HomeMy WebLinkAbout8603 197th Street West-SURVEYZoning = RS-3
ENGINEERING REVIEWED
Date:__________________10/29/2020 corlowsky
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.