HomeMy WebLinkAbout19759 Henning Avenue-SURVEYZoning = RS-3
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.
ENGINEERING REVIEWED
Date:__________________11/05/2020 lvlasaty