HomeMy WebLinkAbout17978 Hawksbill Drive SURVEYZoning = RS-4ENGINEERING REVIEWEDDate:__________________11/06/2020lvlasatyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.