Loading...
HomeMy WebLinkAbout17902 Hawksbill Drive-SURVEYZoning = RS-4 ENGINEERING REVIEWED Date:__________________12/23/2020 lvlasaty The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION