Loading...
HomeMy WebLinkAbout17914 Hawksbill Drive-SURVEYThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. ENGINEERING REVIEWED Date:__________________12/11/2020 lvlasaty EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. Zoning = RS-4