Loading...
HomeMy WebLinkAbout18013 Harlow Path Surveyf:\jobs\7761 - 7780\7769 - avonlea 4th addition\cad c3d\survey\7769.104.dwgSave Date:10/15/20House Address: Certificate of Survey for: M/I HOMES OF MINNEAPOLIS, LLC 18013 Harlow Path, Lakeville, MN House Model: Canton (C) Revisions: Planning DepartmentApprovedDate:__________________01/27/2021 dmorey *Draintile connection required. ENGINEERING REVIEWED Date:__________________01/27/2021 lvlasaty The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION