Loading...
HomeMy WebLinkAboutLA188685 �. A � g�s� �s , . , Manufactured Home Svstems Test Affidavit This form must be completed in its entirety and be submitted at the Building Final inspection for the installation of a manufactured home. Ail tests must be completed and signed off on this form. A certificate of occupancy wili not be issued until this completed form is received. �,,;�%�i� � � ��.��� 1 �,� ���y ��.. SYSTEMS TEST VERIFICATION Description Date Passed Signature of Tester Drain Line: Pursuant to CFR 3280.612(b) Datert�, '%c�-Z'i /� ��-� Print Name of Tester and Company: �,C,� ������ �'�l ������ ., f .. %7 _ `� � Water Line: Pursuant to CFR 3280.612(a) Date:� ,.��, _�, � � �- j Print Name of Tester and Com an : � " / /'' _- �. � P v ��� �ow\�� �,��c� 4.��� . ,� FIXtUt'@ T@St: Pursuant to CFR 3280.612(c) Date:�;� i(� -�i � � ---� Print Name of Tester and Company: ' � -f' /�^� � ` � ,�c�:�\�.�.�-�� �\�::.cl� ��;����.'�,� GaS TeSt: Pursuant to CFR 3280.705 and IFGC 406.4 i Date: i Print Name of Tester and Company: Electrical Operational: Pursuant to CFR 3285.702 �ate: Print Name of Tester and Company: Electrical Polarity: Pursuant to CFR 3285.702 Date: Print Name of Tester and Company: Electrical Continuity: Pursuant to CFR 3285.702 Date: Print Name of Tester and Company: Smoke Alarm Test: Pursuanc to CFR 32aozos �ate: I Print Name of Tester and Company: I certify the above systems testing has been completed and was found to be in compliance with the provisions identified for each � systems test � �f�, �� / Q . i nature: -� �- '`-� �J✓' �j�-(0� Date`" ..rC> �i � �, � �� � � � � a} � I I Manufactured Home Svstems Test Affidavit fhis form must be completed in its entirety and be submitted at the Building Final inspection for the install�tion cf a nanufactured home. All tests must be completed and signed off on this form. A certificate of occupancy will not be ssued until this completed form is received. �J/,,, � ���j ��� ��/�, �� / lC C � � ^ SYSTEMS TEST VERIFICATtON ' j --- � � Descripfion � Date Passed � Signatw e of Tester � �i Drain Line: Pursua�to cFR s2so.s�2�b) �ate: ' �rint Name of Tester and Company: � � �'� W2t�LIf1e: Pursuant to CFR 3280.612(a) � Date: I ' ---�� �rirrt Name of Tester a�d Company: I FIXttJf@ TeSt� Pursuant to CFR 3280.612(c) Date: � I Print Name of Tester and Company: � G2S T@S� Pursuartt to CFR 3280.705 and lFGC 406.4 Date:� - �� - �.� �- -.� -=� , � ; Print Name of 7ester and Company:��� �u�C C�.� ���)� � �.-�1�ny� �(,�,, EI@CtrIG3) OpG�lO�tal: Pursuant to CFR 3285.702 ( Date: � �rint Name of l"ester and Company: EleCtriC11 P013fity: Pursuant to CFR 3285.702 Date: � _ ( �rint Name of Tester and Company: - ��e�� � =1�Cd'IG31 COtttlituity: Pursuant to CFR 3285_702 �ate: 1 i 'rirrt Name of Tester a�d Company: 3t770ke Alat'm Test Pursuant ba CFR 328Q208 Date: � - - ; 'rirrt Name of Tester ar►d Cornpany � certify the above syster»s testing h�been compl�ted and was found to be in c�rnPliance with the provisions identified for each � :ystBtrls te5t: � _ I > � -.� ` �I i �� -� � � � � iignabure: D2te� �