Loading...
HomeMy WebLinkAboutLA184050 Revised Floor Structure Plan09-06-00 B1 B2 0 1 Total Horizontal Product Length = 09-06-00 Page 1 of 2 Double 1-3/4"x 9-1/2"VERSA-LAM®2.0 3100 SP B2 (Floor Beam) BC CALC®Member Report Dry |1 span |No cant.December 1,2020 09:52:39 Build 7787 Job name:Plan 3030-B File name: Address:7738 206th Description: City,State,Zip:Lakeville,MN Specifier:Job Site Builder:D R Horton Designer:Anthony Estevez Code reports:ESR-1040 Company:Boise Cascade Page 1 of 2 Reaction Summary (Down /Uplift)(lbs)Bearing Live Dead Snow Wind Roof Live B1,3"1900 /0 521 /0 B2,3"1900 /0 521 /0 Load Summary Live Dead Snow Wind Roof Live Tributary Tag Description Load Type Ref.Start End Loc.100%90%115%160%125% 0 Self-Weight Unf.Lin.(lb/ft)L 00-00-00 09-06-00 Top 10 00-00-00 1 Standard Load Unf.Area (lb/ft²)L 00-00-00 09-06-00 Top 40 10 10-00-00 Controls Summary Value %Allowable Duration Case Location Pos.Moment 5304 ft-lbs 38.0%100%1 04-09-00 End Shear 1890 lbs 29.9%100%1 01-00-08 Total Load Deflection L/689 (0.159")34.8%n\a 1 04-09-00 Live Load Deflection L/999 (0.125")n\a n\a 2 04-09-00 Max Defl.0.159"15.9%n\a 1 04-09-00 Span /Depth 11.5 Bearing Supports Dim.(LxW)Value %Allow Support %Allow Member Material B1 Wall/Plate 3"x 3-1/2"2421 lbs n\a 30.7%Unspecified B2 Wall/Plate 3"x 3-1/2"2421 lbs n\a 30.7%Unspecified Notes Design meets Code minimum (L/240)Total load deflection criteria. Design meets Code minimum (L/360)Live load deflection criteria. Design meets arbitrary (1")Maximum Total load deflection criteria. BC CALC®analysis is based on IBC 2009. Design based on Dry Service Condition. Calculations assume member is fully braced. Connection Diagram:Full Length of Member DisclosureUseoftheBoiseCascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy,prior to anyone relying on such output as evidence of suitability for a particular application.The output here is based on building code-accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide or ask questions,please call (800)232-0788 before installation. BC CALC®,BC FRAMER®,AJS™, ALLJOIST®,BC RIM BOARD™,BCI®, BOISE GLULAM™,BC FloorValue®, VERSA-LAM®,VERSA-RIM PLUS®, Page 2 of 2 Double 1-3/4"x 9-1/2"VERSA-LAM®2.0 3100 SP B2 (Floor Beam) BC CALC®Member Report Dry |1 span |No cant.December 1,2020 09:52:39 Build 7787 Job name:Plan 3030-B File name: Address:7738 206th Description: City,State,Zip:Lakeville,MN Specifier:Job Site Builder:D R Horton Designer:Anthony Estevez Code reports:ESR-1040 Company:Boise Cascade Page 2 of 2 Connection Diagram:Full Length of Member a minimum =2"c =5-1/2" b minimum =3"d =24" Connectors are:3-1/4 in.Pneumatic Gun Nails 15-00-00 B1 B2 0 1 Total Horizontal Product Length = 15-00-00 Page 1 of 2 Double 1-3/4"x 11-7/8"VERSA-LAM®2.0 3100 SP B4 (Floor Beam) BC CALC®Member Report Dry |1 span |No cant.December 1,2020 09:53:39 Build 7787 Job name:Plan 3030-B File name: Address:7738 206th Description: City,State,Zip:Lakeville,MN Specifier:Job Site Builder:D R Horton Designer:Anthony Estevez Code reports:ESR-1040 Company:Boise Cascade Page 1 of 2 Reaction Summary (Down /Uplift)(lbs)Bearing Live Dead Snow Wind Roof Live B1,3"3000 /0 840 /0 B2,3"3000 /0 840 /0 Load Summary Live Dead Snow Wind Roof Live Tributary Tag Description Load Type Ref.Start End Loc.100%90%115%160%125% 0 Self-Weight Unf.Lin.(lb/ft)L 00-00-00 15-00-00 Top 12 00-00-00 1 Standard Load Unf.Area (lb/ft²)L 00-00-00 15-00-00 Top 40 10 10-00-00 Controls Summary Value %Allowable Duration Case Location Pos.Moment 13690 ft-lbs 64.3%100%1 07-06-00 End Shear 3206 lbs 40.6%100%1 01-02-14 Total Load Deflection L/325 (0.54")73.8%n\a 1 07-06-00 Live Load Deflection L/416 (0.422")86.5%n\a 2 07-06-00 Max Defl.0.54"54.0%n\a 1 07-06-00 Span /Depth 14.8 Bearing Supports Dim.(LxW)Value %Allow Support %Allow Member Material B1 Wall/Plate 3"x 3-1/2"3840 lbs n\a 48.8%Unspecified B2 Wall/Plate 3"x 3-1/2"3840 lbs n\a 48.8%Unspecified Notes Design meets Code minimum (L/240)Total load deflection criteria. Design meets Code minimum (L/360)Live load deflection criteria. Design meets arbitrary (1")Maximum Total load deflection criteria. BC CALC®analysis is based on IBC 2009. Design based on Dry Service Condition. Calculations assume member is fully braced. Connection Diagram:Full Length of Member DisclosureUseoftheBoiseCascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy,prior to anyone relying on such output as evidence of suitability for a particular application.The output here is based on building code-accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide or ask questions,please call (800)232-0788 before installation. BC CALC®,BC FRAMER®,AJS™, ALLJOIST®,BC RIM BOARD™,BCI®, BOISE GLULAM™,BC FloorValue®, VERSA-LAM®,VERSA-RIM PLUS®, Page 2 of 2 Double 1-3/4"x 11-7/8"VERSA-LAM®2.0 3100 SP B4 (Floor Beam) BC CALC®Member Report Dry |1 span |No cant.December 1,2020 09:53:39 Build 7787 Job name:Plan 3030-B File name: Address:7738 206th Description: City,State,Zip:Lakeville,MN Specifier:Job Site Builder:D R Horton Designer:Anthony Estevez Code reports:ESR-1040 Company:Boise Cascade Page 2 of 2 Connection Diagram:Full Length of Member a minimum =2"c =7-7/8" b minimum =3"d =24" Connectors are:3-1/4 in.Pneumatic Gun Nails