HomeMy WebLinkAboutSurvey - 5218 175th St Wc Pioneer Engineering
Revisions:
1.) 11-24-20 Stake house
Certificate of Survey for:
2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914
www.pioneereng.comFax: (651) 681-9488
Project # :Folder #:Drawn by:
CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS
Brandl Anderson Homes Inc
221 River Ridge Circle South, Suite 100
Burnsville, MN 55337
Phone: (952) 898-0230
Planning DepartmentApprovedDate:__________________12/08/2020 kjenson
ENGINEERING REVIEWED
Date:__________________12/09/2020 lvlasaty
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
EROSION CONTROL MUST BE INSTALLED
BEFORE EXCAVATION