HomeMy WebLinkAbout17918 Hawksbill Drive-SURVEYZoning = RS-4
*Draintile connection required.
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
ENGINEERING REVIEWED
Date:__________________12/04/2020 lvlasaty
EROSION CONTROL MUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.