Loading...
HomeMy WebLinkAbout9942 189th Street West-SURVEYZoning = RS-3 *Draintile connection required. ENGINEERING REVIEWED Date:__________________01/27/2021 lvlasaty The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION