Loading...
HomeMy WebLinkAbout18316 Hamel Drive Survey1. Bearings are based on the recorded plat.2. Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3. No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4. No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5. Proposed grades shown were taken from the grading &/ordevelopment plan prepared by Westwood Professional Services, Inc.6. Grading plan date/revision date: October 5, 20207. Plan No. F422-C 'CLIFTON'NOTESLot 5, Block 10, PINNACLE RESERVE AT AVONLEA, Dakota County, MinnesotaPROPERTY DESCRIPTION18316 Hamel Drive, Lakeville, MinnesotaPROPERTY ADDRESSSURVEYOR'S CERTIFICATETop nut of hydrant located at Lot 1, Block 8 = 1022.11BENCHMARKDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationPHONE: 952.890.6044 www.jrhinc.com PLANNERS / ENGINEERS / SURVEYORS CERTIFICATE OF SURVEY FORDRAWN BYDATEREVISIONSPLM/NDGCAD FILEPROJECT NO.SHEET 1 OF 1Lot 5, Block 10, PINNACLE RESERVE AT AVONLEA, Dakota County, MinnesotaI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 2nd day of Febuary, 2021Marcus F. Hampton, MN L.S. No. 474812/2/2021410145.dwg4101452999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306ProposedGarage Floor @ Front = 1026.8Garage Top of Block = 1027.2House Top of Block = 1027.2Lowest Floor = 1019.2FLOOR ELEVATIONSLot = 7,955 sq. ft.House/Garage = 2,328 sq. ft.Porch = 97 sq. ft.Driveway = 456 sq. ft.Sidewalk = 24 sq. ft.Patio = 165 sq. ft.Total Impervious = 3,070 sq. ft. or 38.6% of lotHARD COVER CALCULATIONS*Draint i le connec t ion requ ired .ENGINEERING REVIEWEDDate:__________________03/02/2021lvlasatyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATIONPlanning DepartmentApprovedDate:__________________03/05/2021dmorey