Loading...
HomeMy WebLinkAbout20659 Gosford Way SurveyPHONE: 952.890.6044 www.jrhinc.com PLANNERS / ENGINEERS / SURVEYORSDRAWN BYDATEREVISIONSCAD FILEPROJECT NO.SHEET 1 OF 12999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306 CERTIFICATE OF SURVEY FOR SHP10/28/2020401369.dwg401369Lot 9, Block 3, CEDAR CROSSINGS 2ND ADDITION, Dakota County, Minnesota 1. Bearings are based on the recorded plat.2. Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3. No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4. No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5. Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6. Grading plan date/revision date: July 13, 20187. Plan No. 3030-C 'CAMERON'NOTESLot = 11,854 sq. ft.House/Garage = 2,469 sq. ft.Porch = 114 sq. ft.Driveway = 691 sq. ft.Sidewalk = 71 sq. ft.Patio = 18 sq. ft.Total Impervious = 3,363 sq. ft. or 28.37% of lotHARD COVER CALCULATIONSProposedGarage Floor @ Front = 989.1Garage Top of Foundation = 989.5House Top of Foundation = 989.5Lowest Floor = 986.3Lot 9, Block 3, CEDAR CROSSINGS 2ND ADDITION, Dakota County, MinnesotaPROPERTY DESCRIPTION20659 Gosford Way, Lakeville, MinnesotaPROPERTY ADDRESSI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 28th day of October, 2020Marcus F. Hampton, MN L.S. No. 47481SURVEYOR'S CERTIFICATEFLOOR ELEVATIONSTop nut of hydrant located at Lots 26 and 27, Block 2 = 983.65BENCHMARKDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes found scribed "x"Denotes set hubDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationZoning = RST-2FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'*Draint i le connec t ion requ i red .ENGINEERING REVIEWEDDate:__________________11/23/2020lvlasatyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.