster MBC Moonbeam Coreopsis PCF Prairie Splendor Coneflower DLB Baja Daylily DLS Stella De Oro Daylily BSC Berry Smoothie Coral Bells SGF Spike Gayfeather WLC Walkers Low Catmint LRS Little Spire Russian Sage BES Goldsturm Coneflower SCS Stonecrop PLANT KEY f:\jobs\8681 - 8700\8689 - kami - lakeville apartments\cad c3d\landscape\8689_landscape.dwgSave Date:08/14/20ofKAMI HOLDINGS LLC3120 Woodbury Drive, Suite 100Woodbury, MN 55125REVISIONS DRAWN BY: DESIGNED BY: ISSUE DATE:08/12/20ARRIS APARTMENTSLakeville, MinnesotaName: Signature: Date: 08/12/20 License #: 1. 08/14/20 Per Owner Ryan J. Ruttger, RLA 56346 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. RJR RJR 6 PRELIM I N A R Y L5PRELIMINARY LANDSCAPE PLAN TREES CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER RM 3 Acer rubrum `Northwood`Northwoods Red Maple 2.5" Cal. B&B FM 4 Acer x freemanii `Sienna`Sienna Glen Maple 3.5" Cal. B&B RB 3 Betula nigra Clump Form, 2.5" Cal Equivalent River Birch Multi-Trunk 10` Ht.B&B HL 4 Gleditsia triacanthos inermis `Harve`Northern Acclaim Thornless Honey Locust 2.5" Cal. B&B BO 8 Quercus macrocarpa Bur Oak 2.5" Cal. B&B BL 11 Tilia americana `Boulevard`Boulevard Linden 2.5" Cal. B&B CONIFEROUS TREES CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER BF 25 Abies balsamea Balsam Fir 6` Ht.B&B BH 37 Picea glauca densata Black Hills Spruce 6` Ht.B&B WP 5 Pinus strobus White Pine 8` Ht.B&B CH 6 Tsuga canadensis Canadian Hemlock 6` Ht.B&B ORNAMENTAL TREES CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER SB 25 Amelanchier x grandiflora `Autumn Brilliance` Clump Form, 1.5" Cal Equivalent Autumn Brilliance Serviceberry 7` Ht.B&B CA 14 Malus x `Prairifire` Red Flowers Prairifire Crabapple 1.5" Cal. B&B JL 14 Syringa reticulata `Ivory Silk` White Flowers Ivory Silk Japanese Tree Lilac 1.5" Cal. B&B BOTANICAL NAME COMMON NAME PLANT SCHEDULE SHRUBS CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER BCB 14 Aronia melanocarpa `Autumn Magic`Autumn Magic Black Chokeberry #5 Cont. SSC 18 Clethra alnifolia `Hummingbird`Summersweet #5 Cont. RTD 30 Cornus sericea `Alleman`s Compact`Dwarf Red Twig Dogwood #5 Cont. DBH 17 Diervilla lonicera Dwarf Bush Honeysuckle #5 Cont. ABH 68 Hydrangea arborescens `Annabelle`Annabelle Hydrangea #5 Cont. NBS 42 Physocarpus opulifolius `Seward` TM Summer Wine Seward Ninebark #5 Cont. LLA 56 Rhododendron x `Lemon Lights`Lemon Lights Azalea #5 Cont. APC 53 Ribes alpinum Alpine Currant #5 Cont. SPG 76 Spiraea x bumalda `Goldflame` Gold Foliage, Red Flowers Goldflame Spirea #5 Cont. MKL 45 Syringa patula `Miss Kim`Miss Kim Lilac #5 Cont. VBC 9 Viburnum trilobum `Bailey Compact` Red Fall Color Bailey`s Compact American Cranberry Bush #5 Cont. EVERGREEN SHRUBS CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER JSG 36 Juniperus chinensis `Sea Green`Sea Green Juniper #5 Cont. YEW 41 Taxus x media `Tauntonii`Tauton Yew #5 Cont. ARB 17 Thuja occidentalis `Little Giant`Little Giant Arborvitae #5 Cont. GRASSES CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER KFG 105 Calamagrostis x acutiflora `Karl Foerster` Feather Reed Grass #5 Cont. PDS 91 Sporobolus heterolepis Prairie Dropseed #5 Cont. PERENNIALS CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER MSY 39 Achillea x `Moonshine`Moonshine Yarrow #1 Cont. NEA 37 Aster novae-angliae `Purple Dome`Purple Dome New England Aster #1 Cont. MBC 27 Coreopsis x `Moonbeam`Moonbeam Coreopsis #1 Cont. PCF 31 Echinacea purpurea `Prairie Splendor` Prairie Splendor Coneflower #1 Cont. DLB 72 Hemerocallis x `Baja` Red Flowers Baja Daylily #1 Cont. DLS 25 Hemerocallis x `Stella De Oro` Yellow / Gold Flowers Stella De Oro Daylily #1 Cont. BSC 20 Heuchera x `Berry Smoothie`Berry Smoothie Coral Bells #1 Cont. SGF 67 Liatris spicata `Kobold` Purple Flowers Spike Gayfeather #1 Cont. WLC 40 Nepeta x faassenii `Walkers Low`Walkers Low Catmint #1 Cont. LRS 46 Perovskia atriplicifolia `Little Spire`Little Spire Russian Sage #1 Cont. BES 40 Rudbeckia fulgida `Goldsturm`Goldsturm Coneflower #1 Cont. SCS 37 Sedum spectabile `Autumn Joy`Stonecrop #1 Cont. GROUND COVERS CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER WOOD 5,713 sf Hardwood Mulch Non-Woven Geotextile Incidental Double Shredded Hardwood Mulch 4" Depth ROCK 10,346 sf Rock Mulch Non-Woven Geotextile Incidental 1.5" Trap Rock Mulch 4" Depth SOD 146,453 sf Turf Sod Bluegrass Kentucky Bluegrass sod TIII 22,348 sf Type III - Dry Basin Seed Mix Refer to notes for acceptable seeding methods. Seeding Rate 66.0 lb/ac MnDOT Seed Mix 33-262 seed TIV 45,483 sf Type IV - Native Seed Mix Refer to notes for acceptable seeding methods. Seeding Rate 50.0 lb/ac MnDOT Seed Mix 35-241 seed DG 1,500 sf Decomposed Granite Compacted, Non-woven Geotextile Incidental Decomposed Granite 4" Depth BOTANICAL NAME COMMON NAME PLANT SCHEDULE f:\jobs\8681 - 8700\8689 - kami - lakeville apartments\cad c3d\landscape\8689_landscape.dwgSave Date:08/14/20ofKAMI HOLDINGS LLC3120 Woodbury Drive, Suite 100Woodbury, MN 55125REVISIONS DRAWN BY: DESIGNED BY: ISSUE DATE:08/12/20ARRIS APARTMENTSLakeville, MinnesotaName: Signature: Date: 08/12/20 License #: 1. 08/14/20 Per Owner Ryan J. Ruttger, RLA 56346 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. RJR RJR 6 PRELIM I N A R Y L6PRELIMINARY LANDSCAPE PLAN f:\jobs\8681 - 8700\8689 - kami - lakeville apartments\cad c3d\landscape\8689_tree preservation.dwgSave Date:08/12/20of KAMI HOLDINGS LLC 3120 Woodbury Drive, Suite 100 Woodbury, MN 55125REVISIONSDRAWN BY:DESIGNED BY:ISSUE DATE:08/12/20ARRIS APARTMENTS Lakeville, MinnesotaName:Signature:Date: 08/12/20 License #:1. Ryan J. Ruttger, RLA56346I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Landscape Architect under thelaws of the State of Minnesota.RJRRJRPRELIMINARY3TREE PRESERVATION PLANTP1EXHIBIT K PROPOSED APARTMENTS 4 STORIES P.L. 173rd St W PROPERTY LINE PROPERTY LINEPROPERTY LINE EXHIBIT L 32'16'8'0' ENLARGED SITE CROSS SECTION 1 A306 3/32" = 1' - 0" 32'16'8'0' SITE CROSS SECTION 2 A306 1/32" = 1' - 0"DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091EXHIBIT M SOUTH ELEVATION #11 A301 3/32" = 1'-0" 32'16'8'0' EXTERIOR BUILDING ELEVATIONS - MATERIAL CALCULATIONS SOUTH ELEVATION #22 A301 3/32" = 1'-0" 32'16'8'0' SOUTH ELEVATION #2 CONT.2 A301 3/32" = 1'-0" 32'16'8'0'DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091EXHIBIT N SOUTH ELEVATION #42 A302 3/32" = 1'-0" 32'16'8'0'SOUTH ELEVATION #31 A302 3/32" = 1'-0" 32'16'8'0' SOUTH ELEVATION #52 A302 3/32" = 1'-0" 32'16'8'0' EXTERIOR BUILDING ELEVATIONS - MATERIAL CALCULATIONS DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 NORTH ELEVATION #11 A303 3/32" = 1'-0" 32'16'8'0' NORTH ELEVATION #22 A303 3/32" = 1'-0" 32'16'8'0' NORTH ELEVATION #2 CONT.2 A303 3/32" = 1'-0" 32'16'8'0' EXTERIOR BUILDING ELEVATIONS - MATERIAL CALCULATIONS DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 EAST ELEVATION2 A304 3/32" = 1'-0" 32'16'8'0' WEST ELEVATION #13 A304 3/32" = 1'-0" 32'16'8'0' WEST ELEVATION #24 A304 3/32" = 1'-0" 32'16'8'0' NORTH ELEVATION #31 A304 3/32" = 1'-0" 32'16'8'0' EXTERIOR BUILDING ELEVATIONS - MATERIAL CALCULATIONS DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 POOL BUILDING SOUTH ELEV1 A305 3/32" = 1'-0" 32'16'8'0' POOL BUILDING EAST ELEV2 A305 3/32" = 1'-0" 32'16'8'0' POOL BUILDING NORTH ELEV3 A305 3/32" = 1'-0" 32'16'8'0' POOL BUILDING WEST ELEV4 A305 3/32" = 1'-0" 32'16'8'0' EXTERIOR BUILDING ELEVATIONS - MATERIAL CALCULATIONS MONUMENT SIGN ELEVATION 15 A305 3/32" = 1'-0" 32'16'8'0' MONUMENT SIGN ELEVATION 26 A305 3/32" = 1'-0" 32'16'8'0'DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 GARAGE FLOOR PLAN 'A'1 A101 1/16" = 1'-0" GARAGE FLOOR PLAN 'A'DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091EXHIBIT O GARAGE FLOOR PLAN 'B'1 A101 1/16" = 1'-0" GARAGE FLOOR PLAN 'B'DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 STOR. ELEC./ DATA MAINT.CLOS. 1ST FLOOR PLAN 'A'1 A103 1/16" = 1'-0" 1ST FLOOR PLAN 'A'DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 1,059 SF COMMUNITY POOL EQUIPMENT PACKAGE OFFICE MAILPET LOBBY TWO STORY COFFEE LOBBY HOSPITALITY ELEC. DATA TRASH &MAILMAILSTOR RECYCLE 1,115 SF FITNESS WORK RM RECEPT. 1ST FLOOR PLAN 'B'1 A104 1/16" = 1'-0" 1ST FLOOR PLAN 'B'DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 ELEC./ DATA STOR. 2ND FLOOR PLAN 'A'1 A105 1/16" = 1'-0" 2ND FLOOR PLAN 'A'DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 BELOW STOR. ELEC./DATA STOR TRASH & RECYCLE OPEN TO ROOF OF UNDERGROUND PARKING 2ND FLOOR PLAN 'B'1 A106 1/16" = 1'-0" 2ND FLOOR PLAN 'B'DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 ELEC./ DATA ELEC./ DATA MAINT. CLOS. 2 STORY ROOF STOR. 3RD FLOOR PLAN 'A'1 A107 1/16" = 1'-0" 3RD FLOOR PLAN 'A'DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 STOR. ELEC./DATA ELEC./DATA STOR TRASH & RECYCLE ROOF OF UNDERGROUND PARKING 2 STORY ROOF 3RD FLOOR PLAN 'B'1 A108 1/16" = 1'-0" 3RD FLOOR PLAN 'B'DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 2 STORY ROOF 3 STORY ROOF ELEC./ DATA STOR. 4TH FLOOR PLAN 'A'1 A109 1/16" = 1'-0" 4TH FLOOR PLAN 'A'DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 CLUB ROOM 1073 SF GAME ROOM 485 SF STOR. ELEC./DATA TRASH & RECYCLE ROOF OF UNDERGROUND PARKING 3 STORY ROOF 2 STORY ROOF 4TH FLOOR PLAN 'B'1 A110 1/16" = 1'-0" 4th FLOOR PLAN 'B'DESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091 ONE BEDROOM2 A111 1/4" = 1'-0"730 SF ONE BEDROOM + DEN3 A111 1/4" = 1'-0"730 SF STUDIO ALCOVE1 A111 1/4" = 1'-0"559 SF TWO BEDROOM4 A111 1/4" = 1'-0"1,060 SF THREE BEDROOM5 A111 1/4" = 1'-0"1,331 SF TYPICAL UNIT FLOOR PLANSDESIGN/BUILD | CONSTRUCTION MANAGEMENT | GENERAL CONTRACTING6121 BAKER ROADMINNETONKA, MINNESOTA 55345PHONE: 651-379-9090 FAX: 651-379-9091UNIT COUNT AND MIX 1 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA ARRIS APARTMENTS CONDITIONAL USE PERMIT FINDINGS OF FACT AND RECOMMENDATION On 15 October 2020, the Lakeville Planning Commission met at its regularly scheduled meeting to consider the application of Kami Holdings, LLC for a conditional use permit to allow development of a multiple family use within a M-1 District and exception to building height limit for a principal building within the M-1 District. The Planning Commission conducted a public hearing on the application preceded by published and mailed notice. The applicant was present and the Planning Commission heard testimony from all interested persons wishing to speak. FINDINGS OF FACT 1. The subject property is guided for Corridor Mixed Use land uses by the 2040 Comprehensive Plan. 2. The subject site is zoned M-1, Mixed Use I-35 Corridor District. 3. Legal description of the property is attached as Exhibit A. 4. Section 11-4-3.E of the City of Lakeville Zoning Ordinance provides that the Planning Commission shall consider possible effects of the proposed amendment. Its judgment shall be based upon, but not limited to, the following factors: a. The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. Finding: The proposed land use is consistent with the 2040 Comprehensive Plan goals for inclusion of multiple family land uses within commercial developments adjacent to the I- 35 corridor in proximity to transit facilities to provide market support for surrounding business and expand housing choices within Lakeville. b. The proposed use is or will be compatible with present and future land uses of the area. Finding: The subject site is surrounded by the existing and planned uses shown in the table below: 2 Direction 2040 Land Use Zoning Existing Use North Commercial C-3 District Fleet Farm East LD Residential RS-3 District Single family South Commercial C-3 District Pizza Hut, Goodyear, Vacant West -- -- I-35 The M-1 District performance standards, site topography, and site plan establishing location of the proposed building, landscaping and tree preservation provides for separation of the proposed building and active areas of the site plan from the adjacent uses being much greater than would be required of a commercial development of the property and adequately addresses potential compatibility issues. c. The proposed use conforms to all performance standards contained in the Zoning Ordinance and the City Code. Finding: The proposed use will comply with all performance standards of the Zoning Ordinance and City Code applicable to the subject site including the provisions of Section 11-17-7.E of the Zoning Ordinance for exception to height limit of the M-1 District for the principal building. d. The proposed use can be accommodated with existing public services and will not overburden the City’s service capacity. Finding: The subject site is within the MUSA and the proposed use can be accommodated within the City’s existing public service capacity. e. Traffic generated by the proposed use is within capabilities of streets serving the property. Finding: The subject site is accessed by Kenrick Avenue, which is designated as a Major Collector street by the 2040 Transportation Plan. The traffic analysis and pedestrian crossing analysis submitted by the developer demonstrate that existing streets accessing the property have adequate capacity to accommodate traffic generated by the proposed use. 5. The report dated 8 October 2020 prepared by The Planning Company LLC (TPC) is incorporated herein. RECOMMENDATION The Planning Commission recommends that the City Council approve a Conditional Use Permit allowing development of the Arris Apartments within the M-1 District with an exception to the 3 building height limits of the M-1 District for the principal building conditioned upon compliance with the planning report prepared by TPC dated 8 October 2020. DATED: October 15, 2020 LAKEVILLE PLANNING COMMISSION BY: __________________________ Pat Kaluza, Chair 4 Exhibit A Parcel 1: Outlot D, ARGONNE ESTATES, according to the recorded plat thereof, Dakota County, Minnesota. Parcel 2: Outlot E, ARGONNE ESTATES, according to the recorded plat thereof, Dakota County, Minnesota. Together with that part of vacated Hibbard Highway, as created and dedicated in ARGONNE FARMS, according to the recorded plat thereof, Dakota County, Minnesota, accruing thereto by reason of street vacation. Parcel 3: The East one-half of Lot Four (4), ARGONNE FARMS, according to the recorded plat thereof, Dakota County, Minnesota. Together with that part of vacated Hibbard Highway, as created and dedicated in ARGONNE FARMS, according to the recorded plat thereof, Dakota County, Minnesota, accruing thereto by reason of street vacation. Parcel 4: Lot Four (4), ARGONNE FARMS, EXCEPT the East One-half thereof; Lot Five (5), ARGONNE FARMS, EXCEPTING from said Lot Five (5), the following: Commencing at the Northwest corner of Lot Five (5), thence East seventy-eight and nine tenths (78.9) feet; thence South Twenty-seven degrees Thirty-five minutes West Forty-one and Fifty- four hundredths (41.54) feet; thence South Eighty-eight degrees Twelve minutes West Fifty- eight and Twenty-two hundredths (58.22) feet to the West line of Lot Five (5); thence North to the point of beginning, Dakota County, Minnesota. Together with that part of vacated Hibbard Highway, as created and dedicated in ARGONNE FARMS, according to the recorded plat thereof, Dakota County, Minnesota, accruing thereto by reason of street vacation. EXCEPT that part as described in Final Certificate filed September 9, 1970, per Document No. 55652. 5 Parcel 5: All of Lot Eight (8) except that part of Lot Eight (8), Argonne Farms, lying North of a line drawn from a point on the East line of said Lot Eight (8) distant 250 feet North of the Southeast corner thereof to a point on the West line of said Lot Eight (8) distant 286.27 feet Northerly of the Southwest corner thereof, and East of a line drawn from a point on the aforesaid described line distant 136.65 feet East of the Westerly line of said Lot Eight (8) to a point on the Northerly line of said Lot Eight (8) distant 246 feet Easterly from the Northwest corner thereof, according to the recorded plat thereof, Dakota County, Minnesota. Together with that part of vacated Hibbard Highway, as created and dedicated in ARGONNE FARMS, according to the recorded plat thereof, Dakota County, Minnesota, accruing thereto by reason of street vacation. City of Lakeville Public Works – Engineering Division Memorandum To: Daryl Morey, Planning Director From: Alex Jordan, Assistant City Engineer McKenzie L. Cafferty, Environmental Resources Manager John Hennen, Parks and Recreation Director Copy: Zach Johnson, City Engineer Jerilyn Erickson, Finance Director Gene Abbott, Building Official Dave Olson, Community and Economic Development Director Date: October 8, 2020 Subject: Arris Apartments • Preliminary Plat Review • Final Plat Review • Site Plan Review • Grading and Erosion Control Plan Review • Utility Plan Review • Easement and Right-of-Way Vacation • Conditional Use Permit BBAACCKKGGRROOUUNNDD Kami Holdings, LLC has submitted a preliminary and final plat named Arris Apartments and a site plan and conditional use permits to construct a four-story 197-unit apartment building. The proposed development is located east of and adjacent to Kenrick Avenue and north of and adjacent to 173rd Street. The parent parcels consist of portions of Lots 4, 5 and 8, Argonne Farms and Outlots D and E, Argonne Estates zoned M-1, Mixed Use I-35 Corridor District. The preliminary and final plat consists of one lot within one block and one outlot on 15.36 acres. The proposed development will be completed by: AARRRRIISS AAPPAARRTTMMEENNTTSS –– PPRREELLIIMMIINNAARRYY AA NNDD FFIINNAALL PPLLAATT OOCCTTOOBB EERR 88,, 22002200 PPAAGGEE 22 OOFF 77 Developer: Kami Holdings, LLC Engineer/Surveyor: Carlson McCain SSIITTEE CCOONNDDIITTIIOONNSS The existing site consists of multiple previous uses since removed, such as a hotel and associative parking improvements, and single-family homesteads. The Developer shall remove the existing retaining walls, fence, driveway entrances on Kenrick Avenue and any other encroachments with the development of the site. The Developer shall post a security to guarantee the removal of the site improvements with the final plat. The site contains significant trees scattered throughout the site, including buffer yard landscaping along the east portion of the parent parcels. EEAASSEEMMEENNTT VVAACCAATTIIOONN Several existing public and private easements exist on the parent parcels. The Developer shall vacate the following public easements with the preliminary plat, contingent on City Council approval of the final plat: • Utility Easement per Document No. 119477 (as embraced within the surveyed boundary) • Utility Easement per Document No. 121195 (as embraced within the surveyed boundary) • Utility Easement per Document No. 118342 (as embraced within the surveyed boundary) • Road, drainage and utility easement per Doc. No. 268360 (as embraced within the surveyed boundary) • Slope easement per Doc. No. 176067 • Temporary Easement No. 1, as shown on Lakeville Right of Way Map No. 4 • Hibbard Highway Right-of-Way SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT Kenrick Avenue Arris Apartments is located east of Kenrick Avenue, a major collector roadway as identified by the City’s Transportation Plan. Kenrick Avenue is currently constructed as a three-lane urban roadway with a five-foot wide concrete sidewalk on the west side of the roadway and a five- foot wide concrete sidewalk on the east side of the roadway north of 173rd Street. The Developer is dedicating the necessary right-of-way for the interim Kenrick Avenue improvements, as shown on the preliminary plat. The Developer prepared a traffic study which has been reviewed by the City’s Traffic Engineering consultant. The study identifies that the adjacent roadways have adequate capacity to support the traffic generated by the proposed development. The City of Lakeville adopted an Official Map for CSAH 50/CSAH 5 on March 9, 2004. The Official Map was developed to identify the ultimate right of way needs for the future I- AARRRRIISS AAPPAARRTTMMEENNTTSS –– PPRREELLIIMMIINNAARRYY AA NNDD FFIINNAALL PPLLAATT OOCCTTOOBB EERR 88,, 22002200 PPAAGGEE 33 OOFF 77 35/CSAH 50 Ultimate Interchange Improvements. The Official Map allows the City to control proposed development in the interchange area and to influence development of the adjacent parcels. The City provided the Developer with the linework for the future right-of-way for Kenrick Avenue, as adopted and shown on the Official Map. The proposed building location was established to meet the future set-back requirements from the future right-of-way necessary for construction of the Ultimate Interchange improvements. The Developer shall dedicate Preserve Area Easement or plat the area of the future right-of-way as an outlot on the final plat prior to City Council consideration of the final plat. The ultimate right -of-way would be acquired by the City in the future at the time the Ultimate Interchange Improvements are included in the City’s Capital Improvement Plan. 173rd Street Arris Apartments is located north of 173rd Street, a local roadway as identified by the City’s Transportation Plan. 173rd Street is currently constructed as a two-lane urban roadway with a five-foot wide concrete sidewalk on the north side of the roadway. The Developer is dedicating the necessary right-of-way for 173rd Street as shown on the preliminary and final plat. The City shall approve a resolution establishing no parking along both sides of 173rd Street with the final plat and the Developer shall install no-parking signs. SSIITTEE PPLLAANN Arris Apartments includes the construction of a 197-dwelling unit four-story apartment building. Access to the site will be from two driveway entrances along 173rd Street. The driveway design includes commercial concrete driveway aprons, stop signs, stop bars and pedestrian curb ramps. The Developer shall provide a security with the final plat for the construction of the commercial driveway entrances. An underground parking garage for the apartment building and an at-grade parking lot will be constructed to provide for resident, employee and guest parking. Access to the underground parking garage will be from the west and east sides of the apartment building. The Developer will construct private sidewalk improvements connecting to the public sidewalk along 173rd Street. CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS Construction traffic access and egress for grading, utility, building and street construction shall be from a single rock construction entrance on 173rd Street. No construction traffic will be permitted east of the development along 173rd Street. PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS The Park Dedication requirement for the parent parcels has not been paid and will be satisfied through a cash contribution with the final plat. AARRRRIISS AAPPAARRTTMMEENNTTSS –– PPRREELLIIMMIINNAARRYY AA NNDD FFIINNAALL PPLLAATT OOCCTTOOBB EERR 88,, 22002200 PPAAGGEE 44 OOFF 77 Kenrick Avenue is a major collector roadway and consistent with the City’s Transportation Plan, the City has requested the Developer construct an eight-foot wide sidewalk along the east side of Kenrick Avenue from 173rd Street to 175th Street. The sidewalk improvements would provide a pedestrian connection from the proposed high-density housing to the existing commercial retail in Argonne Village. The Developer requested that the City consider delaying the sidewalk construction until Outlot A is final platted into lots and blocks and in lieu of this connection provide an at-grade pedestrian crossing at 173rd Street. The crossing would connect to the existing sidewalk network along the west side of Kenrick Avenue. City Planning and Engineering staff are concerned with potential safety issues of this marked crossing and requested the Developer complete and engineering analysis for the requested crossing. The City’s Traffic Engineering consultant is currently reviewing the analysis provided by the Developer. The final pedestrian improvements shall be determined prior to City Council consideration of the final plat. UUTTIILLIITTIIEESS SSAANNIITTAARRYY SSEEWWEERR Arris Apartments is located within subdistrict OL-54100 of the Orchard Lake sanitary sewer district as identified in the City’s Comprehensive Sanitary Sewer Plan. Wastewater will be conveyed via existing trunk sanitary sewer to the Empire Wastewater Treatment Facility. The downstream facilities have sufficient capacity to serve the proposed commercial development. Development of Arris Apartments includes construction of a private sanitary sewer service connecting to existing sanitary sewer manhole within 173rd Street. The Developer shall provide a security with the final plat for the connection to the public sanitary sewer and restoration of the public roadway and right-of-way. Two of the parent parcels were previously assessed for sanitary sewer lateral, area and unit charges. City staff are currently reviewing previous assessment agreements to determine if additional lateral sanitary sewer access or availability charges will be required with the final plat and/or building permit. The fees will be determined prior to City Council consideration of the final plat. WWAATTEERRMMAAIINN Development of Arris Apartments includes the construction of a private watermain connecting to the existing watermain along 173rd Street at the proposed east driveway entrance. The Developer shall loop the watermain within the site to provide a second connection to the watermain within 173rd Street. These improvements must be shown on the final utility plan prior to City Council consideration of the final plat. The Developer must remove the existing water service stubs located within the parent parcels that will not be used and post a security with the final plat for their removal, consistent with City’s Construction Specifications. Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City staff with the building permit application and final construction plans. AARRRRIISS AAPPAARRTTMMEENNTTSS –– PPRREELLIIMMIINNAARRYY AA NNDD FFIINNAALL PPLLAATT OOCCTTOOBB EERR 88,, 22002200 PPAAGGEE 55 OOFF 77 Two of the parent parcels were connected to City utilities and paid the sanitary sewer and watermain unit fees. The Developer is eligible to receive City SAC Unit and Watermain Unit credits for the property that was connected to City utilities. The amount of the credits will be determined prior to City Council consideration of the final plat. OOVVEERRHHEEAADD LLIINNEESS There are no overhead utilities located within the final plat. DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG Arris Apartments is located within subdistrict CL-030a of the Crystal Lake stormwater district and OL-060 of the Orchard Lake stormwater district as identified in the City’s Water and Natural Resources Managemen t Plan. Development of Arris Apartments includes the construction of two privately owned and maintained filtration basins. The private filtrations basin will be located on Lot 1, Block 1 and will treat runoff generated from the proposed improvements. The Developer shall sign a private maintenance agreement for the filtration basin and dedicate a maintenance easement over the basin areas prior to City Council consideration of the final plat. The stormwater management design is consistent with City requirements. Following completion of the site improvements and restoration, the Developer shall conduct two double ring infiltrometer tests in the location of the filtration basins to demonstrate that the design infiltration rates have been achieved. The Developer shall provide a security with the final plat to ensure that this testing is completed. The final grading plan shall identify all fill lots in which the building footings will be placed on fill material. The grading specifications shall also indicate that all embankments meet FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings placed on fill material are appropriately constructed. Building Certificates of Occupancy will not be issued until a soils report and an as-built certified grading plan have been submitted and approved by City staff. Arris Apartments contains more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. SSTTOORRMM SSEEWWEERR Development of Arris Apartments includes the construction of a privately owned and maintained storm sewer system. The Developer shall modify the utility plan prior to City Council consideration of the final plat to remove the proposed storm sewer within the future reserve right-of-way area for Kenrick Avenue. AARRRRIISS AAPPAARRTTMMEENNTTSS –– PPRREELLIIMMIINNAARRYY AA NNDD FFIINNAALL PPLLAATT OOCCTTOOBB EERR 88,, 22002200 PPAAGGEE 66 OOFF 77 The Trunk Storm Sewer Area Charge has not been collected on the parent parcels and must be paid with the final plat. The Crystal Lake Surcharge has not been collected on the parent parcels and must be paid with the final plat. Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the building permit application and final construction plans. RREETTAAIINNIINNGG WWAALLLLSS Development of Arris Apartments includes the construction of two privately owned and maintained retaining walls. Retaining walls with a combined height greater than four feet shall be designed by a registered geotechnical or structural engineer and constructed in accordance with plans and specifications consistent with MnDOT requirements. A separate building permit from the City’s Building Official is required prior to the construction of the wall. The walls shall be inspected during construction and certified by the design engineer following construction. FEMA FLOODPLAIN ANALYSIS Arris Apartments is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation, there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. WWEETTLLAANNDDSS The wetland delineation for the site was conducted on 05/30/2019 by Kjolhaug Environmental Services. An onsite visit occurred 7/15/2019. There were several areas investigated on the property. One wetland was identified within the project boundaries. No wetland impacts are proposed with the preliminary plat. The wetland on the site is located in Outlot A and will be dedicated to the City at the time Outlot A is developed. TTRREEEE PPRREESSEERRVVAATTIIOONN A tree preservation plan has been submitted. The plan shows a total of 748 significant trees within the project area. The plan proposes to remove 698 trees (93.3%). The tree totals do not include any tree within Outlot A. A tree preservation plan will be required to be prepared for Outlot A when developed. AARRRRIISS AAPPAARRTTMMEENNTTSS –– PPRREELLIIMMIINNAARRYY AA NNDD FFIINNAALL PPLLAATT OOCCTTOOBB EERR 88,, 22002200 PPAAGGEE 77 OOFF 77 All “save” trees that are damaged or removed will require replacement at a ratio of 2:1 as per the Lakeville Subdivision Ordinance. If there are any additional trees that are identified as needed to be removed during the construction process the developer will be responsible for the removal. EERROOSSIIOONN CCOONNTTRROOLL The plans include a detailed erosion and sediment control plan. The Developer is responsible for meeting all the requirements of the MPCA Construction Permit. Additional erosion control measures may be required during construction as deemed necessary by City staff. Any additional measures required shall be installed and maintained by the Developer. RREECCOOMMMMEENNDDAATTIIOONN Engineering recommends approval of the preliminary plat, site plan, grading and erosion control plan, utility plan, tree preservation plan and easement/right-of-way vacation for Arris Apartments, subject to the requirements and stipulations within this report.