Loading...
HomeMy WebLinkAboutLA186533 19946 Hamburg Ave Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400  952-985-4499 fax www.lakevillemn.gov Sewer & Water Tie Card Address:________________________________________ Contractor:______________________________________ Permit Number:__________________________________ Final Date:________________ Street Drain-Tile:______ Size of Water Service: 1” Comments: AIRTEST SANITARY OVER 20’/2 FITTINGS THIS CARD MUST BE COMPLETED AND ON-SITE AT TIME OF SEWER & WATER INSPECTION Concept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode11/18/2020dmathews Interior BWP AboveInterior BWP AboveCOUFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel. -Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ). Stone Cottage HVAC Load Calculations for Stone Cottage 19946 Hamburg Ave Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Monday, September 28, 2020 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Stone Cottage Project Date:Monday, September 28, 2020 Client Name:Stone Cottage Client Address:19946 Hamburg Ave Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces West Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:1,134 CFM Per Square ft.:0.309 Square ft. of Room Area:3,664 Square ft. Per Ton:1,338 Volume (ft³) of Cond. Space:32,976 Building Loads Total Heating Required Including Ventilation Air:50,082 Btuh 50.082 MBH Total Sensible Gain:24,639 Btuh 83 % Total Latent Gain:4,942 Btuh 17 % Total Cooling Required Including Ventilation Air:29,581 Btuh 2.47 Tons (Based On Sensible + Latent) 2.74 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19946 HAMBURG LAKEVILLE RAMBLER 09282020.rhv Monday, September 28, 2020, 10:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 3 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.47 1,486 3,664 24,639 4,942 29,581 50,082 921 1,134 1,134 System 1 Yes 2.47 1,486 3,664 24,639 4,942 29,581 50,082 921 1,134 1,134 21x10 Ventilation 437 1,352 1,789 5,850 Zone 1 3,664 24,202 3,590 27,792 44,232 921 1,134 1,134 21x10 1-Upper Level 1,832 22,742 2,690 25,432 32,037 667 1,065 1,065 13--6 2-Lower Level 1,832 1,460 900 2,360 12,195 254 68 68 1--6 C:\ ...\19946 HAMBURG LAKEVILLE RAMBLER 09282020.rhv Monday, September 28, 2020, 10:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 4 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 475 13,224 0 12,766 12,766 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 1409 7,968 0 1,219 1,219 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1926 8,210 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1832 3,188 0 1,759 1,759 21A-24-c: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, carpet covering, shortest side of floor slab is 24' wide 1832 3,985 0 0 0 Subtotals for structure:37,853 0 16,096 16,096 People:7 1,400 1,610 3,010 Equipment:1,500 6,000 7,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 69, Summer CFM: 36 6,379 690 496 1,186 Ventilation: Winter CFM: 140, Summer CFM: 70 5,850 1,352 437 1,789 Total Building Load Totals:50,082 4,942 24,639 29,581 Check Figures Total Building Supply CFM:1,134 CFM Per Square ft.:0.309 Square ft. of Room Area:3,664 Square ft. Per Ton:1,338 Volume (ft³) of Cond. Space:32,976 Building Loads Total Heating Required Including Ventilation Air:50,082 Btuh 50.082 MBH Total Sensible Gain:24,639 Btuh 83 % Total Latent Gain:4,942 Btuh 17 % Total Cooling Required Including Ventilation Air:29,581 Btuh 2.47 Tons (Based On Sensible + Latent) 2.74 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19946 HAMBURG LAKEVILLE RAMBLER 09282020.rhv Monday, September 28, 2020, 10:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 5 Building Pie Chart Building Loss 50,082 Btuh Floor 8% Roof 6% Wall 32% Glass 26% Door 3% Infiltration 13% Ventilation 12% Building Gain 29,581 Btuh Roof 6% Wall 4% Glass 43% Door 1% People 10% Equipment 25% Infiltration 4% Ventilation 6% C:\ ...\19946 HAMBURG LAKEVILLE RAMBLER 09282020.rhv Monday, September 28, 2020, 10:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 6 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 475 13,224 0 12,766 12,766 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 1409 7,968 0 1,219 1,219 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1926 8,210 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1832 3,188 0 1,759 1,759 21A-24-c: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, carpet covering, shortest side of floor slab is 24' wide 1832 3,985 0 0 0 Subtotals for structure:37,853 0 16,096 16,096 People:7 1,400 1,610 3,010 Equipment:1,500 6,000 7,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 69, Summer CFM: 36 6,379 690 496 1,186 Ventilation: Winter CFM: 140, Summer CFM: 70 5,850 1,352 437 1,789 System 1 Whole House Load Totals:50,082 4,942 24,639 29,581 Check Figures Supply CFM:1,134 CFM Per Square ft.:0.309 Square ft. of Room Area:3,664 Square ft. Per Ton:1,338 Volume (ft³) of Cond. Space:32,976 System Loads Total Heating Required Including Ventilation Air:50,082 Btuh 50.082 MBH Total Sensible Gain:24,639 Btuh 83 % Total Latent Gain:4,942 Btuh 17 % Total Cooling Required Including Ventilation Air:29,581 Btuh 2.47 Tons (Based On Sensible + Latent) 2.74 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19946 HAMBURG LAKEVILLE RAMBLER 09282020.rhv Monday, September 28, 2020, 10:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 7 Detailed Room Loads - Room 1 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,832.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,832.0 sq.ft.Supply Air:1,065 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.9 AC/hr Volume:16,488.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:13 Actual Winter Vent.:101 CFM Runout Air:82 CFM Percent of Supply.:10 % Runout Duct Size:6 in.Actual Summer Vent.:66 CFM Runout Air Velocity:417 ft./min.Percent of Supply:6 % Runout Air Velocity:417 ft./min.Actual Winter Infil.:69 CFM Actual Loss:0.109 in.wg./100 ft.Actual Summer Infil.:36 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-12F-0sw 49 X 9 347 0.065 5.7 1,962 0.9 0 300 S -Wall-12F-0sw 49 X 9 343 0.065 5.7 1,940 0.9 0 297 E -Wall-12F-0sw 58 X 9 334 0.065 5.7 1,889 0.9 0 289 W -Wall-12F-0sw 58 X 9 385 0.065 5.7 2,177 0.9 0 333 W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 N -Gls-4A-1a-o shgc-0.33 100%S 94 0.320 27.8 2,617 10.4 0 979 S -Gls-4A-1a-o shgc-0.33 0%S 98 0.320 27.8 2,728 19.2 0 1,880 E -Gls-4A-1a-o shgc-0.33 0%S 188 0.320 27.8 5,234 35.0 0 6,581 W -Gls-4A-1a-o shgc-0.33 0%S 95 0.320 27.8 2,645 35.0 0 3,326 UP-Ceil-16B-50 1832 X 1 1832 0.020 1.7 3,188 1.0 0 1,759 Subtotals for Structure:25,658 0 16,096 Infil.: Win.: 68.7, Sum.: 35.7 1,926 3.312 6,379 0.258 690 496 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 5,000 Room Totals:32,037 2,690 22,742 C:\ ...\19946 HAMBURG LAKEVILLE RAMBLER 09282020.rhv Monday, September 28, 2020, 10:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 8 Detailed Room Loads - Room 2 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,832.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,832.0 sq.ft.Supply Air:68 CFM Ceiling Height:9.0 ft.Supply Air Changes:0.2 AC/hr Volume:16,488.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:1 Actual Winter Vent.:39 CFM Runout Air:68 CFM Percent of Supply.:56 % Runout Duct Size:6 in.Actual Summer Vent.:4 CFM Runout Air Velocity:348 ft./min.Percent of Supply:6 % Runout Air Velocity:348 ft./min.Actual Winter Infil.:0 CFM Actual Loss:0.077 in.wg./100 ft.Actual Summer Infil.:0 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-15B0-10sf-10 49 X 9 441 0.049 4.3 1,880 0.0 0 0 S -Wall-15B0-10sf-10 49 X 9 441 0.049 4.3 1,880 0.0 0 0 E -Wall-15B0-10sf-10 58 X 9 522 0.049 4.3 2,225 0.0 0 0 W -Wall-15B0-10sf-10 58 X 9 522 0.049 4.3 2,225 0.0 0 0 Floor-21A-24 1 X 1832 1832 0.025 2.2 3,985 0.0 0 0 Subtotals for Structure:12,195 0 0 Infil.: Win.: 0.0, Sum.: 0.0 0 0 0 0 0 0 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:500 1,000 Room Totals:12,195 900 1,460 C:\ ...\19946 HAMBURG LAKEVILLE RAMBLER 09282020.rhv Monday, September 28, 2020, 10:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 9 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Upper Level 1,832 32,037 667 13-6 417 22,742 2,690 1,065 1,065 2 Lower Level 1,832 12,195 254 1-6 348 1,460 900 68 68 Ventilation 5,850 437 1,352 System 1 total 3,664 50,082 921 24,639 4,942 1,134 1,134 System 1 Main Trunk Size:21x10 in. Velocity:777 ft./min Loss per 100 ft.:0.089 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.47 83% / 17%24,639 4,942 29,581 Recommended:2.74 75% / 25%24,639 8,213 32,852 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\19946 HAMBURG LAKEVILLE RAMBLER 09282020.rhv Monday, September 28, 2020, 10:03 AM Builders Associaton of Minnesota version 101014 Date Certificate Posted x Passive (No Fan) Active (With fan and monometer or other system monitoring Location (or future location) of Fan: Other Please Describe Here x 10/15 x x x 20 x 20 x 21 x 49 x x x x x Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe:Input in BTUS: 70,000 Capacity in Gallons: Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code x Passive Low: Other, describe: x Low: Location of fan(s), describe: Cfm's 4" " round duct OR Flex " metal duct ML193UH070 Heating Loss Manufacturer Lennox Natural Gas Output in Tons: 3 Ton50 Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Capacity continuous ventilation rate in cfms: 200CFM Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): 24,639Residential Load Calculation SEER /EER Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Electric Make-up Air Select a Type AO Smith Domestic Water Heater MECHANICAL SYSTEMS Rating or Size Efficiency 13 Seer Building envelope air tightness: Rim Joist (1st Floor) GPVL-50 13ACXN042-230 Model Heating System Natrual Gas Lennox Fiberglass, Batts Foundation Wall R-value Average U-Factor (excludes skylights and one door ) U: Duct system air tightness: Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply Mineral Fiberboard Insulation Location Foam, Closed Cell0.22 Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade RADON CONTROL SYSTEM Non or Not ApplicableAttic Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Rim Joist (2nd Floor+) 0.30 Appliances Mech Room Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 50,082 Heating Gain Cooling Load Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Place your logo here New Construction Energy Code Compliance Certificate Name of Residential Contractor Stone Cottage Construction Inc. MN License Number LAKEVILLE19946 HAMBURG AVE BC636874 City Mailing Address of the Dwelling or Dwelling Unit Combustion Air Select a Type Location of duct or system: 29,581 Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 KP X11/13/2020