Loading...
HomeMy WebLinkAboutLA187187 - 19946 Harrisburg Way Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400  952-985-4499 fax www.lakevillemn.gov Sewer & Water Tie Card Address:________________________________________ Contractor:______________________________________ Permit Number:__________________________________ Final Date:________________ Street Drain-Tile:______ Size of Water Service: 1” Comments: AIRTEST SANITARY OVER 20’/2 FITTINGS THIS CARD MUST BE COMPLETED AND ON-SITE AT TIME OF SEWER & WATER INSPECTION Secure door closed until deck isconstructed with a separate permit.Concept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode12/30/2020dmathews BWPsAbove(2)11-7/8" LSL soas deep as beamhanging on it.UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.SmokeCOSmoke BWPsAboveVerify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.FC-Perp=805, verifyadequate for trussbearing requirement.CS-PFCS-PFCS-PFCS-PF Verify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ). Stone Cottage HVAC Load Calculations for Peterson 19946 Harrisburg Way Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Tuesday, November 24, 2020 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Stone Cottage Project Date:Tuesday, November 24, 2020 Client Name:Peterson Client Address:19946 Harrisburg Way Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces South Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:995 CFM Per Square ft.:0.275 Square ft. of Room Area:3,612 Square ft. Per Ton:1,507 Volume (ft³) of Cond. Space:31,194 Building Loads Total Heating Required Including Ventilation Air:51,512 Btuh 51.512 MBH Total Sensible Gain:21,574 Btuh 78 % Total Latent Gain:6,238 Btuh 22 % Total Cooling Required Including Ventilation Air:27,812 Btuh 2.32 Tons (Based On Sensible + Latent) 2.40 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19946 HARRISBURG LAKEVILLE 11242020.rhv Tuesday, November 24, 2020, 2:10 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 3 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.32 1,558 3,612 21,574 6,238 27,812 51,512 978 995 995 System 1 Yes 2.32 1,558 3,612 21,574 6,238 27,812 51,512 978 995 995 18x10 Ventilation 340 1,352 1,692 4,550 Zone 1 3,612 21,234 4,886 26,120 46,962 978 995 995 18x10 1-Main Level 1,149 9,049 1,852 10,901 17,566 366 424 424 5--6 2-Upper Level 1,314 9,622 2,416 12,038 17,143 357 451 451 5--6 3-Lower Level 1,149 2,563 618 3,181 12,253 255 120 120 1--6 C:\ ...\19946 HARRISBURG LAKEVILLE 11242020.rhv Tuesday, November 24, 2020, 2:10 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 4 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.27, SHGC 0.3 375 8,811 0 6,591 6,591 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 119 3,313 0 1,239 1,239 11N: Door-Metal - Polystyrene Core 63 1,644 0 453 453 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2743 15,512 0 2,371 2,371 15B0-15sf-10: Wall-Basement, , R-15 board insulation to floor, no interior finish, 10' floor depth 1116 4,077 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1314 2,286 0 1,261 1,261 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1013 2,203 0 0 0 Subtotals for structure:37,846 0 11,915 11,915 People:7 1,400 1,610 3,010 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 98, Summer CFM: 51 9,116 986 709 1,695 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 Total Building Load Totals:51,512 6,238 21,574 27,812 Check Figures Total Building Supply CFM:995 CFM Per Square ft.:0.275 Square ft. of Room Area:3,612 Square ft. Per Ton:1,507 Volume (ft³) of Cond. Space:31,194 Building Loads Total Heating Required Including Ventilation Air:51,512 Btuh 51.512 MBH Total Sensible Gain:21,574 Btuh 78 % Total Latent Gain:6,238 Btuh 22 % Total Cooling Required Including Ventilation Air:27,812 Btuh 2.32 Tons (Based On Sensible + Latent) 2.40 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19946 HARRISBURG LAKEVILLE 11242020.rhv Tuesday, November 24, 2020, 2:10 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 5 Building Pie Chart Building Loss 51,512 Btuh Floor 4%Roof 4% Wall 38% Glass 24% Door 3% Infiltration 18% Ventilation 9% Building Gain 27,812 Btuh Roof 5% Wall 9% Glass 28% Door 2% People 11% Equipment 34% Infiltration 6% Ventilation 6% C:\ ...\19946 HARRISBURG LAKEVILLE 11242020.rhv Tuesday, November 24, 2020, 2:10 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 6 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.27, SHGC 0.3 375 8,811 0 6,591 6,591 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 119 3,313 0 1,239 1,239 11N: Door-Metal - Polystyrene Core 63 1,644 0 453 453 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2743 15,512 0 2,371 2,371 15B0-15sf-10: Wall-Basement, , R-15 board insulation to floor, no interior finish, 10' floor depth 1116 4,077 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1314 2,286 0 1,261 1,261 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1013 2,203 0 0 0 Subtotals for structure:37,846 0 11,915 11,915 People:7 1,400 1,610 3,010 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 98, Summer CFM: 51 9,116 986 709 1,695 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 System 1 Whole House Load Totals:51,512 6,238 21,574 27,812 Check Figures Supply CFM:995 CFM Per Square ft.:0.275 Square ft. of Room Area:3,612 Square ft. Per Ton:1,507 Volume (ft³) of Cond. Space:31,194 System Loads Total Heating Required Including Ventilation Air:51,512 Btuh 51.512 MBH Total Sensible Gain:21,574 Btuh 78 % Total Latent Gain:6,238 Btuh 22 % Total Cooling Required Including Ventilation Air:27,812 Btuh 2.32 Tons (Based On Sensible + Latent) 2.40 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19946 HARRISBURG LAKEVILLE 11242020.rhv Tuesday, November 24, 2020, 2:10 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 7 Detailed Room Loads - Room 1 - Main Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,149.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,149.0 sq.ft.Supply Air:424 CFM Ceiling Height:9.0 ft.Supply Air Changes:2.5 AC/hr Volume:10,341.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:5 Actual Winter Vent.:52 CFM Runout Air:85 CFM Percent of Supply.:12 % Runout Duct Size:6 in.Actual Summer Vent.:30 CFM Runout Air Velocity:432 ft./min.Percent of Supply:7 % Runout Air Velocity:432 ft./min.Actual Winter Infil.:45 CFM Actual Loss:0.117 in.wg./100 ft.Actual Summer Infil.:23 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-12F-0sw 44 X 9 309 0.065 5.7 1,747 0.9 0 267 S -Wall-12F-0sw 44 X 9 291 0.065 5.7 1,646 0.9 0 252 E -Wall-12F-0sw 40 X 9 340 0.065 5.7 1,923 0.9 0 294 W -Wall-12F-0sw 40 X 9 310 0.065 5.7 1,753 0.9 0 268 S -Door-11N 6 X 7 42 0.300 26.1 1,096 7.2 0 302 S -Door-11N 3 X 7 21 0.300 26.1 548 7.2 0 151 N -Gls-4A-1a-o shgc-0.3 100%S 87 0.270 23.5 2,044 9.2 0 800 S -Gls-4A-1a-o shgc-0.3 0%S 42 0.270 23.5 987 17.2 0 721 E -Gls-4A-1a-o shgc-0.3 0%S 20 0.270 23.5 470 31.6 0 631 W -Gls-4A-1a-o shgc-0.3 0%S 50 0.270 23.5 1,175 31.6 0 1,578 Subtotals for Structure:13,389 0 5,264 Infil.: Win.: 45.0, Sum.: 23.4 1,512 2.763 4,177 0.215 452 325 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:1,000 3,000 Room Totals:17,566 1,852 9,049 C:\ ...\19946 HARRISBURG LAKEVILLE 11242020.rhv Tuesday, November 24, 2020, 2:10 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 8 Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,314.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,314.0 sq.ft.Supply Air:451 CFM Ceiling Height:8.0 ft.Supply Air Changes:2.6 AC/hr Volume:10,512.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:5 Actual Winter Vent.:51 CFM Runout Air:90 CFM Percent of Supply.:11 % Runout Duct Size:6 in.Actual Summer Vent.:32 CFM Runout Air Velocity:459 ft./min.Percent of Supply:7 % Runout Air Velocity:459 ft./min.Actual Winter Infil.:41 CFM Actual Loss:0.132 in.wg./100 ft.Actual Summer Infil.:22 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-12F-0sw 44 X 8 267 0.065 5.7 1,510 0.9 0 231 S -Wall-12F-0sw 44 X 8 297 0.065 5.7 1,680 0.9 0 257 E -Wall-12F-0sw 43 X 8 314 0.065 5.7 1,776 0.9 0 271 W -Wall-12F-0sw 43 X 8 338 0.065 5.7 1,911 0.9 0 292 N -Gls-4A-1a-o shgc-0.3 100%S 85 0.270 23.5 1,997 9.2 0 781 S -Gls-4A-1a-o shgc-0.3 0%S 55 0.270 23.5 1,292 17.2 0 944 E -Gls-4A-1a-o shgc-0.3 0%S 30 0.270 23.5 705 31.6 0 947 W -Gls-4A-1a-o shgc-0.3 0%S 6 0.270 23.5 141 31.5 0 189 UP-Ceil-16B-50 1314 X 1 1314 0.020 1.7 2,286 1.0 0 1,261 Subtotals for Structure:13,298 0 5,173 Infil.: Win.: 41.4, Sum.: 21.5 1,392 2.762 3,845 0.215 416 299 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 3,000 Room Totals:17,143 2,416 9,622 C:\ ...\19946 HARRISBURG LAKEVILLE 11242020.rhv Tuesday, November 24, 2020, 2:10 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 9 Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,149.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,149.0 sq.ft.Supply Air:120 CFM Ceiling Height:9.0 ft.Supply Air Changes:0.7 AC/hr Volume:10,341.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:1 Actual Winter Vent.:37 CFM Runout Air:120 CFM Percent of Supply.:30 % Runout Duct Size:6 in.Actual Summer Vent.:8 CFM Runout Air Velocity:612 ft./min.Percent of Supply:7 % Runout Air Velocity:612 ft./min.Actual Winter Infil.:12 CFM Actual Loss:0.232 in.wg./100 ft.Actual Summer Infil.:6 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-12F-0sw 44 X 9 277 0.065 5.7 1,566 0.9 0 239 S -Wall-15B0-15sf-10 44 X 9 396 0.042 3.7 1,447 0.0 0 0 E -Wall-15B0-15sf-10 40 X 9 360 0.042 3.7 1,315 0.0 0 0 W -Wall-15B0-15sf-10 40 X 9 360 0.042 3.7 1,315 0.0 0 0 N -Gls-4A-1a-o shgc-0.33 100%S 119 0.320 27.8 3,313 10.4 0 1,239 Floor-21A-24 1 X 1013 1013 0.025 2.2 2,203 0.0 0 0 Subtotals for Structure:11,159 0 1,478 Infil.: Win.: 11.8, Sum.: 6.1 396 2.763 1,094 0.215 118 85 Equipment:500 1,000 Room Totals:12,253 618 2,563 C:\ ...\19946 HARRISBURG LAKEVILLE 11242020.rhv Tuesday, November 24, 2020, 2:10 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 10 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Main Level 1,149 17,566 366 5-6 432 9,049 1,852 424 424 2 Upper Level 1,314 17,143 357 5-6 459 9,622 2,416 451 451 3 Lower Level 1,149 12,253 255 1-6 612 2,563 618 120 120 Ventilation 4,550 340 1,352 System 1 total 3,612 51,512 978 21,574 6,238 995 995 System 1 Main Trunk Size:18x10 in. Velocity:796 ft./min Loss per 100 ft.:0.100 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.32 78% / 22%21,574 6,238 27,812 Recommended:2.40 75% / 25%21,574 7,191 28,765 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\19946 HARRISBURG LAKEVILLE 11242020.rhv Tuesday, November 24, 2020, 2:10 PM Builders Associaton of Minnesota version 101014 Date Certificate Posted x Passive (No Fan) Active (With fan and monometer or other system monitoring Location (or future location) of Fan: Other Please Describe Here x 10/15 x x x 20 x 20 x 21 x 49 x x x x x Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe:Input in BTUS: 70,000 Capacity in Gallons: Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code x Passive Low: Other, describe: x Low: Location of fan(s), describe: Cfm's 4" " round duct OR Flex " metal duct ML193UH070 Heating Loss Manufacturer Lennox Natural Gas Output in Tons: 3 Ton50 Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Capacity continuous ventilation rate in cfms: 200CFM Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): 21,574Residential Load Calculation SEER /EER Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Electric Make-up Air Select a Type AO Smith Domestic Water Heater MECHANICAL SYSTEMS Rating or Size Efficiency 13 Seer Building envelope air tightness: Rim Joist (1st Floor) GPVL-50 13ACXN042-230 Model Heating System Natrual Gas Lennox Fiberglass, Batts Foundation Wall R-value Average U-Factor (excludes skylights and one door ) U: Duct system air tightness: Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply Mineral Fiberboard Insulation Location Foam, Closed Cell0.22 Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade RADON CONTROL SYSTEM Non or Not ApplicableAttic Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Rim Joist (2nd Floor+) 0.30 Appliances Mech Room Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 51,512 Heating Gain Cooling Load Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Place your logo here New Construction Energy Code Compliance Certificate Name of Residential Contractor Stone Cottage Construction Inc. MN License Number Lakeville19946 Harrisburg Way BC636874 City Mailing Address of the Dwelling or Dwelling Unit Combustion Air Select a Type Location of duct or system: 27,812 Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 12/21/2020 KP X