Loading...
HomeMy WebLinkAboutItem 06.m Date: November 16, 2020 Item No. KEOKUK LIQUOR STORE APPROVE MATERIAL ACQUISTION FROM DISTINCTIVE IRON, LLC Proposed Action Staff recommends adoption of the following motion: Move to approve materials acquisition from Distinctive Iron, LLC for the construction of the Keokuk Liquor Store, City Project 20-24. Overview Bidding the construction of the Keokuk Liquor store will be completed in two packages. The first package will include the structural steel supply and the second package will be for the overall construction of the store. The project was divided into two bidding packages with the steel bid being completed early to ensure those materials will be available when construction starts and to save contractor mark-up. Both bid packages will include the main store construction with an alternate for the construction of the event space. Loeffler Construction & Consulting and Tushie Montgomery Architects prepared the steel bid contract documents and advertised for the steel bid package in October. The City received fourteen bids for the project ranging from a low bid of $179,000 submitted by Distinctive Iron, LLC to a high bid of $232,080. The estimated materials cost for the base bid was $205,000 and $32,500 for the alternate event space for a total estimated cost of $237,500. The recommended low bid is $58,500 under the total estimated cost. Primary Issues to Consider • The total estimated cost includes the liquor store (base bid) and the event space addition (alternate). If the City Council decides to not move forward with the project after receiving the final bid for the overall construction of the store, the City has included a clause in the steel bid contract where the City will only be responsible for reimbursing Distinctive Iron, LLC for the cost of submittals and shop drawings, estimated to be $17,450. Supporting Information • Loeffler Construction & Consulting Letter of Recommendation dated November 6, 2020. Financial Impact: $179,000 Budgeted: Y☒ N☐ Source: Liquor Fund Envision Lakeville Community Values: Diversified Economic Development Report Completed by: Allyn Kuennen, Assistant City Administrator November 6, 2020 City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 Subject: Award Recommendation (Lakeville Liquor South: Bid Package 1 Structural Steel) Attention: City of Lakeville To Whom It May Concern: On November 4, 2020; Loeffler Construction, Tushie Montgomery Architects, and The City of Lakeville were present to hold and witness the public bid opening for The City of Lakeville project 20-24: Lakeville Liquor South Bid Package 1 – Structural Steel Supply. This is the first of two bid packages. (BP-2) represents the remaining scopes of work and will be competitively bid in December. We received (14) bids and the numbers were competitive and below the budget. Results for Bid Package 1 can be found on the attached bid tabulation table. On behalf of Loeffler Construction, I am pleased to provide the following recommendation of award for the above referenced project: Distinctive Iron, LLC: Scope 5.1 Structural Steel & Misc Metals (Materials Only) The attached bid tabulation summarizes the proposals received and identifies the above bidder as low. Unit Price 1 shown on the enclosed Distinctive Iron bid identifies the cost of shop drawings and submittals that will be paid to Distinctive Iron, LLC in the event the project does not move forward as a result of the December 21st, 2020 City Council Meeting. To stay on schedule, the contract has been drafted and will be distributed once approved by City Council. Please review and let me know if you have any questions or concerns. Regards, Mindy Lawrence Project Manager Enc/ 20201105 – Lakeville Liquor 0 Bid Package 1 0 Bid Tabs 5.1 – Distinctive Iron Bid Tabulations Date: 11/5/20 Time: 2:00 pm Lakeville Liquors Bid Package #1 Structural Steel / Misc Metals - Material ALTERNATES Alternate #1 Classroom Addition American Structural Metals 5.1 Y Y Y $175,605 $32,670 Ben's Structural Fabrication 5.1 Y Y Y $175,365 $36,851 Bergh's Fabricating Inc 5.1 Y Y Y $171,225 $33,750 Camelot Metals 5.1 Y Y Y $176,428 $25,458 Central MN Fabricating 5.1 Y Y Y $184,550 $34,300 Daka Corporation 5.1 Y Y Y $169,850 $27,750 Distinctive Iron LLC 5.1 Y Y Y $149,500 $29,500 Integrity Steel Supply 5.1 Y Y Y $185,042 $37,012 K&K Fabrication 5.1 Y Y Y $192,432 $27,453 Koronis Fabricating Inc 5.1 Y N Y $172,445 $36,820 Linco Fabrication Inc 5.1 Y Y Y $182,580 $49,500 Marshall Machine Shop 5.1 Y Y Y $175,150 $29,500 Northern Lights Steel Fabrication 5.1 Y Y Y $154,270 $39,800 Thornberg Steel 5.1 Y Y Y $153,000 $26,000 Base Bid Amount Addenda Noted (Y / N) Bid Bond (Y / N) On Bid Form (Y / N) Scope of Work Prime Contractor Sorted Alphabetically