HomeMy WebLinkAbout19259 Hillcrest Avenue SurveyRevisions:1.) 09-11-20 Stake houseCertificate of Survey for:
Lennar Corporation
16305 36th Ave N Ste #600
Plymouth, MN 55446-4270
Phone: (952) 249-3000 / Fax: (952) 404-1909
c Pioneer Engineering
2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914
www.pioneereng.comFax: (651) 681-9488
Project # :Folder #:Drawn by:
CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS Zoning = RS-3FY - 30'SY - 10' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'*Draintile connection required.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.Lot 1 Block 31074.27EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.