Loading...
HomeMy WebLinkAbout19125 Indora Trail-SurveyRevisions:1.) 12-01-20 Stake houseCertificate of Survey for: Lennar Corporation 16305 36th Ave N Ste #600 Plymouth, MN 55446-4270 Phone: (952) 249-3000 / Fax: (952) 404-1909 c Pioneer Engineering 2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914 www.pioneereng.comFax: (651) 681-9488 Project # :Folder #:Drawn by: CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS Zoning = RM-1FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 50'RY Buffer - 50'*Draintile connection required.ENGINEERING REVIEWEDDate:__________________01/22/2021lvlasatyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.