HomeMy WebLinkAbout8827 191st Court-Surveyc Pioneer Engineering
Revisions:
1.) 08-28-20 Stake house
Certificate of Survey for:
2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914
www.pioneereng.comFax: (651) 681-9488
Project # :Folder #:Drawn by:
CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS
Lennar Corporation
16305 36th Ave N Ste #600
Plymouth, MN 55446-4270
Phone: (952) 249-3000 / Fax: (952) 404-1909
Zoning = RS-3FY - 30'SY - 10' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________10/23/2020 lvlasaty
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.