HomeMy WebLinkAbout19945 Harrisburg Way SurveyZoning = RS-3*Maintain 6" between bottom of siding and sod.*No structures in easements.*Draintile connection required.ENGINEERING REVIEWEDDate:__________________09/25/2020corlowskyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION