Loading...
HomeMy WebLinkAboutLA178536 ,,�''_ �.- � �.-� �� � �� �3� � ,�) �I � �..�: . . Manufactured Home Svstems Test Affidavit This form must be completed in its entirety and be submitted at the Building Final inspection for the instailation af a manufactured home. A!i tests must be completed and signed off an this farm. A certificate of occupancy wiil not be issued until this completed form is received. , SYSTEMS TEST VERIFICQTION Description Date Passed Signature of Tester Drain Line: Pursuant to CFR 3280.612(b) Date: ���-- � ' � a l�� Print Name ofi Tester and Company: ,��-��, Q� , � � _ �� WatBP Llil@: Pursu2nt to CFR 3280.612(a) Date: L ��— � Print Name of Tester and Company: Fixture Test: Pursuant to CFR 3280.612(c) Date:L!��'� 2/ Print Name of 7ester and Gompany: ��/�'�"� GaS TeSt: Pursuant to CFR 3280.705 and IFGC 406.4 Date: �,,m '3,,� , 1� � '`�, � Print Name of Tester and Company: F �� ���.y. �l t�,_ �� � � 1'l�.�S�f`�� �� �; �� � � �, ,,,`� Efectricai Operational: Pursuant to CFR 3285.702 Date:��cl_�r � Print Name of Tester and Campany: �-�—����,,1�4� y1.l��G�,� �C Elec#rical Polarity: Pu►suant to cFR s2s5.7o2 �ate: ���_� � Print Name of Tester and Gompany: , � �-( Electrical Continuity: Pursuar�to CFR 3285.702 Date: Lj�...C� _� Print Name of Tester and Company: c � r < � St110k@ AIaP111 T@St: Pursuant to CFR 3280.208 Date: .���,-�> Print Name of Tester and Company: _ I certify the above systems testing has been completed and was found to be in compliance with the provisions identified for each systems test ��� o �f—�� -- �-� Si nature: ate: f