Loading...
HomeMy WebLinkAboutLA188223 - 17890 Fielding Court Wyssling Consulting 76 North Meadowbrook Drive Alpine, UT 84004 Scott E. Wyssling, PE, PP, CME office (201) 874-3483 swyssling@wysslingconsulting.com February 5, 2021 Everlight Solar Construction PO Box 930550 Verona, WI 53593 Re: Engineering Services Terpening Residence 17890 Fielding Court, Lakeville, MN 7.124 kW System To Whom It May Concern: Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site Visit/Verification Form prepared by an Everlight Solar representative identifying specific site information including size and spacing of rafters for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information was prepared by Everlight Solar and will be utilized for approval and construction of the proposed system. 3. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is typical wood framing construction with the roof system consisting of truss system with all chords constructed of 2 x 4 dimensional lumber at 24” on center. The attic space is unfinished and photos indicate that there was free access to visually inspect the size and condition of the roof rafters. All wood material utilized for the roof system is assumed to be Doug-Fir #2 or better with standard construction components. The existing roofing material consists of composite asphalt shingles. Photos of the dwelling also indicate that there is a permanent foundation. A. Loading Criteria Used • 115 MPH wind loading based on ASCE 7-16 Exposure Category “C” at a slope of 26 degrees • 7 PSF = Dead Load roofing/framing Live Load = 20 PSF Snow Load = 50 PSF • 3 PSF = Dead Load solar panels/mounting hardware Total Dead Load =10 PSF The above values are within acceptable limits of recognized industry standards for similar structures in accordance with the Minnesota Residential Code (2018 IRC). Analysis performed of the existing roof structure utilizing the above loading criteria indicates that the existing rafters will support the additional panel loading without damage, if installed correctly. Page 2 of 2 B. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent “IronRidge Solar Installation Manual”, which can be found on the IronRidge Solar website (http://ironridgesolar.com/). If during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. Maximum allowable pullout per lag screw is 235 lbs/inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications for Doug-Fir (North Lumber) assumed. Based on our evaluation, the pullout value, utilizing a penetration depth of 2 ½”, is less than what is allowable per connection and therefore is adequate. Based on the variable factors for the existing roof framing and installation tolerances, using a thread depth of 2 ½” with a minimum size of 5/16” lag screw per attachment point for panel anchor mounts should be adequate with a sufficient factor of safety. 3. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be placed no greater than 48” o/c. 4. Panel supports connections shall be staggered to distribute load to adjacent trusses. Based on the above evaluation, it is the opinion of this office that with appropriate panel anchors being utilized the roof system will adequately support the additional loading imposed by the solar panels. This evaluation is in conformance with the Minnesota Residential Code (2018 IRC), current industry standards, and is based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. Very truly yours, Scott E. Wyssling, PE Minnesota License No. 57927 SITE INFORMATION: Kevin Terpening 17890 Fielding Ct, Lakeville, MN 55044 MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC Lat, Long: 44.6904771 , -93.188734 (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERSCONTRACTOR INFORMATION:Everlight Solar ConstructionPO Box 930550Verona, WI 53593License# DCQ-111802116833.786.4387 ext. 701Dakota ElectricPV01 COVER PAGE PV02 PROPERTY PLAN PV03 ROOF PLAN PV04 ROOF ATTACHMENTS + BOM PV05 MOUNTING DETAIL PV06 ELECTRICAL DIAGRAM PV07 LABELS PV08 PLACARD PV09 SITE PHOTOS DATE: February 4, 2021 PV01 PAGE: SHEET NAME: COVER PAGE DRAWN BY: SoloCAD GENERAL NOTES: 1.INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM SHALL BE IN ACCORDANCE WITH NEC ARTICLE 690, AND ALL OTHER APPLICABLE NEC CODES WHERE NOTED OR EXISTING. 2.PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL COMPLY WITH NEC ARTICLE 110. 3.ALL WIRES, INCLUDING THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE IN ACCORDANCE WITH NEC ARTICLE 250 4.THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE; THIS SYSTEM IS UTILITY INTERACTIVE PER UL 1741 AND DOES NOT INCLUDE STORAGE BATTERIES OR OTHER ALTERNATIVE STORAGE SOURCES. 5.ALL DC WIRES SHALL BE SIZED ACCORDING TO [NEC 690.8] 6.DC CONDUCTORS SHALL BE WITHIN PROTECTED RACEWAYS IN ACCORDANCE WITH [NEC 690.31] 7.ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL JURISDICTIONAL BUILDING CODE. APPLICABLE GOVERNING CODES: DESCRIPTION OF DESIGN: INSTALLATION OF GRID -TIED, UTILITY INTERACTIVE PHOTOVOLTAIC SYSTEM AERIAL VIEW:STREET VIEW:SHEET INDEX: EQUIPMENT: MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERS RACKING: SolarRoofHook - 48" O.C. SITE SPECIFICATIONS: OCCUPANCY: R-3 ZONING: RESIDENTIAL 2020 NEC 2020 MRC 2020 MFC 2020 MBC STREET VIEW NOT AVAILABLE SITE INFORMATION: Kevin Terpening 17890 Fielding Ct, Lakeville, MN 55044 MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC Lat, Long: 44.6904771 , -93.188734 (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERSM MSP AC PV C JB JB CONTRACTOR INFORMATION:Everlight Solar ConstructionPO Box 930550Verona, WI 53593License# DCQ-111802116833.786.4387 ext. 701Dakota ElectricDATE: February 4, 2021 PV02 PAGE: SHEET NAME: PROPERTY PLAN DRAWN BY: SoloCAD SCALE: EQUIPMENT LEGEND: INVERTER VISIBLE, LOCKABLE, LABELED AC DISCONNECT METER SOCKET (FOR UTILITY PV METER) UTILITY METER MAIN SERVICE PANEL LC LOAD CENTER FIRE ACCESS PATHWAY (3' TYP) C INV PV AC MSP M COMBINER BOX PROPERTY LINE FRONT OF HOME 17890 Fielding Ct MP2 PITCH: 26° AZIMUTH: 135° MP1 PITCH: 26° AZIMUTH: 225° BATT BATTERY(IES) VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER1" = 36.43' 81'-6" 201'-1" 209'-7" 152'-2" SITE INFORMATION: Kevin Terpening 17890 Fielding Ct, Lakeville, MN 55044 MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC Lat, Long: 44.6904771 , -93.188734 (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERSM MSP AC PV C JB JBCONTRACTOR INFORMATION:Everlight Solar ConstructionPO Box 930550Verona, WI 53593License# DCQ-111802116833.786.4387 ext. 701Dakota ElectricMP2 PITCH: 26° AZIMUTH: 135° DATE: February 4, 2021 PV03 PAGE: SHEET NAME: ROOF PLAN DRAWN BY: SoloCAD EQUIPMENT LEGEND: INVERTER VISIBLE, LOCKABLE, LABELED AC DISCONNECT METER SOCKET (FOR UTILITY PV METER) UTILITY METER MAIN SERVICE PANEL LC LOAD CENTER FIRE ACCESS PATHWAY (3' TYP) C INV PV AC MSP M COMBINER BOX FRONT OF HOME MP1 PITCH: 26° AZIMUTH: 225° BATT BATTERY(IES) VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER ),5($&&(663$7+:$< 18" TYP AC C JB JB SITE INFORMATION: Kevin Terpening 17890 Fielding Ct, Lakeville, MN 55044 MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC Lat, Long: 44.6904771 , -93.188734 (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERSCONTRACTOR INFORMATION:Everlight Solar ConstructionPO Box 930550Verona, WI 53593License# DCQ-111802116833.786.4387 ext. 701EQUIPMENT INFORMATION: RAIL MANUFACTURER IronRidge RAIL PART NUMBER XR-10 ATTACHMENTS Quickbolt ATTACHMENT QTY 48 MIDCLAMP QTY 40 ENDCLAMP QTY 20 SPLICE QTY 4 ROOF INFO: ROOF TYPE asphalt_shingle ROOF FRAMING manufactured_truss RAFTER/TOP CHORD SIZE 2x4 RAFTER/TOP CHORD SPACING 24 ATTACHMENT SPACING 48Dakota ElectricDATE: February 4, 2021 PV04 PAGE: SHEET NAME: ROOF ATTACHMENTS + BOM DRAWN BY: SoloCAD ROOF ATTACHMENT COUNT:48 PV MODULE COUNT:25 ARRAY AREA:MODULE COUNT * 18.06ft² = 451.5 ROOF AREA:2716 ft² PERCENT OF ROOF COVERED:17% ARRAY WEIGHT:MODULE COUNT * 50lbs = 1250 DISTRIBUTED LOAD:ARRAY LBS/ATTACHMENTS = 26.04 POINT LOAD: (lbs/ft²)(ARRAY) WEIGHT/AREA = 2.77 lbs/ft² PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: 5$,/ /)227$77$&+0(17%5$&.(7 ( 522))5$0,1* 67$,1/(6667((//$*%2/7 :,7+0,1(0%('0(17 $1')/$7:$6+(5 )/$6+,1* 3902'8/( ( &2036+,1*/(522) /$<(5 5$,/ (1'&/$03 3902'8/( 0,'&/$03 3902'8/(  0,1 '(37+ 5$,/ 5$,/ )/$6+,1* /$*%2/7 2'-8" MIN - 3'-10" MAX  5$,/ 3902'8/( " MAX."1'-8" MAX.  FRONT VIEW 10" MIN - 1'-4" MAX2'-8" MIN - 3'-10" MAX 10" MIN - 1'-4" MAX SIDE VIEW ( 5$)7(5723&+25'6 ( 5$)7(5723&+25' DETAIL, MOUNTING AND FLASHING END CLAMP DETAILS MID CLAMP DETAILS   SITE INFORMATION: Kevin Terpening 17890 Fielding Ct, Lakeville, MN 55044 MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC Lat, Long: 44.6904771 , -93.188734 (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERSCONTRACTOR INFORMATION:Everlight Solar ConstructionPO Box 930550Verona, WI 53593License# DCQ-111802116833.786.4387 ext. 701EQUIPMENT INFORMATION: RAIL MANUFACTURER IronRidge RAIL PART NUMBER XR-10 ATTACHMENTS Quickbolt ATTACHMENT QTY 48 MIDCLAMP QTY 40 ENDCLAMP QTY 20 SPLICE QTY 4 ROOF INFO: ROOF TYPE asphalt_shingle ROOF FRAMING manufactured_truss RAFTER/TOP CHORD SIZE 2x4 RAFTER/TOP CHORD SPACING 24 ATTACHMENT SPACING 48Dakota ElectricDATE: February 4, 2021 PV05 PAGE: SHEET NAME: MOUNTING DETAIL DRAWN BY: SoloCAD ROOF ATTACHMENT COUNT:48 PV MODULE COUNT:25 ARRAY AREA:MODULE COUNT * 18.06ft² = 451.5 ROOF AREA:2716 ft² PERCENT OF ROOF COVERED:17% ARRAY WEIGHT:MODULE COUNT * 50lbs = 1250 DISTRIBUTED LOAD:ARRAY LBS/ATTACHMENTS = 26.04 POINT LOAD: (lbs/ft²)(ARRAY) WEIGHT/AREA = 2.77 lbs/ft² PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: UTILITY PV PRODUCTION METER BASE PV AC DISCONNECT FUSED, AIC 10kA VISIBLE, LOCKABLE, LABELED, OPEN 240V, 2-POLE (N) FUSES PV OCPD 4 4 4 (E) LOADS N G (E)GROUNDING ELECTRODE INTERCONNECTION NOTES 1. GROUND FAULT PROTECTION IN ACCORDANCE WITH [NEC 215.9] & [NEC 230.95] 2. SUPPLY SIDE INTERCONNECTION ACCORDING TO [NEC705.12(A)] WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH [NEC 240.21(B)] DISCONNECT NOTES 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS) 2. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH. 3. FUSED AC DISCONNECT TO BE USED. (E) MAIN SERVICE PANEL (E) MAIN BREAKER (E) 120/240 VAC TO UTILITY GRID SUPPLY SIDE CONNECTION: NEC 230.46, NEC 230.79, NEC 705.12(A). K4977-INT MILBANK LUG KIT TO BE ADDED J-BOX N G AC COMBINER BOXSOLAR LOADS ONLYUL 1741 COMPLIANT AC DC AC DCSTRING [1] AC DC AC DCSTRING [2] J-BOX (N) 100A (2) 20A-2P J-BOX 3 1 1 2 2 SITE INFORMATION: Kevin Terpening 17890 Fielding Ct, Lakeville, MN 55044 MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC Lat, Long: 44.6904771 , -93.188734 (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERSCONTRACTOR INFORMATION:Everlight Solar ConstructionPO Box 930550Verona, WI 53593License# DCQ-111802116833.786.4387 ext. 7011 2 3 4(1) 12-2 TC-ER, THWN-2, COPPER (OR CODE APPROVED EQUIVALENT) (1) 6 AWG BARE, COPPER (GROUND) (1) 10 AWG THWN-2, or THHN, or 10/2 NM-B COPPER - (POSITIVE) (1) 10 AWG THWN-2, or THHN, or 10/2 NM-B COPPER - (NEGATIVE) (1) 10 AWG THWN-2, or THHN, or 10/2 NM-B COPPER - (GROUND) (1) 3/4" LIQUID TIGHT OR EMT OR FMC (OR CODE APPROVED EQUIVALENT) (2) 10 AWG THHN/THWN-2, COPPER - (L1) (2) 10 AWG THHN/THWN-2 COPPER - (L2) (1) 10 AWG THHN/THWN-2 (GROUND) CONDUIT: 3/4" LIQUID TIGHT OR EMT (OR CODE APPROVED EQUIVALENT) (1) 6 AWG THWN-2 COPPER - (L1) (1) 6 AWG THWN-2 COPPER - (L2) (1) 6 AWG THWN-2 COPPER - (NEUTRAL) (1) 10 AWG THWN-2 COPPER - (GROUND) (1) CONDUIT: 3/4" LIQUID TIGHT OR EMT (OR CODE APPROVED EQUIVALENT) SERVICE EQUIPMENT & PV OCPD RATINGS MAIN BREAKER RATING 200A MAIN SERVICE BUS RATING 200A PV OCPD RATING 40A AC VOLTAGE 240V AC DISCONNECT RATING 60A STRINGS: STRING 1 14 PV MODULES STRING 2 11 PV MODULES Dakota ElectricDATE: February 4, 2021 PV06 PAGE: SHEET NAME: ELECTRICAL DIAGRAM DRAWN BY: SoloCAD WIRE SCHEDULE EQUIPMENT SCHEDULE: TYPE:QTY:DESCRIPTION:RATING: MODULES:(25)Silfab SIL-330 NL 330 W INVERTERS:(13)AP Systems YC600 548 W AC DISCONNECT(S):(1)PV AC DISCONNECT, 240V, 2-POLE 60 A GROUNDING & GENERAL NOTES: 1. PV INVERTER IS UNGROUNDED, TRANSFORMER-LESS TYPE. 2. DC GEC AND AC EGC TO REMAIN UNSPLICED, OR SPLICED TO EXISTING ELECTRODE 3. ANY EXISTING WIRING INVOLVED WITH PV SYSTEM CONNECTION THAT IS FOUND TO BE INADEQUATE PER CODE SHALL BE CORRECTED PRIOR TO FINAL INSPECTION. 4. JUNCTION BOX QUANTITIES, AND PLACEMENT SUBJECT TO CHANGE IN THE FIELD - JUNCTION BOXES DEPICTED ON ELECTRICAL DIAGRAM REPRESENT WIRE TYPE TRANSITIONS. 5. AC DISCONNECT NOTED IN EQUIPMENT SCHEDULE OPTIONAL IF OTHER AC DISCONNECTING MEANS IS LOCATED WITHIN 10' OF SERVICE DISCONNECT. LOAD SIDE LINE SIDE SITE INFORMATION: Kevin Terpening 17890 Fielding Ct, Lakeville, MN 55044 MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC Lat, Long: 44.6904771 , -93.188734 (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERSCONTRACTOR INFORMATION:Everlight Solar ConstructionPO Box 930550Verona, WI 53593License# DCQ-111802116833.786.4387 ext. 701LABEL VALUES: DESCRIPTION VALUE: DC IMP:9.92 DC VMP:33.3 DC VOC:40.5 DC ISC:SEE DATASHEET DC SYSTEM SIZE (W):8250 AC OPERATING CURRENT:SEE DATASHEET AC VOLTAGE:240 Dakota ElectricDATE: February 4, 2021 PV07 PAGE: SHEET NAME: LABELS DRAWN BY: SoloCAD LABEL 6 MARKED AT AC DISCONNECTING MEANS. [NEC 690.54] LABEL 5 EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES SHALL BE MARKED TO INDICATE THE PRESENCE OF ALL SOURCES.[NEC 705.12(B)(2)(3)(c)] LABEL 3 PLACED ADJACENT TO THE BACK-FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(B)(2)(3)(c)] *ELECTRICAL DIAGRAM SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON THE ELECTRICAL DIAGRAM PAGE. JUNCTION BOX OR COMBINER BOX MAIN SERVICE PANEL AC DISCONNECT EXISTING SUB PANEL (IF WHERE POINT OF INTERCONNECTION IS MADE) PV COMBINER SUBPANEL - IF USED TO COMBINE PV OUTPUT CIRCUITS AC DC INVERTER (S) INTEGRATED DC DISCONNECT 2 8 6 9 5 (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER)7 1 1 1 5 (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER)7 3 LABELING DIAGRAM: LABEL 7 AT DIRECT-CURRENT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF JUNCTION BOXES, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 10FT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS. [NEC 690.31(D)(2)] LABEL 9 SIGN LOCATED ON OR NO MORE THAN 3FT FROM INITIATION DEVICE [NEC 690.56(C)(2)]. LABEL 8 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(A)] LABEL 1 PLACED ON THE MAIN DISCONNECTING MEANS FOR THE PV SYSTEM. [NEC 690.13(B)] LABELING NOTES: 1.LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2.LABELING REQUIREMENTS BASED ON THE 2020 NATIONAL ELECTRIC CODE, OSHA STANDARD 19010.145, ANSI Z535. 3.MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 4.LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED [NEC 110.21] 5.LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND; REFLECTIVE, AND PERMANENTLY AFFIXED [IFC 605.11.1.1] 3 4 1 LABEL 4 PLACED ON EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES [NEC 705.10(C)] 2 3 4 1 ## ### LABEL 2 FOR PV DISCONNECTING MEANS WHERE THE LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION. [NEC 690.13(B)] M MSP AC PV C JB JB SITE INFORMATION: Kevin Terpening 17890 Fielding Ct, Lakeville, MN 55044 MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC Lat, Long: 44.6904771 , -93.188734 (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERSCONTRACTOR INFORMATION:Everlight Solar ConstructionPO Box 930550Verona, WI 53593License# DCQ-111802116833.786.4387 ext. 701Dakota ElectricPOWER TO THIS BUILDING IS ALSO SUPPLIED FROM ROOF MOUNTED SOLAR ARRAYS WITH SAFETY DISCONNECTS AS SHOWN: CAUTION DIRECTORY PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM. (ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS OUTLINED WITHIN: NEC 690.56(B)&(C), [NEC 705.10]) DATE: February 4, 2021 PV08 PAGE: SHEET NAME: PLACARD DRAWN BY: SoloCAD 17890 Fielding Ct, Lakeville MN 55044 FRONT OF HOME PV ARRAY MAIN DISTRIBUTION UTILITY DISCONNECT RAPID SHUTDOWN AC DISCONNECT SWITCH SYSTEM UTILIZES MICROINVERTERS LOCATED UNDER EACH SOLAR MODULE SITE INFORMATION: Kevin Terpening 17890 Fielding Ct, Lakeville, MN 55044 MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC Lat, Long: 44.6904771 , -93.188734 (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERSCONTRACTOR INFORMATION:Everlight Solar ConstructionPO Box 930550Verona, WI 53593License# DCQ-111802116833.786.4387 ext. 701Dakota ElectricDATE: February 4, 2021 PV09 PAGE: SHEET NAME: SITE PHOTOS DRAWN BY: SoloCAD SITE PHOTOS: SITE INFORMATION: Kevin Terpening 17890 Fielding Ct, Lakeville, MN 55044 MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC Lat, Long: 44.6904771 , -93.188734 (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERSCONTRACTOR INFORMATION:Everlight Solar ConstructionPO Box 930550Verona, WI 53593License# DCQ-111802116833.786.4387 ext. 701Dakota ElectricDATE: February 4, 2021 PV09.1 PAGE: SHEET NAME: SITE PHOTOS DRAWN BY: SoloCAD SITE INFORMATION: Kevin Terpening 17890 Fielding Ct, Lakeville, MN 55044 MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC Lat, Long: 44.6904771 , -93.188734 (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERSCONTRACTOR INFORMATION:Everlight Solar ConstructionPO Box 930550Verona, WI 53593License# DCQ-111802116833.786.4387 ext. 701Dakota ElectricDATE: February 4, 2021 PV09.2 PAGE: SHEET NAME: SITE PHOTOS DRAWN BY: SoloCAD SITE INFORMATION: Kevin Terpening 17890 Fielding Ct, Lakeville, MN 55044 MAX CONTINUOUS AC SYSTEM SIZE: 7.124 kW AC DC SYSTEM SIZE: 8.25 kW DC Lat, Long: 44.6904771 , -93.188734 (25) Silfab SIL-330 NL PV MODULES (13) AP Systems YC600 INVERTERSCONTRACTOR INFORMATION:Everlight Solar ConstructionPO Box 930550Verona, WI 53593License# DCQ-111802116833.786.4387 ext. 701Dakota ElectricDATE: February 4, 2021 PV09.3 PAGE: SHEET NAME: SITE PHOTOS DRAWN BY: SoloCAD THESE SHEETS, DESIGNS, AND SPECS ARE PROPERTY OF SUN INCORPORATED. NO PART SHALL BE DUPLICATED OR USED FOR NONE OTHER THAN ITS SPECIFIC PROJECT WITHOUT WRITTEN CONSENT FROM SUN INCORPORATED.MOUNT SHEETSheet: 5File: SUN-SERVERSun Incorporated Jos MasterEuipmentMOUNTSQUICK MOUNTQMPV-datasheet-QMHSS-LS-QuicHooSM-we.pdMissing or invalid reerenceSheet: 2File: SUN-SERVERSun Incorporated Jos MasterEuipmentMOUNTSQUICK MOUNTQMPV-datasheet-QMHSS-LS-QuicHooSM-we.pdMissing or invalid reerence Brand Name:Milbank Type:Wire Connector Kit Application:Metering Accessory Standard:UL Listed Connection:Mechanical Conductor Range:12 to 1/0 Awg Number Of Conductors: 0 Material:Aluminum Insulation:None Temperature Rating:75 Degrees Celsius Mounting:Slide Nut Consist Of:Slide Nut, Set Screw, Connector Utility requirements may vary. Always consult the serving utility for their requirements prior to ordering or installing this equipment. This product must always be installed by a licensed electrician. Installation of this equipment may require local electrical inspector approval. milbankworks.com K4977-INT 100A CONN AND SLIDE 784572274365 Catalog Number: Item Description: UPC Code: