Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LA188287 - 19056 Iden Ave Permit Pack
RESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov1" Water Meter RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400 952-985-4499 fax www.lakevillemn.gov Sewer & Water Tie Card Address:________________________________________ Contractor:______________________________________ Permit Number:__________________________________ Final Date:________________ Street Drain-Tile:______ Size of Water Service: 1” Comments: AIRTEST SANITARY OVER 20’/2 FITTINGS THIS CARD MUST BE COMPLETED AND ON-SITE AT TIME OF SEWER & WATER INSPECTION 19056 Iden Avenue Summerlyn-8th AdditionVINYL SIDING ON SIDE AND REAR ELEVATIONS.HORIZONTAL LAP SIDINGHARDBOARD SIDING ON FRONT ELEVATION.FACE APPLIED STONE VENEERLP SHAKE SIDINGLP HORIZONTAL LAP SIDINGFACE APPLIED STONE VENEERSecure door closed until deck isconstructed with a separate permit.SIZING OF POTABLE WATERPIPING Total Fixture Units: 52.5 Total Length: 100 Ft Water Service Size: 1" Water Meter Size: 1" Water Heater Feed: 1" Building Supply To First Branch:1-1/4" Softener Inlet Size: 1-1/4 " UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.Interior BWP Above3.75 ····················BWPsAbovePFH555PFH5553.253.255Verify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing. ····················3.52.25-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ). Weyerhaeuser prepared these plans for the specification of Trus Joistproducts based on project information provided to us. This service is solelyintended for product application assurance; and, is not intended to circumventthe need for a design professional as determined by the building codes.The designer of record and/or builder/framer is responsible to assure thesedrawings are compatible with the overall project.Copyright 2009 Weyerhaeuser NR Company. All rights reserved.Anyunauthorized copying of reproduction will constitute an infringement of copyright.LENNAR - MNWASHBURN E/IALL ELEVATIONSR12-1521064014 EI D,ESheet1of 3Structural Framer'sPocket Guide.Access with your Smart Phone.http://woodbywy.com/document/tj-9001/Have a damaged joist or beam?File an electronic damage report forprompt service from your regionaltechnical office. Scan the QR Codewith your smartphone or go to:www.damagereport.woodbywy.comSpecification Teamservice.request@weyerhaeuser.com(888) 453-8358 . . . . . . . . www.woodbywy.comDrawn By:ALAN GOriginal Date:8/13/12Rev.ByDateJLH7-9-20CommentsUpdate layout for E/I plan changes.Architectural Drawings Prepared By:LENNAR - MNStructural Drawings Prepared By:N/A12/16/13N/ADrive nails at anangle to minimizesplitting of plateOne 10d (3") box nail eachside of member at bearing,112" minimum from endSee framing plan (if applicable)or iLevel® Framer's PocketGuide for minimum end andintermediate bearing lengths.TJI® JOIST NAILING REQUIREMENTS at BEARING134" minimum bearing atend support; 312" minimumat intermediate supportTJI® Joist to Bearing PlateShear transfer: Connections equivalent tofloor panel nailing scheduleOne 8d (212") boxnail each side.Drive nails at anangle at least 112"from end.Squash Blocks to TJI® Joist(Load bearing wall above)One 10d (3") box nailinto each flange10'-0" 11'-6"1'-0"1'-0"1'-0" 1'-0" 9'-0"9'-0"6'-0"3'-0"1'-0" 1'-0"1'-0"3601'-0"12'-0"17"13"15'-6"15'-6"SQUARE OR RECTANGULAR HOLE SIZEMinimum distance from edge of hole to inside face of nearest intermediate or cantilever support16'-0"15'-6"21'-0"20'-6"18'-0"17"17'-0"DO NOT cut, notch or drillholes in headers except asindicated in illustrationsand tables.For simple span (5' minimum), uniformly loaded joists used in residential applications, one maximum size round hole may be locatedat the center of the joist span provided no other holes occur in the joist.Distances are based on the maximum uniform loads shown in current Trus Joist® product guides. For other load conditions or holeconfigurations contact your Weyerhaeuser representative.15"8" 10"6"4"12"17"15"12"10"8"6"4"16'-0"15'-6"Holes may be located vertically anywhere within the web. Leave 18" of web (minimum) at top and bottom of hole.Knockouts are located in web at approximately 12" on-center; they do not affect hole placement.1'-0"1'-0"1'-0"1'-0"Rectangular holes based on measurement of longest side.18"20"1'-0"5605603603601'-0"1'-0"1'-0"1'-0" 1'-6"1'-0"2'-0"3'-0"3'-0"6'-0"6'-0"12'-0"5'-6"16'-6"11'-0"15'-0"10'-0"6'-0"9'-0"6'-0"3'-0"1'-6"4'-0"1'-0"1'-0"1'-0"1'-0"16'-6"18'-0"16'-6"14'-0"8'-6"7'-0"9'-0"11'-6" 16'-6"12'-6"14'-6"19'-6"17'-6'19'-0"20'-0"19'-6"10'-0"17"11'-0"13"10'-6"ROUND HOLE SIZETable B - Intermediate or Cantilever Support10'-6"9'-6"15'-0"13'-6"4'-0" 8'-0"2'-6"2303'-0"1'-0"1'-0"1'-0"1'-0"3'-0"3'-0"1'-0"1'-0"4'-0"1'-0"2'-0"1'-0"1'-0"1'-0"1'-0"1'-0"16"14"2305603601'-0"1'-0"1'-0"2305602103601'-0"1'-0"1'-0"1'-0"1178"1'-0"2303601102105602'-0"1'-0"1'-6"3602101103'-0"1'-0"1'-0"9'-0"5'-0"1'-0" 2'-6"1'-0"1'-0"1'-0"1'-6"2'-6"3'-0"1'-0"1'-0"1'-6"2'-0"1'-0"5'-6"5'-6"3'-0"11'-0"10'-0"4'-0"7'-0"6'-6"6'-6"10'-0"13'-6"12'-6"5'-6"9'-6"3'-0"8'-6"5'-6"2'-6" 5'-0"4'-0"1'-0"4'-6"7'-0"2'-0"8'-0"5'-6"2'-0"1'-6"4'-6"4'-0"9'-0"9'-6"11'-0"4'-6"12'-0"8'-0"9'-0"8'-0"6"3"1'-0"1'-0"1'-0"1'-0"1'-0"2'-6"2'-6"DEPTH912"TJI®2101102"2'-0"1'-6"18"20"1'-0"3605605603601'-0"1'-0"1'-0"5601'-0"4"4"3'-6"3'-0"612"7'-6"7'-6"878"11"1'-0" 2'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"8"10"1'-0"10'-0"5'-0"11'-0"5'-0"1'-0"2'-0"7'-0"7'-0"3'-0"12"6'-6"15"7'-6"3'-0"2'-6" 4'-6"4'-6"2'-0"1'-6"3'-6"2'-6"1'-0"1'-0"1'-0"3'-0"1'-0"1'-0"2'-0"4'-6"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"2'-0"1'-0"3'-0"3'-0"1'-0"1'-0"12'-6"6'-0"2'-0" 10'-0"10'-6"13'-6"12'-0"10'-6"14'-6"13'-0"1'-0"3'-6"2'-0"5'-0"9'-0"7'-6"1'-0"5'-0"4'-0"2'-6" 6'-0"4'-6"10'-0"9'-0"13'-0"16'-0"14'-6"13'-0"12'-6"15'-0"14'-0"9'-6"12'-0"11'-0"10'-0"10'-0"8'-0"3'-6"5'-0"1'-0"6'-0"9'-6"5'-0"10'-6"5'-6"3'-0"2'-6"8'-0"7'-6"6'-6"12'-0"9'-0"9'-0"1'-0"6"1'-6"1'-0"1'-0"3"1'-0"3'-0"2'-6"2'-0"1'-6"2"1'-0"1'-0"1'-0"1'-0"1'-0"4"4'-0"3'-6"4"612"7'-0"6'-6"11"878"10'-0"12'-0"11'-6"11'-0"10'-0"5'-0"6'-6"4'-0"2'-6"11'-0"9'-6"8'-0"1'-0"8"1'-6"10"13'-6"14'-6"14'-6"14'-0"12'-6'11'-0"15"12"13"11'-0"10'-6"SQUARE OR RECTANGULAR HOLE SIZE13"6'-0"6'-6"ROUND HOLE SIZEMinimum distance from edge of hole to inside face of nearest end support1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"2'-0"2'-0"1'-6"1'-6"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"56016"14"1'-0"3602102305601'-0"1'-0"1'-0"2102301101'-0"1'-0"1'-0"1178"912"1102303602101'-0"1'-0"1'-0"1'-0"1102303602101'-0"1'-0"1'-6"1'-0"8'-0"1'-6" 3'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0" 1'-0"1'-0"8'-0"5'-6"1'-6"2'-0"6'-0"3'-6"4'-0"9'-0"3'-0"3'-6"2'-6"6'-0"6'-6"5'-0"1'-0"1'-0"1'-6"1'-0"1'-0"2'-6"2'-0"1'-6"2'-0"2'-6"3'-0"2'-0"4'-0"3'-6"2'-6"3'-0"5'-0"6'-0"7'-0"5'-6"Table A - End Support3"DEPTH TJI®2" 4"878" 11"1'-6"2'-0"1'-0"2'-6"2'-0"1'-0"2'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-6"1'-0"5'-0"3'-6" 8'-0"2'-6"1'-0"1'-0"1'-0"1'-6"1'-0"1'-0"3'-6"1'-0"1'-0"1'-0"2'-0"2'-0"1'-6"9'-6"8'-0"9'-0"8'-0"10'-0"7'-0"6'-6"9'-0"9'-0"8'-6"8'-0"7'-0"6'-0"6'-6"1'-6"2'-6"2'-0"2'-0"2'-6"4'-0"3'-0"3'-0"3'-6"3'-0"2'-6"2'-6" 3'-6"5'-0"4'-6"4'-0"7'-6"7'-0"6'-6"6'-0"3"2" 4"11"878"Also see detail B2612"5'-0"5'-0"5'-6"6'-0"2'-6"3'-0"4'-6"2'-6"1'-0"1'-6"1'-0"2'-6"1'-0"1'-0"2'-6"5'-0"1'-0"1'-0"612"4'-6"5'-0"5'-0"5'-6"5'-0"5'-6"6'-6"4'-6"3'-6"4'-0"4'-0"6'-6"3'-0"2'-6"5'-6"7'-0"5'-0"4'-0"3'-0"3'-6"5'-0"2'-6"1'-6"2'-0"1'-0"3'-0"1'-0"1'-0"3'-0"5'-6"1'-0"1'-0"5'-6"5'-6"6'-6"4'-6"4'-0"4'-6"5'-0"7'-0"3'-6"3'-6"6'-6"7'-6"6'-0"5'-0"5"5"7"7"1'-0"1'-0"1'-0"5"4'-0"4'-6"2'-6"3'-0"6'-6"5'-6"1'-0"5'-6"3'-6"3'-6"3'-6"1'-0"2'-0"1'-0"1'-0"1'-0"1'-0"5'-0"7"4'-0"3'-0"2'-0"3'-6"4'-0"3'-6"1'-0"6'-6"6'-0"5'-6"7'-6"2'-6"8'-6"5'-0"7"5"5'-6"6'-6"3'-6"2'-6"5'-6"4'-0"4'-0"2'-0"7'-0"5'-6"5'-0"7'-0"2'-6"8'-0"7'-6"4'-6"4'-0"6'-0"8'-0"11'-0"6'-0"9'-6"8'-6"10'-0"11'-0"5'-6"7'-6"8'-6"10'-0"6'-0"7'-0"7'-0"5"1'-0"1'-0"1'-0"1'-0"7"1'-0"1'-0"1'-0"1'-0"5" 7"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"3'-0"4'-0"5"1'-0"1'-0"1'-0"1'-0"1'-6"1'-0"1'-0"1'-0"7"5"1'-0"1'-0"3'-6"1'-6" 6'-6"4'-0"6'-0"8'-6"7"1.3E TimberStrand® LSL allowed hole zoneddMicrollam® LVL andParallam® PSLallowed hole zonemiddle 13 span1.3E TimberStrand®LSL hole zoneMicrollam® LVLand Parallam®PSL hole zone2 x diameter of thelargest hole (minimum)d13 depth1"2"134"MAXIMUM ROUNDHOLE SIZEHEADER DEPTH438"714" to 20"512"See illustration for Allowed Hole ZoneOther Trus Joist® Trus Joist® Headers and Beams1.55E TimberStrand®LSL Headers and BeamsALLOWABLE HOLES - Headers and Beams13 depth2 x diameter of thelargest hole (minimum)2 x diameter of thelargest hole (minimum)Allowed hole zone8"8"See illustration for allowed hole zone1114"-11 78"14" to 16"914"-912"HEADER DEPTHMAXIMUM ROUNDHOLE SIZE358"458"3"No holes in headers or beams in plank orientation.Round holes onlyGeneral NotesGeneral NotesNo holes in headers or beams in plank orientation.Allowed hole zone suitable for uniformly loaded headers and beams only.Round holes onlyNo holes in cantilevers.BEAM ATTACHMENT at BEARINGThis sheet is intended as a supplement to the Trus Joist® Framer's Pocket Guide, which should be referenced for additional information.THINK SAFETY-READ INSTALLATION INFORMATION BEFORE PROCEEDINGAllowable Load400475Allowable load determined in accordance with AC 124.Corrosion-resistant fasteners required for wet-service applications.114" TimberStrand®LSL rim boardEXTERIOR DECK ATTACHMENTStructural exterior sheathingSee fastenertable below. Maintain2" distance (minimum) fromedge of ledger to fastener.8" diameter maximum hole for 1178" -16" deep blocking panels; 6" diametermaximum for TJI® blocking panels912" deep or shorter than 12" long.Do not cut flanges.GENERAL TRUS JOIST PRODUCT ASSEMBLY DETAILSE1E1WWeb stiffenersrequired eachside at E1WBacker block: Install tightto top flange (tight tobottom flange with facemount hangers). Attachwith ten 10d (3") boxnails, clinched whenpossible.H2Backer blockboth sides of webwith single TJI®joistFiller block: Attach with ten 10d (3") boxnails, clinched. Use ten 16d (312") boxnails from each side with 312" TJI® joistflange widths. Use fifteen nails withTJI® joist depths greater than 16".12" lag boltLA38" lag boltFastenerFlashingTreated 2x_ledger400N.A.118" Trus Joist®rim boardWeb stiffener each side.See sizes below.WTight fitWEB STIFFENER ATTACHMENTGap:18" minimum234" maximumThree 8d (212") box nails, clinched(Three 16d (312") box nails at 312"TJI® joist flange widths112"112"Load bearing or shear wall above(must stack over wall below)TJI® blockingpanelWeb stiffenersrequired each side atB1W and B2WB2B1B1WB2W116"2x4 minimumsquash blocksUse 2x4 minimum squash blocks totransfer load around TJI® joistCSLoad from above2x4 minimumsquash blocks116"With top flange hangers, backer block requiredonly for downward loads exceeding 250 lbs or foruplift conditions.NOTE: STUCTURAL DOCUMENTS FOR THIS PROJECT PER THE DESIGN PROFESSIONAL OF RECORD SHALLSUPERCEDE ALL ASSEMBLIES SHOWN IN THIS SECTION, ALSO REFER TO TRUS JOIST® PLACEMENT PLANS(AND MATERIAL SCHEDULES) FOR REQUIRED MATERIAL.Coordinate load requirements with the design professional of record.Lack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines:1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay.3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist.Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing.5. Ends of cantilevers require safety bracing on both the top and bottom flanges.6. The flanges must remain straight within 1/2" from true alignment.4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.WARNING NOTES:WARNINGJoists are unstable until braced laterallyBracing Includes:BlockingHangersSheathingRim BoardStrut LinesRim JoistDO NOT stack buildingmaterials on unsheathedjoists. Stack only overbeams or walls.DO NOT walk on joiststhat are lying flat.DO NOT walk on joistsuntil braced.INJURY MAY RESULT.Weyerhaeuser, Microllam®, Parallam®, Silent Floor®, TimberStrand®, TJI®, and Trus Joist® are registered trademarksof Weyerhaeuser NR. © 2009 Weyerhaeuser NR Company. All rights reserved.TimberStrand® LSL, TrusJoist® rim board, or(Microllam® LVL with EORapproval) see placement plan.TimberStrand® LSL, TrusJoist® rim board, or (Microllam®LVL with EOR approval)TimberStrand® LSL, TrusJoist® rim board, or (Microllam®LVL with EOR approval)TimberStrand® LSL, TrusJoist® rim board, or (Microllam®LVL with EOR approval) seeplacement plan.B4End of joist at centerline of support. Blocking panels required.Load bearing or shear wall above (must stack over wall below when present)Plate nail - 16d (0.135" x 312")at 16" on-center*Floor panel nail - 8d (0.131" x 212")at 6" on-center*A3WWToe nail - 10d (0.131" x 3")at 6" on-center*When sheathing thickness exceeds 78",trim sheathing tongue at rim boardWeb Stiffeners requiredeach side at A3._WA3A3.2A3.1 A3.3A3.1WA3.2WA3.3TimberStrand® LSL, Trus Joist®rim board, or (Microllam® LVL withEOR approval) see placement plan.For rim board thicker than 1 34"- Attach TJI® Joist to rim board with one 10d (0.128"x3")nail. Top nail from TJI® joist into rim board.- Connect corner with four 10d (0.128"x3") nails. Toe nailfrom side of parallel closure into rim board.*Conventional construction code minimum for use withA3 only. See the Trus Joist TJI® Specifier's Guide, #TJ-4000,and the Trus Joist® Rim Board Specifier's Guide, #TJ-8000,for A3.1-A3.3 installation specifications and applications.Doubletop plateStudKingstudHeader platestops at insideface oftrimmersHeader - per plan(bears directly ontrimmers)Trimmers- per planHeadercrippleTypical Header DetailWindow/Door OpeningOnly header openings and roof loads which affect Trus Joistproduct sizes have been denoted on this layout. In addition toany CS detail callouts shown, solid blocking and/or squashblocks are required to provide vertical load transfer from allconcentrated load locations to foundation below. See pocketframer guide for appropriate detail(s).ASSUMED BEARING LENGTH FOR BEAMSAt parallel walls assume 1-1/2" end bearing, at perpendicular wallsassume full wall width end bearing UNO.ALLOWABLE JOIST SHIFTSIndividual joists can be shifted up to 3" maximum from their on-centerspacing to avoid hanger interference/plumbing drops/post.(DO NOT EXCEED 24" O.C. MAXIMUM SPACING)CANTILEVERS/TRUSSESDesign assumes all trusses at floor cantilevers are connected to thewall and NOT to the Trus Joist rimboard. If trusses need to connectto the Trus Joist rimboard, contact Weyerhaeuser for a connectiondetail prior to installation.JOIST & BEAM HANGER FACE NAILING REQUIREMENTS* FOR3 & 4 PLY SUPPORTING MEMBERSFor IUS or THF Hangers - Use 10d (0.148") x 3" nails.For MIU, HU, HHUS, HGUS or HD, THD, THDH Hangers - Use 16d(0.162") x 3-1/2" nails.*For hangers that have joist fasteners/connections, fill all holes withthe manufacturer's recommended fasteners.**FLOOR & ROOF DESIGN PARAMETERS**Face mounthangerTop flangehangerVerify column capacityand beam bearinglength. See currentiLevel® literature.L5L1BEARING ATCOLUMNColumnSee current Trus Joist® literaturefor framing connectorsL6Additional nailing or bolting may berequired with side-loaded multiple-memberbeams. Refer to current product literature.CONNECTION OF MULTIPLE PIECESOF TOP-LOADED BEAMS (1)Minimum of 3 rows 10d (3" x 0.128") nails at 12" o.c.Minimum of 4 rows 10d (3" x 0.128") nails at 12" o.c.for 14" and deeper beamsIf using 12d (314") or larger nails, the number ofnailing rows may be reduced by one.(1) Load must be applied evenly across entirebeam width. Otherwise, use connections forside-loaded beams.312" Width Pieces:Minimum of 2 rows 12" bolts at24" o.c. staggered134" Width Pieces:L2L3Protect untreatedwood from directcontact withconcreteL4BEARING AT WALLBEARING FOR DOOROR WINDOW HEADERStrap per code if top plateis not continuous overheaderBEAM TO BEAMCONNECTIONBEARING ATCONCRETE WALLTimberStrand® LSL, Trus Joist® rimboard, (Microllam® LVL with EORapproval), or TJI® blocking for lateral supportBEAM DETAILS2'TJI® JOIST2"2x6 (min.) solid sawn or 4 12" wideTimberstrand® LSL rim board, full lengthin bay and tight to each joist flange. Connectto plate with 8d (0.113" x 2 38") nails at 6"on-center.2416 span rated sheathing (716" Min.).Attach with 8d (0.113" x 2 38") nails at6" on-center along panel edges and infield. Use pressure treated plywoodfor ground level cantilevers.E1 ALTWARNINGJoists are unstable until braced laterally,Safety bracing required during installation.Lateral load transfer for this detail is180 PLF (pounds per lineal foot).Additional connections may be requiredto transfer lateral loads from wall above.16' maxdeck2'11 7/8" - 16" TJI®2"6"16' maxdeck2'9 1/2" TJI®6"2x_ Furring2416 span rated sheathing (716" Min.).Attach with 8d (0.113" x 2 38") nails at6" on-center along panel edges and infield. Use pressure treated plywoodfor ground level cantilevers.Inverted hanger (seehanger list on Trus Joiststructural layout)Treated ledger1 18" x 11 7/8" Trus Joist® rim boardInverted hanger (seehanger list on iLevelstructural layout)Treated ledgerE1 ALT LA2416 span rated sheathing (716" Min.).Attach with 8d (0.113" x 2 38") nails at6" on-center along panel edges and infield. Use pressure treated plywoodfor ground level cantilevers.E1 ALT LA 9.52x6 (min.) solid sawn or 4 12" wideTimberstrand® LSL rim board, full lengthin bay and tight to each joist flange. Connectto plate with 8d (0.113" x 2 38") nails at 6"on-center.Timberstrand ® LSL rim boardto match TJI® depth2x6 (min.) solid sawn or 4 12" wideTimberstrand® LSL rim board, full lengthin bay and tight to each joist flange. Connectto plate with 8d (0.113" x 2 38") nails at 6"on-center.WARNINGJoists are unstable until braced laterally,Safety bracing required during installation.Lateral load transfer for this detail is180 PLF (pounds per lineal foot).Additional connections may be requiredto transfer lateral loads from wall above.WARNINGJoists are unstable until braced laterally,Safety bracing required during installation.Lateral load transfer for this detail is180 PLF (pounds per lineal foot).Additional connections may be requiredto transfer lateral loads from wall above.Attach reinforcementto TJI® joist with 8d (212")common nails at 6" on-center. When reinforcingboth sides, stagger nails.E3E22'-0"maximumFace grainhorizontal4'-0" length of34" reinforcementon one side at E2,both sides at E3ALT ALTTimberstrand ® LSL rim boardto match TJI® depth2x6 (min.) solid sawn or 4 12" wideTimberstrand® LSL rim board, full lengthin bay and tight to each joist flange. Connectto plate with 8d (0.113" x 2 38") nails at 6"on-center.2416 span rated sheathing (716" Min.).Attach with 8d (0.113" x 2 38") nails at6" on-center along panel edges and infield. Use pressure treated plywoodfor ground level cantilevers.WARNINGJoists are unstable until braced laterally,Safety bracing required during installation.Lateral load transfer for this detail is180 PLF (pounds per lineal foot).Additional connections may be requiredto transfer lateral loads from wall above.Timberstrand ® LSL rim boardto match TJI® depthUNLESS NOTED OTHERWISEFLOOR LIVE LOAD DEFLECTION CRITERIA: L/480FLOOR LIVE LOAD: 40 PSFFLOOR DEAD LOAD: 10 PSFSNOW LIVE LOAD: 35 PSFROOF DEAD LOAD: 20 PSF (TRUSSED ROOFS)ROOF DEAD LOAD: 15 PSF* (TJI/RAFTER)*Dead Loads are adjusted for slope correctionTJI® blockingpanelA1PB113 joist span8' max.Apply subflooradhesive to allcontact surfacesOption #3:Option #1:Option #2:TJI® Joist blocking with endblocks installed at 13 joist-spanlocations usingtwo 8d (0.113" x 212")nails or2 12" screws,typical2x_ strapping installed at 13joist-span locations using two2 12" screws per joist, typicalDirectly applied ceilingWhen specified on the layout, one ofthe above bracing options is requiredAdditional Notes1.5E TimberStrand®LSL Prescriptive Chart13 depth2 x diameter of thelargest hole (minimum)8"See illustration for allowed hole zone1114"-11 78"14"-16"914"-912"358"458"3"Round holes onlyGeneral NotesNo holes within 8" of joist ends.Maximum RoundHole SizeJoist DepthAllowed hole zone1.5 E TimberStrand® LSL8"Round holes larger than 3-5/8" up to 7-1/4" max. in1.5" x 11-7/8" 1.5E TimberStrand LSL joist onlyEdge of large holes need to be at least 4 times the diameter of the largest hole(for a 7-1/4" hole, the closest distance allowed to the next hole is 29", even if the nexthole is a small 12" diameter hole).The hole must be centered within the joist vertically.No square or rectangular holesNo more than (2) holes between 3-5/8" and 7-1/4" diameter allowed per span.See chart below for minimum distance from inside face of bearing to edge of hole for holeslarger than 3-5/8" but not greater than 7.25"Minimum distance from edge of hole to inside face ofbearing (end or intermediate)4"5"6.5" 7.25"2'-0"2'-0" 3'-0"3'-6"the area of a 7-1/4" circumscribed hole A smaller hole can be drilled withincentered in the depth of the joistcircumscribed 7-1/4" holesmaller hole drilled withincircumscribed area of 7-1/4" holeassuming the circumscribed hole is a minimum of 3'-6" from face of bearing1-1/2" x 11-7/8" 1.5E TimberStrand LSL floor joistSales Presentation Drawing:No structural or dimensional check has been performed on this drawing. Lyman Companieswould only be responsible for the individual member design, based on the assumed or knownvertical loads. The Builder or General Contractor is responsible for the structure(s) overalldesign, and it is strongly recommended that all drawings and calculations be reviewed by theengineer of record for this particular project. ADD - WALKOUT HEADERSPlotID Length ProductPlies Net QtyTSHd1-2 14' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TSHd4-2 6' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 4ADD - LOOKOUT HEADERS - ABCPlotID Length ProductPlies Net QtyTSHd2-2 12' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TSHd4-2 6' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2 Start Joist Layout Here.ALL ELEVATIONSPlotID Length ProductPlies Net QtyFBk1 8' 9 13/16" 11 7/8" TJI 210 joist1 1TS1 44' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 3TS2 30' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 4TS3 28' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 12TS4 16' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 12TS5 12' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 5TS6 8' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 4TS8-3 14' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 3 3TS7 14' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 1TS9-3 10' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 3 3TS11-2 8' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 6TS10 8' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 1TS12 4' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 2STRm1 16' 0" 1 1/8" x 11 7/8" TJ Rim Board1 1223/32"x48"x96" Weyerhaeuser Edge Gold Panel (0/24) T&G SF 1 50ALL ELEVATIONSPlotID Qty Manuf Product Backer Blks Web StiffH1 16 Simpson LUS210 No NoADD - LOOKOUT HEADERS W/ CORNER FP OPTIONPlotID Length ProductPlies Net QtyTSHd3-3 12' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 3 3TSHd4-2 6' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2ALL ELEVATIONS SOIL PRESSURE BLOCKINGPlotID Length Product Plies Net QtySoil Pressure Blkg 116' 0" 11-7/8" TJI® 210 1 1ADD - FULL FOUNDATIONPlotID Length ProductPlies Net QtyNot Shown 44' 0" 1-1/2" x 11-7/8" 1.5E Timberstrand LSL 1 1B1B2B2A3A3A3A3A3A3A3A3CSCSCSCSCSCSCSCSCSCSCSB2B1TS8-3TS9-3TS11-2TS11-2TS11-2TS7TS12TS12TS10TSHd1-2TSHd4-2TSHd4-2TSHd2-2BBOHd1-2TSHd4-2TS6TS5STRm1STRm1STRm1STRm1STRm1STRm1STRm1STRm1STRm1STRm1STRm1STRm1STRm1STRm1FBk1TSHd3-3BBOHd1-2TSHd4-23"3"1' 2 5/16"1' 9 3/4"1' 3 7/8"FBk1TS319.2" O.C.TS419.2" O.C.TS419.2" O.C.TS419.2" O.C.TS619.2" O.C.TS519.2" O.C.TS219.2" O.C.H1H1H1H1TS119.2" O.C.3"3"3"3"3"3"3.5"4.5"WALKOUT OPTIONLOOKOUT OPTIONELEVATION A,B,CLOOKOUT OPTIONw/ CORNER FP OPTIONEGRESS OPTIONInstall (4) 2x6 squash blocks underall points loads at front of house.For labeled Point Loads exceeding10,000 lbs contact LENNAR forFraming Details.Full Foundation: 1-1/2" LSL 1.5Eflush with canted sill plate. LSLattached to Rim held to inside liningup with concrete foundation. (1-1/2"LSL not shown on layout.)All joist blocking including soil pressure joistblocking can be either 210 or 360 series TJI or1-1/2" Timberstrand LSL 1.5E material.2" brg on 4 stalloption and expandedgarage option2-5/8" brg2-5/8" brg5" brg on 4 stall option andexpanded garage option5-1/4" wide column7" wide column on 4stall option and garageexpansion optionNO MATERIAL CHANGEFOR FULL HEIGHT SIDE ORCORNER FIREPLACES.ADD - LOOKOUT HEADERS - DEPlotID Length ProductPlies Net QtyTSHd3-3 12' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 3 3TSHd4-2 6' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TSHd3-3BBOHd1-2TSHd4-23"3"LOOKOUT OPTIONELEVATION D,EWeyerhaeuser prepared these plans for the specification of Trus Joistproducts based on project information provided to us. This service is solelyintended for product application assurance; and, is not intended to circumventthe need for a design professional as determined by the building codes.The designer of record and/or builder/framer is responsible to assure thesedrawings are compatible with the overall project.Copyright 2009 Weyerhaeuser NR Company. All rights reserved.Anyunauthorized copying of reproduction will constitute an infringement of copyright.Architectural Drawings Prepared By:LENNAR - MNStructural Drawings Prepared By:N/A12/16/13N/ALENNAR - MNWASHBURN E/IALL ELEVATIONSRev.ByDateJLH7-9-20CommentsUpdate layout for E/I plan changes.Drawn By:ALAN GOriginal Date:8/13/12First Floor Framing PlanScale: 1/4" = 1'-0"R12-1521064014 EI D,ESheet2of 3Structural Framer'sPocket Guide.Access with your Smart Phone.http://woodbywy.com/document/tj-9001/Have a damaged joist or beam?File an electronic damage report forprompt service from your regionaltechnical office. Scan the QR Codewith your smartphone or go to:www.damagereport.wSpecification Teamservice.request@weyerhaeuser.com(888) 453-8358 . . . . . . . . www.woodbywy.comLack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines:WARNING NOTES:WARNINGJoists are unstable until braced laterallyBracing Includes:BlockingHangersSheathingRim BoardStrut LinesRim JoistDO NOT stack buildingmaterials on unsheathedjoists. Stack only overbeams or walls.DO NOT walk on joiststhat are lying flat.DO NOT walk on joistsuntil braced.INJURY MAY RESULT.Weyerhaeuser, Microllam, Parallam, TimberStrand, TJI, TJ, and Trus Joist are registered trademarks ofWeyerhaeuser NR. © 2014 Weyerhaeuser NR Company. All rights reserved.1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay.3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist.Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing.5. Ends of cantilevers require safety bracing on both the top and bottom flanges.6. The flanges must remain straight within 1/2" from true alignment.4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.THINK SAFETY - READ INSTALLATION INFORMATION BEFORE PROCEEDINGA COMPLETE JAVELIN® LAYOUT INCLUDES THE WEYERHAEUSER FRAMER'S POCKET GUIDE.Only header openings and roof loads which affectWeyerhaeuser product sizes have been denoted onthis layout. In addition to any'CS' detail calloutsshown, solid blocking and/or squash blocks arerequired to provide vertical load transfer from allconcentrated load locations to foundation below.See Pocket Framer's Guide for appropriate detail(s).3" adjustment allowed for joist spaced 19.2"o.c. or less to accommodate plumbing drops.DO NOT CUT JOIST FLANGES.This layout is intended for the use of TrusJoist® engineered wood products only. Thesubstitution of other engineered wood productswith this layout is NOT PERMITTED. Pleaseidentify the TJI® , TimberStrand® LSL , Microllam® LVL , and Parallam® PSL stampson the product to ensure that this layout isvalid for the products actually installed.Sales Presentation Drawing:No structural or dimensional check has been performed on this drawing. Lyman Companieswould only be responsible for the individual member design, based on the assumed or knownvertical loads. The Builder or General Contractor is responsible for the structure(s) overalldesign, and it is strongly recommended that all drawings and calculations be reviewed by theengineer of record for this particular project. Start Joist Layout Here.B4A3A3A3A3A3CSCSCSCSCSCSB1B1B1TSHd1-2TSHd3-2 TSHd5-2TSHd4-3TS8-2TS3-2M2-2TS4TS5TSHd2-2TS1-2BBO20TS9-3TS10TS11TS12STRm1STRm1STRm1STRm1STRm1STRm1STRm1STRm1STRm1FBk1TS7TS2-3H3H3H8H1H1H71' 6 3/16"1' 5 1/4"1' 9 1/8"1' 5 7/16"2' 0 1/4"1' 3 7/8"1' 11 5/16"1' 3 1/16"1' 3 15/16"1' 6 3/16"1' 11 9/16"1' 2 7/8"FBk1FBk1FBk11' 9 11/16"1' 5 11/16"F30'19.2" O.C.F20'19.2" O.C.F24'19.2" O.C.F44'19.2" O.C.F16'19.2" O.C.F16'19.2" O.C.H5H5H5H5H62 x 10 MIN. BOTTOMCHORD REQUIRED3"3"3"3"3"3"3"3"3"Can LightSerenity Bath OPTStandard Bath w/95333 Spectacle tubSerenity Bath Opt:shift this joist 4"toward stairs.3/4 BathJ&J BathRoof - Elevation EPlotID Length Product Plies Net QtyTSHd1-2 14' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL2 2TSHd2-2 6' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 22TSHd1-2BBOHd3-2BBOHd2-2BBO22BBOHd2-2BBO26BBO27BBO28BBO29TSHd2-26' 0" 4' 0" 4' 0" 3"3"Girder Set-BackGirder Set-BackGirder Set-BackWindow size shrinks and shiftswhen 4 Car Garage Opt selected.Header changes to 2-2x10.Interior bearing wallrequired when 4'-0"expanded garage optionand 4 Car Garageoption is selected.ADD - ELEVATION D,E 4 CAR GARAGE OPTIONPlotID Length Product Plies Net QtyF28' 28' 0" 11 7/8" TJI 210 joist 1 2F18' 18' 0" 11 7/8" TJI 210 joist 1 2FBk1 11' 5 1/8" 11 7/8" TJI 210 joist 1 1M1-2 20' 0" 1 3/4" x 16" 2.0E Microllam LVL 2 2M3-3 14' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL 3 3TSHd2-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2STRm1 16' 0" 1 1/8" x 11 7/8" TJ Rim Board 1 1REMOVE - ELEVATION D,E 4 CAR GARAGE OPTIONPlotID Length ProductPlies Net QtyF44' 44' 0" 11 7/8" TJI 210 joist 1 2M2-2 14' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL 2 2TS1-2 22' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2TS2-3 18' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 3 3REMOVE - ELEVATION D,E 4 CAR GARAGE OPTIONPlotID Qty Manuf Product Backer Blks Web StiffH8 1 User HUCQ610-SDS Not Required Not RequiredA3CSCSCSB1B1B1M3-3TS4TSHd2-2M1-2BBO57TS12STRm1STRm1STRm1F18'F18'BBO103TSHd2-2BBO59H2BBO453"3"6-1/2"BBO58STRm1H3H3F28'FBk1F28'1' 3 3/16"1' 7 1/2"1' 10 3/16"1' 8 1/4"1' 6 1/8"FBk1FBk11' 9 11/16"1' 7 3/4"F24'19.2" O.C.F44'19.2" O.C.F44'19.2" O.C.F44'19.2" O.C.F44'19.2" O.C.H62 x 10 MIN. BOTTOMCHORD REQUIRED6"ELEVATION D,E - 4CAR GARAGE OPTIONGarage Header designed to L/600TL for Stone Load Deflection.Attach Rim to Bottom Chord of Girderwith (3) rows of 16d nails @ 6" o/c6"Serenity Bath OPTStandard Bath w/95333 Spectacle tub3/4 BathADD -W/ CORNER FP OPTIONPlotID Length ProductPlies Net QtyTSHd2-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2REMOVE -W/ CORNER FP OPTIONPlotID Length ProductPlies Net QtyTSHd1-2 14' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TSHd2-2CORNER FIREPLACE OPTION3"3"ELEVATION EPlotID Qty Manuf Product Backer Blks Web StiffH1 2 Simpson HUC48 No NoH3 2 Simpson IUS1.81/11.88 No NoH5 16 Simpson IUS2.06/11.88 No NoH6 13 User HU2.1/9 Not Required RequiredH7 1 User HUC48 Not Required Not RequiredH8 1 User HUCQ610-SDS Not Required Not RequiredELEVATION EPlotID Length ProductPlies Net QtyF44' 44' 0" 11 7/8" TJI 210 joist1 13F30' 30' 0" 11 7/8" TJI 210 joist1 3F24' 24' 0" 11 7/8" TJI 210 joist1 3FBk1 20' 2 1/4" 11 7/8" TJI 210 joist1 1F20' 20' 0" 11 7/8" TJI 210 joist1 4F16' 16' 0" 11 7/8" TJI 210 joist1 15M2-2 14' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL 2 2TS1-2 22' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 22TS2-3 18' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 33TS3-2 14' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 22TS4 12' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 1TS5 8' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 1TS8-2 4' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2TS7 4' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 1TSHd1-2 14' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL2 2TSHd2-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL2 2TSHd4-3 8' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 33TSHd3-2 8' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 22TSHd5-2 6' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 22TS9-3 8' 0" 1 3/4" x 7 1/4" 1.55E TimberStrand LSL 3 3TS10 8' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1TS11 6' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1TS12 4' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1STRm1 16' 0" 1 1/8" x 11 7/8" TJ Rim Board1 1023/32"x48"x96" Weyerhaeuser Edge Gold Panel (0/24) T&G SF 1 63NO MATERIAL CHANGE FORSERENITY BATH OPTION.REMOVE - ELEVATION D, E GARAGE EXPANSIONPlotID Qty Manuf Product Backer Blks Web StiffH8 1 User HUCQ610-SDS Not Required Not RequiredREMOVE - ELEVATION D, E GARAGE EXPANSIONPlotID Length ProductPlies Net QtyF44' 44' 0" 11 7/8" TJI 210 joist 1 2M2-2 14' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL 2 2TS2-3 18' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 3 3ADD - ELEVATION D, E GARAGE EXPANSIONPlotID Length Product Plies Net QtyF28' 28' 0" 11 7/8" TJI 210 joist 1 2F18' 18' 0" 11 7/8" TJI 210 joist 1 2FBk1 11' 5 1/8" 11 7/8" TJI 210 joist 1 1M3-3 14' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL 3 3STRm1 16' 0" 1 1/8" x 11 7/8" TJ Rim Board 1 2CSCSB1A3B1B1CSM3-3TS4TS1-2BBO104TS12STRm1STRm1STRm1F28'F28'TSHd2-2GirderH1H3F18'FBk1F18'1' 3 3/16"1' 7 1/2"1' 10 3/16"1' 6 1/8"1' 8 1/4"H4FBk1FBk11' 9 11/16"1' 7 3/4"F24'19.2" O.C.F44'19.2" O.C.F44'19.2" O.C.F44'19.2" O.C.F44'19.2" O.C.H6Attach Rim to Bottom Chord of Girderwith (3) rows of 16d nails @ 6" o/c2 x 10 MIN. BOTTOMCHORD REQUIRED6"ELEVATION D,E - GARAGEEXPANSION OPTIONCan LightSerenity Bath OPT6"Standard Bath w/95333 Spectacle tubSerenity Bath Opt:shift this joist 4"3/4 BathWeyerhaeuser prepared these plans for the specification of Trus Joistproducts based on project information provided to us. This service is solelyintended for product application assurance; and, is not intended to circumventthe need for a design professional as determined by the building codes.The designer of record and/or builder/framer is responsible to assure thesedrawings are compatible with the overall project.Copyright 2009 Weyerhaeuser NR Company. All rights reserved.Anyunauthorized copying of reproduction will constitute an infringement of copyright.Architectural Drawings Prepared By:LENNAR - MNStructural Drawings Prepared By:N/A12/16/13N/ALENNAR - MNWASHBURN E/IELEVATION ERev.ByDateJLH7-9-20CommentsUpdate layout for E/I plan changes.Drawn By:ALAN GOriginal Date:8/13/12Second Floor Framing PlanScale: 1/4" = 1'-0"R12-1521064014 EI D,ESheet3of 3Structural Framer'sPocket Guide.Access with your Smart Phone.http://woodbywy.com/document/tj-9001/Have a damaged joist or beam?File an electronic damage report forprompt service from your regionaltechnical office. Scan the QR Codewith your smartphone or go to:www.damagereport.wSpecification Teamservice.request@weyerhaeuser.com(888) 453-8358 . . . . . . . . www.woodbywy.comRoof Header PlanScale: 3/16" = 1'-0"Lack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines:WARNING NOTES:WARNINGJoists are unstable until braced laterallyBracing Includes:BlockingHangersSheathingRim BoardStrut LinesRim JoistDO NOT stack buildingmaterials on unsheathedjoists. Stack only overbeams or walls.DO NOT walk on joiststhat are lying flat.DO NOT walk on joistsuntil braced.INJURY MAY RESULT.Weyerhaeuser, Microllam, Parallam, TimberStrand, TJI, TJ, and Trus Joist are registered trademarks ofWeyerhaeuser NR. © 2014 Weyerhaeuser NR Company. All rights reserved.1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay.3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist.Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing.5. Ends of cantilevers require safety bracing on both the top and bottom flanges.6. The flanges must remain straight within 1/2" from true alignment.4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.THINK SAFETY - READ INSTALLATION INFORMATION BEFORE PROCEEDINGA COMPLETE JAVELIN® LAYOUT INCLUDES THE WEYERHAEUSER FRAMER'S POCKET GUIDE.Only header openings and roof loads which affectWeyerhaeuser product sizes have been denoted onthis layout. In addition to any'CS' detail calloutsshown, solid blocking and/or squash blocks arerequired to provide vertical load transfer from allconcentrated load locations to foundation below.See Pocket Framer's Guide for appropriate detail(s).3" adjustment allowed for joist spaced 19.2"o.c. or less to accommodate plumbing drops.DO NOT CUT JOIST FLANGES.This layout is intended for the use of TrusJoist® engineered wood products only. Thesubstitution of other engineered wood productswith this layout is NOT PERMITTED. Pleaseidentify the TJI® , TimberStrand® LSL , Microllam® LVL , and Parallam® PSL stampson the product to ensure that this layout isvalid for the products actually installed.Sales Presentation Drawing:No structural or dimensional check has been performed on this drawing. Lyman Companieswould only be responsible for the individual member design, based on the assumed or knownvertical loads. The Builder or General Contractor is responsible for the structure(s) overalldesign, and it is strongly recommended that all drawings and calculations be reviewed by theengineer of record for this particular project. © © &CVG4GXKUKQP2TQLGEV0WODGT&CVG55JGGVUQH2TKPV0COG5KIPGF.KEGPUG0WODGT&CVG+JGTGD[EGTVKH[VJCVVJKURNCPURGEKHKECVKQPQTTGRQTVYCURTGRCTGFD[OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGTWPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC-KNOGT.CPG05WKVG2N[OQWVJ/06GNÄÄYYYJCPUQPITQWROPEQO.GPPCT%QTRQTCVKQPVJ#XG05WKVG2N[OQWVJ/02.#055*190.+)*6+0$#%-)4170'(14.1%#6+104'('4'0%'10.;2.#0016'5#0&'.'/'0655*190.+)*6/#;0160'%'55#4+.;57221466*'*#0510)41725&'5+)0&GUETKRVKQP%12;4+)*6*#0510)4172..%6*+55*''654'24'5'065#%1/2.'6'&'5+)01(6*'/#+09+0&(14%'4'5+56+0)5;56'/(146*''06+4'4'5+&'06+#.5647%674'6*'.1%#6+10#0&.'0)6*1('#%*$4#%'&9#..2#0'.#0&'0)+0''4'&9+0&4'5+56+0)'.'/'066*#6+54'37+4'&(146*'*#0510)41725&'5+)0+55*190106*'5647%674#.&4#9+0)59#..501652'%+(+%#..;.#$'.'&106*'2.#05/#;$'56#0&(4#/+0)5'%6+1055*190&'2+%6%100'%6+1051($4#%'&9#..2#0'.561411(64755'5#$18'61,1+56564755'5$.1%-+0)#$18'#0&61,1+56564755'5$.1%-+0)$'.196*'5'2#0'.5#4'0160'%'55#4+.;4'37+4'&61#.+)0$76/#;&'2'0&+0)102.#0.#;176411(64755'5$4#%'&9#..2#0'.(.#6Z"1% /+0 2'4$4#%'&9#..2#0'.5+/2510#(4#/+0)#0).''#%*'0& Z0#+.52418+&'9+&6*9'$56+(('0'4(14#66#%*/'061((4#/+0)#0).'$4#%'&9#..2#0'. Z0#+.55+/2510#(4#/+0)#0).''#%*'0&(.114,1+5652418+&'9+&6*9'$56+(('0'4(14#66#%*/'061((4#/+0)#0).'$4#%'&9#..2#0'. Z0#+.55+/2510#(4#/+0)#0).''#%*'0&(.114,1+565$4#%'&9#..2#0'. Z0#+.55+/2510.62(4#/+0)2.#6''#%*'0&(.11464755'5(.#6Z"1% /+0 2'4$4#%'&9#..2#0'.(.#6Z"1% /+0 2'4$4#%'&9#..2#0'.(.#6Z"1% /+0 2'4$4#%'&9#..2#0'.$4#%'&9#..2#0'. Z0#+.55+/2510.62(4#/+0)2.#6''#%*'0&(.11464755'5(.#6Z"1% /+0 2'4$4#%'&9#..2#0'.$4#%'&9#..%100'%6+10$4#%'&9#..%100'%6+10$4#%'&9#..%100'%6+10 411(64755'5 (.114,1+565 (.11464755'5&'6#+.55*190#$18'#4'#.6'40#6+8'%100'%6+10561$'75'&9*'0$4#%'&9#..2#0'.&1'5016#.+)09+6*(4#/+0)':6'4+14010Ä$'#4+0)9#..(4#/'Z$1:#4170&52#%'$'69''064755Y5#/'5*'#6*+0)#0&(#56'0+0)#59#..$'.19 144'2.#%'Y#&'37#6'&'26*Z/'/$'4Z911&5%4'95"1%+056#..'&+0#&&+6+10610#+.5 /#+0722'4.'8'.411(64755$'#4+0)9#..510.;Z911&5%4'95"1%+056#..'&+0#&&+6+10610#+.5 /#+0722'4.'8'.411(64755$'#4+0)9#..510.;':6'4+14$'#4+0)9#..4'24'5'065(+)74'4 +0&+%#6'5+06'4+14$4#%'&9#..2#0'.Y);257/5*'#6*+0)$16*(#%'59+6*'+6*'4(#56'0'4126+10.+56'&+0016'52#%'=%2418+&'+0%4'#5'&(#56'0+0)4'37+4'/'065#55*190$'.19+0&+%#6'5'0)+0''4'&9+0&4'5+56+0)'.'/'06561$'%105647%6'7*190+06*'&'6#+.5*''65 /+0.'0)6*+0&+%#6'5':6'4+14$4#%'&9#..2#0'.Y5*'#6*+0)10':6'4+14(#%'+0#%%14�%'Y016'2418+&'+0%4'#5'&(#56'0+0)4'37+4'/'065#55*190$'.19 /+0.'0)6*Y,1+565Y64755'5Y,1+565Y64755'5Y,1+565Y64755'5Y,1+565Y64755'55%12'&'5+)0#0&&'6#+.1(6*'/#+09+0&(14%'4'5+56+0)5;56'/(14#5+0).'Ä(#/+.;4'5+&'0%'%105647%6+10+561$'+0#%%14�%'9+6*6*+5&1%7/'0656#0&+0&7564;24#%6+%'#0&6*'%1&'016'56*'5'&1%7/'065#22.;615647%674#.10.;4'('461%105647%6+10&1%7/'065(14/14'+0(14/#6+10#..':6'4+149#..5#4'61$'%105647%6'&+0#%%14�%'9+6*6*'(1..19+0)%4+6'4+#7019*+%*/''6514':%''&56*'4'37+4'/'0651(%1&'5'%6+104Ä952#0&%5Ä952#Z567&552#%'&"1%$':6'4+145*'#6*+0)/+05647%674#.2#0'.5*'#6*+0)YF%1//100#+.5"1%#62#0'.'&)'5#0&1%#6+06'4/'&+#6'5722146514)#7)'56#2.'5"52#%+0)#..+06'4+149#..5#4'61$'%105647%6'&+0#%%14�%'9+6*6*'(1..19+0)%4+6'4+#701#Z14Z567&552#%'&"1%$9#..5*'#6*+0)/+0);257/5*'#6*+0)(#56'0'&61(4#/+0)YF%11.'40#+.5"1%/#:146;2'599#..$1#4&5%4'95"1%/#: /+0+/7/567&2'0'64#6+10#..(.1145#4'61$'%105647%6'&+0#%%14�%'9+6*6*'(1..19+0)%4+6'4+##(.114(4#/+0)52#%'#/#:+/7/1(1%$(.1145*'#6*+0)5647%674#.2#0'.5*'#6*+0)YF%1//100#+.5"1%#62#0'.'&)'5#0&1%#6+06'4/'&+#6'57221465#..411(5#4'61$'%105647%6'&+0#%%14�%'9+6*6*'(1..19+0)%4+6'4+##411((4#/+0)52#%'#/#:+/7/1(1%$(#56'0#..411((4#/+0)616122.#6'59+6*5+/2510*%.+214'37+8#.'06#0& Z61'0#+.5%411(5*'#6*+0)5647%674#.2#0'.5*'#6*+0)YF%1//100#+.5"1%#62#0'.'&)'5#0&1%#6+06'4/'&+#6'5722146514)#7)'56#2.'5"52#%+0)#.10).'0)6*1(9#..5.#29#..6122.#6'5#/+0+/7/1(#0&(#56'061)'6*'49+6* Z+0.#2<10'#6%140'45#0&+06'45'%6+105.#22.#6'5#0&2418+&' Z(#%'0#+.5%100'%6+10501652'%+(+%#..;016''61$'+0#%%14�%'9+6*%1&'6#$.'4 6#..911&9#..(4#/+0)+561$'&'5+)0'&$;5722.+'4(14)4#8+6;#0&176Ä1(Ä2.#0'9+0&.1#&56*''064;214%*+5%105+&'4'&61$'#24+/#4+.;12'0010Ä'55'06+#.2146+101(6*'5647%674'#0&+5':%.7&'&(41/6*'18'4#../#+09+0&(14%'5;56'/1(6*'*1/'2418+&'%1&'4'37+4'&72.+(6%100'%6+105#6#..21565/#6'4+#.59#..567&5 14.'5552(567&)4#&'14$'66'49#..567&5 18'452(01)4#&'14$'66'4&+/'05+10#..7/$'452(01)4#&'14$'66'464'#6'&.7/$'45;201)4#&'14$'66'4.5.9+&6*Ä'14$'66'4.8.9+&6*Ä'14$'66'4.1#&5411(5019.1#&Ä25(411(&'#&.1#&25((.114.+8'.1#&25((.114&'#&.1#&25(9+0&.1#&/2*7.6+/#6'':2$%1&'/+00'516#4'5+&'06+#.%1&'*#4&9#4'#.6'40#6'6#$.'5+/2510241&7%6752241&7%6#/2#/2#*46*66*66.56#564#25#/'.62/2(/56%564#25#/'56*&4,56#&4,6+6'0*&9'&)'$1.6*#4&9#4'+05#/'419/#;$'75'&+06'4%*#0)'#$.;+06*+5&1%7/'06411(64755'5(#56'0'&612.#6'5Y Z61'0#+.5 5+/2510*%.+20#+.$1661/2.#6'614+/,1+56$.1%-+0)Y F0#+.5'8'4;0#+.$1661/2.#6'614+$$10$4#%'64755Y F0#+.5'8'4;0#+.'#%*,1+56616122.#6'5Y Z0#+.5Z$.1%-+0)$'69''064755'50#+.'&616122.#6'5Y Z0#+.5'#%*0#+.'#%*64755616122.#6'5Y Z61'0#+.5411(64755(#56'0'&612.#6'5YZ61'0#+.5"1%0#+.$1661/2.#6'614+/,1+56$.1%-+0)Y F0#+.5'8'4;0#+.4+/6122.#6'5YZ61'0#+.5"1%0#+.$1661/2.#6'61.#&&'464755Y F0#+.5'8'4;0#+..#&&'464755616122.#6'5YZ0#+.5"1%+06'4+149#..2'42'0&+%7.#461(4#/+0)+06'4+149#..2#4#..'.Y(4#/+0)Z$.1%-+0)$'69''0411(64755'50#+.'&616122.#6'5Y Z0#+.5'#%*0#+.$1661/2.#6'61$.1%-+0)Y F0#+.5'8'4;2418+&'(7..&'26*$.1%-+0)$'69''0,1+5650#+.'&616122.#6'5Y Z0#+.5'#%*0#+.'#%*,1+56616122.#6'Y Z0#+.50#+.$1661/2.#6'61$.1%-+0)Y F0#+.5'8'4;2418+&'(7..&'26*$.1%-+0)$'69''064755'50#+.'&616122.#6'5Y Z0#+.5'#%*0#+.'#%*64755616122.#6'Y Z61'0#+.52418+&'411(64755&+4'%6.;+0.+0'Y$4#%'&9#..2#0'.(#56'0'&612.#6'5YZ61'0#+.5"1%0#+.$1661/2.#6'61$.1%-+0)Y F0#+.5'8'4;2418+&',1+56&+4'%6.;+0.+0'Y$4#%'&9#..2#0'.(#56'0'&612.#6'5YZ61'0#+.5"1%0#+.$1661/2.#6'61$.1%-+0)Y F0#+.5'8'4;2418+&'64755&+4'%6.;+0.+0'Y$4#%'&9#..2#0'.(#56'0'&612.#6'5YZ61'0#+.5"1%/#+0.'8'.*175'2.#05*190(14.1%#6+104'('4'0%'10.; #%67#..#;176/#;$'/+4414'&54'('4'0%'2.#0722'4.'8'.*175'2.#05*190(14.1%#6+104'('4'0%'10.; #%67#..#;176/#;$'/+4414'&54'('4'0%'2.#02#46+#..19'4.'8'.*175'2.#05*190(14.1%#6+104'('4'0%'10.; #%67#..#;176/#;$'/+4414'&54'('4'0%'2.#09CUJDWTP'*/QFGN''NGXCVKQP/KPPGUQVC%QPUVTWEVKQP#RTKNÄÄ0KEM*CPUQP Ä(6$4#%'&9#...+0' Ä(6 Ä(6 Ä(6$4#%'&9#...+0' Ä(6 Ä(6 Ä(6 Ä(6$4#%'&9#...+0'$4#%'& 9#...+0' Ä(6 Ä(6 Ä(6 Ä(6 Ä(6 Ä(6 Ä(6 Ä(6 Ä(6 Ä(6$4#%'&9#...+0'$4#%'& 9#...+0' Ä(6$4#%'& 9#...+0' $4#%'& 9#...+0'$4#%'&9#...+0'$4#%'&9#...+0'$4#%'&9#...+0'$4#%'&9#...+0' Ä(6 Ä(6 Ä(6 Ä(6 Ä(6 Ä(6 Ä(6 Ä(6 Ä(6126+10#.9+0&195 Ä(6 Ä(6 Ä(6 Ä(6 Ä(6126+10#.9+0&19$4#%'&9#...+0' Ä(6 Ä(6%105647%62146#.(4#/'#55*190+05 Ä(6 Ä(6%105647%62146#.(4#/'#55*190+05$4#%'&9#...+0' Ä(6 Ä(6$4#%'&9#...+0'$4#%'&9#...+0' Ä(6 Ä(6 Ä(6 Ä(6 Ä(6 Ä(6 Ä(6 $4#%'& 9#...+0')#4#)'$7/2176126+10#$18' #%67#..#;176/#;$'/+4414'&Ä56#..)#4#)'126+10#$18' #%67#..#;176/#;$'/+4414'&%105647%62146#.(4#/'#55*190+05 &CVG4GXKUKQP2TQLGEV0WODGT&CVG55JGGVUQH2TKPV0COG5KIPGF.KEGPUG0WODGT&CVG+JGTGD[EGTVKH[VJCVVJKURNCPURGEKHKECVKQPQTTGRQTVYCURTGRCTGFD[OGQTWPFGTO[FKTGEVUWRGTXKUKQPCPFVJCV+COCFWN[.KEGPUGF2TQHGUUKQPCN'PIKPGGTWPFGTVJGNCYUQHVJG5VCVGQH/KPPGUQVC-KNOGT.CPG05WKVG2N[OQWVJ/06GNÄÄYYYJCPUQPITQWROPEQO$4#%'&9#..2#0'.(#56'0$1661/2.#6'61,1+56$.1%-+0)Y F0#+.5'8'4;1%%#06+.'8'4'&(.114,1+56$;5722.+'4(4#/'9#..$4#%'&9#..2#0'.$'.19$.1%-+0)$'69''0,1+565#5(1..195x(.#6Z612 $1661/14,1+56/#6'4+#.145#90$.1%-+0)x2.;911&5*''60#+.'&61ZUY F0#+.5612 $1661/x%+4%7.#4*1.'7261/#;$'%76+061%'06'41(2.;911&0#+.(.1145*'#6*+0)61$.1%-+0)YF0#+.5"1%(#56'0$1661/ZY F0#+.5'8'4;1%5'%6+105#6$4#%'&9#..2#0'.5#$18'%#06+.'8'4'&(.114(4#/+0).GPPCT%QTRQTCVKQPVJ#XG05WKVG2N[OQWVJ/0&GUETKRVKQP%12;4+)*6*#0510)4172..%5(4#/+0)&'6#+.)#4#)'(41062146#.(4#/'016'+0(1#22.+'55;//'64+%#..;#%4155&'6#+.Ä01661':%''&Ä(#56'06122.#6'61*'#&'4Y 4195F5+0-'40#+.5"1% Z$'#4+0)567& Z(7..*'+)*6567&'#%*'0&1(*'#&'4.1%#6'2#0'.,1+069+6*+0Ä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Ä%106+07175.5..8.*'#&'46157221468'46+%#..1#&5$;5722.+'4 /+09+&6* /+0&'26*4'3&Ä016'5'%6+1010.;#22.+'59*'0$4#%'&9#..2#0'.5#4'.1%#6'&#$18'(.114%#06+.'8'45''2.#0(14#22.+%#$+.+6;#.6'40#6'*1.&190##.6'40#6'*1.&190$2156Ä+056#..'&*1.&190126+1055(4#/+0)&'6#+.752*66*1.&190#0%*14#6.1%#6+1055*1900#+.'&61&17$.'567&5 Z.10)5+/25106+6'0*&5%4'9Ä+0#0%*14+061%10%4'6'752/56%/564#2#6.1%#6+1055*1900#+.'&61&17$.'567&5 Z%10%4'6'5%4'95 6#2%106+6'014'37+8+061(170+10%10%4'6'(170+10$'.19#.6'40#6'$*1.&1905#4'61*#8'%14415+102416'%6+10$;16*'45+(75'&+0#0':6'4+14#22.+%#6+10':215'&616*''.'/'0655(4#/+0)&'6#+.9CUJDWTP'*/QFGN#NN'NGXCVKQPU/KPPGUQVC%QPUVTWEVKQP#RTKNÄÄ0KEM*CPUQPÄÄ.'0)6*1(%106+07175*'#&'4Ä(#56'06122.#6'61*'#&'4Y 4195F5+0-'40#+.5"1% Z$'#4+0)567& Z(7..*'+)*6567&.1%#6'2#0'.,1+069+6*+0Ä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Ä #0%*14$1.65 /+0'/$'&YZZ2.#6'9#5*'45ÄÄ.'0)6*1(%106+07175*'#&'4Ä(#56'06122.#6'61*'#&'4Y 4195F5+0-'40#+.5"1% Z$'#4+0)567& Z(7..*'+)*6567&.1%#6'2#0'.,1+069+6*+0Ä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Ä #0%*14$1.65 /+0'/$'&YZZ2.#6'9#5*'45 Z$'#4+0)567& Z(7..*'+)*6567&525.%1.7/0(14)+4&'464755$;5722.+'45(4#/+0)&'6#+.)#4#)'(41062146#.(4#/'016'+0(1#22.+'55;//'64+%#..;#%4155&'6#+.70.'55016'&5*190)#4#)'(41062146#.(4#/'016'+0(1#22.+'55;//'64+%#..;#%4155&'6#+.70.'55016'&5*190 40,000 X X 40,000 1360 40,000 3000 3000 1360 3000 .45 .45 .55 40,000 40,000 13.33 13.33 .62 7.3 3.1 66000 NR 280 415 415 4872 730 730 188 94 19056 Iden Avenue Date Certificate Posted X Passive (No Fan ) Active (With fan and monometer or other system monitoring device) Location (or future location) of Fan: Other Please Describe Here X R-15 X X R-20 X R-20 X R-20 X R-49 X R-49 X R-30 X R-30 X X Not applicable, all ducts located in conditioned space X Not required per mech. code Passive Powered Interlocked with exhaust device. Describe: Input in BTUS:66,000 Capacity in Gallons:Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code X Passive X Low: Other, describe: Low: Location of fan(s), describe: Cfm's 6 " round duct OR " metal duct Balanced Ventilation capacity in cfms:Mech Room Capacity continuous ventilation rate in cfms: Total ventilation (intermittent + continuous) rate in cfms: 94 High: Energy Recover Ventilator (ERV) Capacity in cfms:High: Location of duct or system: Below Entire Slab Foundation Wall Perimeter of Slab on Grade Rim Joist (1st Floor) Rim Joist (2nd Floor+) Wall Ceiling, flat Interior R5 + R10 Exterior Interior Interior New Construction Energy Code Compliance Certificate Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.2/3/2021 Mailing Address of the Dwelling or Dwelling Unit City Lakeville19056 Iden Avenue Name of Residential Contractor MECHANICAL VENTILATION SYSTEM Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): Combustion Air Select a Type Select Type Heat Recover Ventilator (HRV) Capacity in cfms:188 MN License Number Lennar 1413 THERMAL ENVELOPE RADON CONTROL SYSTEM Type: Check All That Apply Insulation Location Total R-Value of all Types of InsulationNon or Not ApplicableFiberglass, BlownFiberglass, BattsFoam, Closed CellFoam Open CellMineral FiberboardRigid, Extruded PolystyreneRigid, IsocynurateResidential Load Calculation Heating Loss Heating Gain Cooling Load 57,936 27,347 32,619 13 Location of duct or system: Rating or Size 50 Output in Tons:3 Efficiency SEER /EER Nat Gas Nat Gas Elect GPVL-50 13ACXN-036 Fuel Type Manufacturer Lennox AOSmith Lennox Model ML193UH070XE36 Average U-Factor (excludes skylights and one door ) U: 0.31 Solar Heat Gain Coefficient (SHGC):0.29 R-value MECHANICAL SYSTEMS Make-up Air Select a Type Appliances Heating System Domestic Water Heater Cooling System Duct system air tightness: Heating or Cooling Ducts Outside Conditioned Spaces Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Describe other insulated areas Building envelope air tightness: Windows & Doors 000000Builders Associaton of Minnesota version 101014 NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit (NPDES Construction Stormwater Permit, MPCA) ruction site at least once every seven (7) days during active con (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 02/12/21 X KP