Loading...
HomeMy WebLinkAbout19946 Hamburg Ave SurveyZoning = RS-3 retaining wall cannot encroach on easement *Dr a i n t i l e c o n n e c t i o n r e q u i r e d . ENGINEERING REVIEWED Date:__________________11/30/2020 lvlasaty The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION