HomeMy WebLinkAbout18128 Hartlin Ave Surveyf:\jobs\7761 - 7780\7769 - avonlea 4th addition\cad c3d\survey\7769.092.dwgSave Date:08/18/20House Address:
Certificate of Survey for:
M/I HOMES OF MINNEAPOLIS, LLC
18128 Hartlin Avenue, Lakeville, MN
House Model:
Dearborn (B)
Revisions:
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________11/06/2020 lvlasaty
The curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
Planning DepartmentApprovedDate:__________________11/06/2020 mcroatt