HomeMy WebLinkAbout18017 Harlow Path Surveyf:\jobs\7761 - 7780\7769 - avonlea 4th addition\cad c3d\survey\7769.093.dwgSave Date:08/24/20House Address:
Certificate of Survey for:
M/I HOMES OF MINNEAPOLIS, LLC
18017 Harlow Path, Lakeville, MN House Model:
Canton (A)
Revisions:
*Draintile connection required.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
The curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
ENGINEERING REVIEWED
Date:__________________10/06/2020 lvlasaty
Planning DepartmentApprovedDate:__________________10/07/2020 mcroatt