Loading...
HomeMy WebLinkAboutSurvey - 5218 175th St Wc Pioneer Engineering Revisions: 1.) 11-24-20 Stake house Certificate of Survey for: 2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914 www.pioneereng.comFax: (651) 681-9488 Project # :Folder #:Drawn by: CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS Brandl Anderson Homes Inc 221 River Ridge Circle South, Suite 100 Burnsville, MN 55337 Phone: (952) 898-0230 Planning DepartmentApprovedDate:__________________12/08/2020 kjenson ENGINEERING REVIEWED Date:__________________12/09/2020 lvlasaty The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION