Loading...
HomeMy WebLinkAbout19008 Inndale Drive SurveyZoning = RS-3EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Draintile connection required.*Maintain 6" between bottom of siding and sod.*No structures in easements.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________09/29/2020corlowsky