Loading...
HomeMy WebLinkAbout8827 191st Court-Surveyc Pioneer Engineering Revisions: 1.) 08-28-20 Stake house Certificate of Survey for: 2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914 www.pioneereng.comFax: (651) 681-9488 Project # :Folder #:Drawn by: CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS Lennar Corporation 16305 36th Ave N Ste #600 Plymouth, MN 55446-4270 Phone: (952) 249-3000 / Fax: (952) 404-1909 Zoning = RS-3FY - 30'SY - 10' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50' *Draintile connection required. ENGINEERING REVIEWED Date:__________________10/23/2020 lvlasaty The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements.