Loading...
HomeMy WebLinkAbout8603 197th Street West-SURVEYZoning = RS-3 ENGINEERING REVIEWED Date:__________________10/29/2020 corlowsky *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required.