HomeMy WebLinkAbout8141 198th St SurveyZoning = RS-3
*Draintile c
o
n
n
e
c
t
i
o
n
r
e
q
ui
r
e
d
.
ENGINEERING REVIEWED
Date:__________________01/29/2021 lvlasaty
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.