Loading...
HomeMy WebLinkAbout8141 198th St SurveyZoning = RS-3 *Draintile c o n n e c t i o n r e q ui r e d . ENGINEERING REVIEWED Date:__________________01/29/2021 lvlasaty The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements.