HomeMy WebLinkAbout19013 Inndale Drive SURVEYZoning = RS-3The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATIONENGINEERING REVIEWEDDate:__________________03/02/2021lvlasaty#1323 Black Cherry on site#1324 Boxelder, two stems 8"&11" dbh condition is now POOR.