HomeMy WebLinkAbout9942 189th Street West-SURVEYZoning = RS-3
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________01/27/2021 lvlasaty
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the
landscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION