HomeMy WebLinkAboutLA189843 19779 Henning Ave Permit PackRESIDENTIAL BUILDING
PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
__________________
Permit Number
___________________
Received By
___________________
Date Received
___________________
Fee Total
SITE ADDRESS:
MAILING ADDRESS: CITY: STATE: ZIP:
JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________
LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________
ESTIMATED VALUATION: PROPOSED START DATE: END DATE:
(New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION:
APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL
NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED)
PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License)
RESIDENT OWNER
NAME:_______________________________________________________________________________
HOME PHONE #:_____________________________ CELL PHONE:___________________________
GENERAL CONTRACTOR
Homeowner
Contractor
CONTRACTOR:_______________________________________________________________________
LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE)
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
PLUMBING WORK
Homeowner
Contractor
CONTRACTOR:__________________________________________LICENSE #: PM______________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
MECHANICAL WORK
Homeowner
Contractor
CONTRACTOR:________________________________________ _______________________________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
BOND #:_______________________________________ EXPIRATION DATE____________________
SEWER/WATER CONTRACTOR
New Construction Only
NAME:________________________________________________ ______________________________
HOME PHONE _____________________________ CELL PHONE:______________________________
BOND #:_______________________________________ EXPIRATION DATE____________________
INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE
ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY
APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND
ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND
WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START
WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN.
NAME OF APPLICANT (Please Print)DATE
APPLICANT’S SIGNATURE:
www.lakevillemn.gov
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
20195 Holyoke Avenue, Lakeville, MN 55044
952-985-4400 952-985-4499 fax
www.lakevillemn.gov
Sewer & Water Tie Card
Address:________________________________________
Contractor:______________________________________
Permit Number:__________________________________
Final Date:________________
Street Drain-Tile:______
Size of Water Service: 1”
Comments: AIRTEST SANITARY OVER 20’/2 FITTINGS
THIS CARD MUST BE COMPLETED AND ON-SITE AT TIME
OF SEWER & WATER INSPECTION
Concept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode04/19/2021dmathews
SmokeSmokeCOUFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.Sill plates fastened to concretew/ 1/2" anchor bolts 4' O.C. and1' form all ends and openings onall exterior walls and shear walls. Rims fastened to plates w/ A35clips 4' O.C. and 1' from all endsand openings. Sills on floorsystem fastened to rims w/ (1)row of 16d nails 3" O.C.
Verify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.CS-PFHold-downCS-PFCS-PFCS-PFHold-downHold-downHD-1Hold-downHD-1Hold-downHD-1Hold-downHD-1Hold-downSmoke(2)11-7/8" LVL perengineering for portal frame.HD-1Hold-downSolid blocking req'd between trusses w/(1) A35 clip fastened to top plate w/ 8d x1 12" nails 6' O.C. and 1' from ends.Fasten sill plate to blocking w/ (1) row of16d nails 4" O.C.Solid blocking req'd between roof trusses(up to 12" tall) w/ (1) A35 clip fastened totop plate w/ 8d x 1 12" nails 6' O.C. and 1'from ends. 2" air gap req'd at top. Upliftprevention of roof trusses by manufacturer.Solid blocking between trusses fastenedto blocking w/ (2) rows (staggered) of16d nails 8" O.C.Fasten roof sheathing to trusses w/ 8d nails6" O.C. at all edges and blocking and 12" inthe field w/ all seams blocked solids
Fa w 2x4"x4"Detail 1: Transfer DiaphragmBW1:(1) 2x6" SPF #2 or better 16" O.C. w/ 7/16" OSBfastened to studs and plates w/ 8d nails 6" O.C.at all edges and 12" O.C. in the field. Shear panel w/ (1) 2x6" SPF #2 or better 16" O.C. w/7/16" OSB fastened to studs and plates w/ 8d nails 6"O.C. at all edges and 12" O.C. in the field w/ solidblocking at all seams.ShearPanelShearPanelShearPanelShearPanelSW2 w/ (1) 2x6" SPF #2 or better16" O.C. w/ gyp board fastend w/#9 screws 7" O.C. at all edgesand 7" O.C. in the field w/ solidblocking at all seamsBWPsAbove
Temper ifwithin 60" oftub floor.Verify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).HD-2 StrapHD-2 StrapSmokeSmokeSmokeSmokeSmokeCOBW1:(1) 2x6" SPF #2 or better 16" O.C. w/ 7/16" OSBfastened to studs and plates w/ 8d nails 6" O.C.at all edges and 12" O.C. in the field. ShearPanelShearPanelHD-2 StrapShear panel w/ (1) 2x6" SPF #2 or better 16" O.C. w/7/16" OSB fastened to studs and plates w/ 8d nails 6"O.C. at all edges and 12" O.C. in the field w/ solidblocking at all seams.2" Air GapSolid blocking req'd between rooftrusses (up to 12" tall) w/ (1) A35 clipfastened to top plate w/ 8d x 1 12" nails 6'O.C. and 1' from ends. Uplift preventionof roof trusses by manufacturer.d plates per manufacturer instructions.Detail 2:Blocking at roof trusses w/ up to 12" heel.Wall Bracing OnlyFrameSection 2x4"
2x4"2x4"2x4"Fasten shear panels totrusses w/ (2) 16d nailsto top chords of trussesFasten 716" OSB to all2x w/ 8d nails 4" O.C.Fasten each shearpanel to plate w/ (1)row of 16d nails 4" O.C. 2" gap tosheathingFasten shear panels to trussesw/ (2) 16d nails to bottomchords of trussesRoof truss
Roof truss
Top plate*All hard manufac Simpson Detail 1:Blocking at roof trusses w/ heel over 12"
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.WILLIAM A. BECKLIN, P.E. DATE: APRIL 12, 2021 LIC. NO. 18494Portal Frame (1/S4)w/ 1' (min) panels.Sill plates fastened to concrete w/ 1/2" anchor bolts 4' O.C. and 1' formall ends and openings on all exterior walls and shear walls. Rims fastened to plates w/ A35 clips 4' O.C. and 1' from all ends and openings. Sills on floor system fastened to rims w/ (1) row of 16d nails 3" O.C. *All hardware is manufactured by Simpson Strong Tie.Structural Braced Wall Details Provided by:Becklin & Whitney Consulting Engineers, Inc139 1st Ave. E. Ste 200P.O. Box 471Cambridge, MN 55008763.689.5631S1 of 5Portal Frame (1/S4) HD1HD1HD1HD1HD18' (min)8' (min)8' (min)8' (min)Shear panel w/ (1) 2x6" SPF #2 or better 16" O.C. w/ 7/16" OSB fastenedto studs and plates w/ 8d nails 6" O.C.at all edges and 12" O.C. in the field w/ solid blocking at all seams.SW2 w/ (1) 2x6" SPF #2 or better16" O.C. w/ gyp board fastend w/#9 screws 7" O.C. at all edges and 7" O.C. in the field w/ solid blocking at all seamsBlocking at cant per 2/S5Transfer Diaphragmper 1/S5(2) 2x12" (min)headerWall Bracing OnlyWall Bracing At:19779 Henning AveLakeville, MNSW1:(1) 2x6" SPF #2 or better 16" O.C. w/ 7/16" OSBfastened to studs and plates w/ 8d nails 6" O.C. at all edges and 12" O.C. in the field.
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.WILLIAM A. BECKLIN, P.E. DATE: APRIL 12, 2021 LIC. NO. 18494Structural Braced Wall Details Provided by:Becklin & Whitney Consulting Engineers, Inc139 1st Ave. E. Ste 200P.O. Box 471Cambridge, MN 55008763.689.5631S2 of 5HD2HD24' (min)BW1:(1) 2x6" SPF #2 or better 16" O.C. w/ 7/16" OSBfastened to studs and plates w/ 8d nails 6" O.C. at all edges and 12" O.C. in the field. Shear panel w/ (1) 2x6" SPF #2 or better 16" O.C. w/ 7/16" OSB fastened to studs and plates w/ 8d nails 6" O.C. at all edges and 12" O.C. in the field w/ solid blocking at all seams.8' (min)HD2Wall Bracing OnlyWall Bracing At:19779 Henning AveLakeville, MNRims fastened to plates w/ A35clips 6' O.C. and 1' from all ends and openings. Sills on floor system fastened to rims w/ (1) row of 16d nails 3" O.C.
Foundation and Footing by othersFoundation and Footing by othersFull height rim w/ A35 clips w/ 8d x 1 1/2" nails 6' O.C. and 1' from ends or floor truss blocking req'd betwen floor trusses. Fasten sills to rim w/ (1) row of 16d nails 4" O.C. Blocking per 2/S5 req'dat cantilever.Roof truss blocking per 1/S4I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.WILLIAM A. BECKLIN, P.E. DATE: APRIL 12, 2021 LIC. NO. 18494Structural Braced Wall Details Provided by:Becklin & Whitney Consulting Engineers, Inc139 1st Ave. E. Ste 200P.O. Box 471Cambridge, MN 55008763.689.5631S3 of 5Wall Bracing OnlyWall Bracing At:19779 Henning AveLakeville, MN
Fasten sheathing to LVLw/ 8d nails in a 3"x3" gridFasten sheathing to studs/ platesand blocking w/ 8d nails 3" O.C.1'-8" minSimpson LSTA 49 w/ 10d x1-1/2nails to inside face of wallSimpson HDU2-2.5 hold down w/(6) 14"x2-1/2" Simpson SDS screwsand (1) 58"x16" bent anchor rod.Blocking at sheathingseams716" OSBLSTA 49 fastened toinside of wall w/ 10d x1-1/2" nailsPlates fastened tobeam w/ (2) rows of10d x 3" nails 3" O.C.12"x14" bent anchor bolt w/2x2"x316" plate washer1'-8" min(2) 1.75x11.875" 1.9E LVL (min) Figure 1: Portal FrameSection Clear span (2) 2x6" (min)1⁄2" min.fromcorner#4 rebarrequiredNailedportionCl
ear span17"
max.2" Air GapSolid blocking req'd between rooftrusses (up to 12" tall) w/ (1) A35 clipfastened to top plate w/ 8d x 1 12" nails 6'O.C. and 1' from ends. Uplift preventionof roof trusses by manufacturer.2x4"
2x4"2x4"2x4"Fasten shear panels totrusses w/ (2) 16d nailsto top chords of trussesFasten 716" OSB to all2x w/ 8d nails 4" O.C.Fasten each shearpanel to plate w/ (1)row of 16d nails 4" O.C. 2" gap tosheathingFasten shear panels to trussesw/ (2) 16d nails to bottomchords of trussesRoof truss
Roof truss
Top plateS4 of 5HD1:STHD10RJ w/ 16d nails in each hole at all studs and plates per manufacturer instructions.HD2:MSTC40 w/ 10d nails*All hardware is manufactured by Simpson Strong Tie.Structural Braced Wall Details Provided by:Becklin & Whitney Consulting Engineers, Inc139 1st Ave. E. Ste 200P.O. Box 471Cambridge, MN 55008763.689.5631I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.WILLIAM A. BECKLIN, P.E. DATE: APRIL 12, 2021 LIC. NO. 18494(2) ply (min) 2x6"required at strapor HD1Detail 2:Blocking at roof trusses w/ up to 12" heel.Detail 1:Blocking at roof trusses w/ heel over 12"Wall Bracing OnlyWall Bracing At:19779 Henning AveLakeville, MN
Solid blocking req'd between trusses w/(1) A35 clip fastened to top plate w/ 8d x1 12" nails 6' O.C. and 1' from ends.Fasten sill plate to blocking w/ (1) row of16d nails 4" O.C.Solid blocking req'd between roof trusses(up to 12" tall) w/ (1) A35 clip fastened totop plate w/ 8d x 1 12" nails 6' O.C. and 1'from ends. 2" air gap req'd at top. Upliftprevention of roof trusses by manufacturer.Solid blocking between trusses fastenedto blocking w/ (2) rows (staggered) of16d nails 8" O.C.Fasten roof sheathing to trusses w/ 8d nails6" O.C. at all edges and blocking and 12" inthe field w/ all seams blocked solidFloor truss
Floor truss Fasten shear panels to trussesw/ (4) 16d nails on each sideFasten 716" OSBto all 2x w/ 8dnails 3" O.C.Fasten each shearpanel to plate w/(3) 16d nails2x4"2x4"2x4"
2x4"S5 of 5Detail 1: Transfer DiaphragmStructural Braced Wall Details Provided by:Becklin & Whitney Consulting Engineers, Inc139 1st Ave. E. Ste 200P.O. Box 471Cambridge, MN 55008763.689.5631I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.WILLIAM A. BECKLIN, P.E. DATE: APRIL 12, 2021 LIC. NO. 18494Detail 2: Floor truss blockingWall Bracing OnlyWall Bracing At:19779 Henning AveLakeville, MN
Stone Cottage
HVAC Load Calculations
for
Neis
19779 Henning Ave
Lakeville,mn
Prepared By:
Randy Andrews
Lofgren Heating
5708 Upper 147th Street West
Apple Vallley, MN 55124
Wednesday, March 10, 2021
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 2
Project Report
General Project Information
Project Title:Stone Cottage
Project Date:Wednesday, March 10, 2021
Client Name:Neis
Client Address:19779 Henning Ave
Client City:Lakeville,mn
Company Name:Lofgren Heating
Company Representative:Randy Andrews
Company Address:5708 Upper 147th Street West
Company City:Apple Vallley, MN 55124
Company E-Mail Address:rrandrews@lofgrenheating-ac.com
Design Data
Reference City:Minneapolis, Minnesota
Building Orientation:Front door faces Northeast
Daily Temperature Range:Medium
Latitude:44 Degrees
Elevation:834 ft.
Altitude Factor:0.970
Elevation Sensible Adj. Factor:1.000
Elevation Total Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29
Check Figures
Total Building Supply CFM:1,172 CFM Per Square ft.:0.333
Square ft. of Room Area:3,521 Square ft. Per Ton:1,245
Volume (ft³) of Cond. Space:31,689
Building Loads
Total Heating Required Including Ventilation Air:50,515 Btuh 50.515 MBH
Total Sensible Gain:25,457 Btuh 80 %
Total Latent Gain:6,548 Btuh 20 %
Total Cooling Required Including Ventilation Air:32,005 Btuh 2.67 Tons (Based On Sensible + Latent)
2.83 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19779 HENNING LAKEVILLE 03102021.rhv Wednesday, March 10, 2021, 12:27 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 3
Load Preview Report
Scope
Has
AED
Net
Ton
ft.²
/Ton Area
Sen
Gain
Lat
Gain
Net
Gain
Sen
Loss
Sys
Htg
CFM
Sys
Clg
CFM
Sys
Act
CFM
Duct
Size
Building 2.67 1,320 3,521 25,457 6,548 32,005 50,515 930 1,172 1,172
System 1 No 2.67 1,320 3,521 25,457 6,548 32,005 50,515 930 1,172 1,172 21x10
Ventilation 437 1,352 1,789 5,850
Zone 1 3,521 25,020 5,196 30,216 44,665 930 1,172 1,172 21x10
1-Main Level 1,142 11,639 1,848 13,487 18,236 380 545 545 6--6
2-Upper Level 1,237 11,868 2,448 14,316 17,959 374 556 556 7--6
3-Lower Level 1,142 1,513 900 2,413 8,470 176 71 71 1--6
C:\ ...\19779 HENNING LAKEVILLE 03102021.rhv Wednesday, March 10, 2021, 12:27 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 4
Total Building Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
375 10,439 0 10,665 10,665
11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2370 13,402 0 2,049 2,049
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1404 5,986 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1237 2,152 0 1,188 1,188
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1142 2,484 0 0 0
Subtotals for structure:36,381 0 14,431 14,431
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 89, Summer CFM: 46 8,284 896 644 1,540
Ventilation: Winter CFM: 140, Summer CFM: 70 5,850 1,352 437 1,789
AED Excursion:0 0 875 875
Total Building Load Totals:50,515 6,548 25,457 32,005
Check Figures
Total Building Supply CFM:1,172 CFM Per Square ft.:0.333
Square ft. of Room Area:3,521 Square ft. Per Ton:1,245
Volume (ft³) of Cond. Space:31,689
Building Loads
Total Heating Required Including Ventilation Air:50,515 Btuh 50.515 MBH
Total Sensible Gain:25,457 Btuh 80 %
Total Latent Gain:6,548 Btuh 20 %
Total Cooling Required Including Ventilation Air:32,005 Btuh 2.67 Tons (Based On Sensible + Latent)
2.83 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19779 HENNING LAKEVILLE 03102021.rhv Wednesday, March 10, 2021, 12:27 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 5
Building Pie Chart
Building
Loss
50,515
Btuh
Floor 5%Roof 4%
Wall 38%
Glass 21%
Door 4%
Infiltration 16%
Ventilation 12%
Building
Gain
32,005
Btuh
Roof 4%Wall 6%
Glass 33%
Door 2%People 12%
Equipment 30%
Infiltration 5%
Ventilation 6%AED Excursion 3%
C:\ ...\19779 HENNING LAKEVILLE 03102021.rhv Wednesday, March 10, 2021, 12:27 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 6
System 1 Whole House Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
375 10,439 0 10,665 10,665
11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2370 13,402 0 2,049 2,049
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1404 5,986 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1237 2,152 0 1,188 1,188
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1142 2,484 0 0 0
Subtotals for structure:36,381 0 14,431 14,431
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 89, Summer CFM: 46 8,284 896 644 1,540
Ventilation: Winter CFM: 140, Summer CFM: 70 5,850 1,352 437 1,789
AED Excursion:0 0 875 875
System 1 Whole House Load Totals:50,515 6,548 25,457 32,005
Check Figures
Supply CFM:1,172 CFM Per Square ft.:0.333
Square ft. of Room Area:3,521 Square ft. Per Ton:1,245
Volume (ft³) of Cond. Space:31,689
System Loads
Total Heating Required Including Ventilation Air:50,515 Btuh 50.515 MBH
Total Sensible Gain:25,457 Btuh 80 %
Total Latent Gain:6,548 Btuh 20 %
Total Cooling Required Including Ventilation Air:32,005 Btuh 2.67 Tons (Based On Sensible + Latent)
2.83 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19779 HENNING LAKEVILLE 03102021.rhv Wednesday, March 10, 2021, 12:27 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 7
Detailed Room Loads - Room 1 - Main Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,142.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,142.0 sq.ft.Supply Air:545 CFM
Ceiling Height:9.0 ft.Supply Air Changes:3.2 AC/hr
Volume:10,278.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:6 Actual Winter Vent.:57 CFM
Runout Air:91 CFM Percent of Supply.:10 %
Runout Duct Size:6 in.Actual Summer Vent.:33 CFM
Runout Air Velocity:463 ft./min.Percent of Supply:6 %
Runout Air Velocity:463 ft./min.Actual Winter Infil.:45 CFM
Actual Loss:0.134 in.wg./100 ft.Actual Summer Infil.:23 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
NE-Wall-12F-0sw 38 X 9 253 0.065 5.7 1,431 0.9 0 219
SW-Wall-12F-0sw 38 X 9 234 0.065 5.7 1,323 0.9 0 202
NW-Wall-12F-0sw 40 X 9 317 0.065 5.7 1,793 0.9 0 274
SE-Wall-12F-0sw 40 X 9 330 0.065 5.7 1,866 0.9 0 285
NE-Door-11N 6 X 7 42 0.350 30.5 1,279 8.4 0 353
NE-Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
NE-Gls-4A-1a-o shgc-0.33 0%S 26 0.320 27.8 724 24.2 0 628
SW-Gls-4A-1a-o shgc-0.33 0%S 108 0.320 27.8 3,007 31.0 0 3,346
NW-Gls-4A-1a-o shgc-0.33 0%S 43 0.320 27.8 1,197 24.1 0 1,038
SE-Gls-4A-1a-o shgc-0.33 0%S 30 0.320 27.8 835 31.0 0 929
Subtotals for Structure:14,094 0 7,450
Infil.: Win.: 44.6, Sum.: 23.2 1,404 2.950 4,142 0.229 448 322
AED Excursion:407
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:1,000 3,000
Room Totals:18,236 1,848 11,639
C:\ ...\19779 HENNING LAKEVILLE 03102021.rhv Wednesday, March 10, 2021, 12:27 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 8
Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,237.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,237.0 sq.ft.Supply Air:556 CFM
Ceiling Height:9.0 ft.Supply Air Changes:3.0 AC/hr
Volume:11,133.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:7 Actual Winter Vent.:56 CFM
Runout Air:79 CFM Percent of Supply.:10 %
Runout Duct Size:6 in.Actual Summer Vent.:33 CFM
Runout Air Velocity:405 ft./min.Percent of Supply:6 %
Runout Air Velocity:405 ft./min.Actual Winter Infil.:45 CFM
Actual Loss:0.103 in.wg./100 ft.Actual Summer Infil.:23 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
NE-Wall-12F-0sw 38 X 9 282 0.065 5.7 1,595 0.9 0 244
SW-Wall-12F-0sw 38 X 9 274 0.065 5.7 1,549 0.9 0 237
NW-Wall-12F-0sw 40 X 9 350 0.065 5.7 1,979 0.9 0 303
SE-Wall-12F-0sw 40 X 9 330 0.065 5.7 1,866 0.9 0 285
NE-Gls-4A-1a-o shgc-0.33 0%S 60 0.320 27.8 1,670 24.1 0 1,448
SW-Gls-4A-1a-o shgc-0.33 0%S 68 0.320 27.8 1,893 31.0 0 2,106
NW-Gls-4A-1a-o shgc-0.33 0%S 10 0.320 27.8 278 24.1 0 241
SE-Gls-4A-1a-o shgc-0.33 0%S 30 0.320 27.8 835 31.0 0 929
UP-Ceil-16B-50 1237 X 1 1237 0.020 1.7 2,152 1.0 0 1,188
Subtotals for Structure:13,817 0 6,981
Infil.: Win.: 44.6, Sum.: 23.2 1,404 2.950 4,142 0.229 448 322
AED Excursion:415
People: 200 lat/per, 230 sen/per:5 1,000 1,150
Equipment:1,000 3,000
Room Totals:17,959 2,448 11,868
C:\ ...\19779 HENNING LAKEVILLE 03102021.rhv Wednesday, March 10, 2021, 12:27 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 9
Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,142.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,142.0 sq.ft.Supply Air:71 CFM
Ceiling Height:9.0 ft.Supply Air Changes:0.4 AC/hr
Volume:10,278.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:1 Actual Winter Vent.:27 CFM
Runout Air:71 CFM Percent of Supply.:37 %
Runout Duct Size:6 in.Actual Summer Vent.:4 CFM
Runout Air Velocity:361 ft./min.Percent of Supply:6 %
Runout Air Velocity:361 ft./min.Actual Winter Infil.:0 CFM
Actual Loss:0.082 in.wg./100 ft.Actual Summer Infil.:0 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
NE-Wall-15B0-10sf-10 38 X 9 342 0.049 4.3 1,458 0.0 0 0
SW-Wall-15B0-10sf-10 38 X 9 342 0.049 4.3 1,458 0.0 0 0
NW-Wall-15B0-10sf-10 40 X 9 360 0.049 4.3 1,535 0.0 0 0
SE-Wall-15B0-10sf-10 40 X 9 360 0.049 4.3 1,535 0.0 0 0
Floor-21A-24 1 X 1142 1142 0.025 2.2 2,484 0.0 0 0
Subtotals for Structure:8,470 0 0
Infil.: Win.: 0.0, Sum.: 0.0 0 0 0 0 0 0
AED Excursion:53
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:500 1,000
Room Totals:8,470 900 1,513
C:\ ...\19779 HENNING LAKEVILLE 03102021.rhv Wednesday, March 10, 2021, 12:27 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 10
System 1 Room Load Summary
No
Room
Name
Area
SF
Htg
Sens
Btuh
Min
Htg
CFM
Run
Duct
Size
Run
Duct
Vel
Clg
Sens
Btuh
Clg
Lat
Btuh
Min
Clg
CFM
Act
Sys
CFM
---Zone 1---
1 Main Level 1,142 18,236 380 6-6 463 11,639 1,848 545 545
2 Upper Level 1,237 17,959 374 7-6 405 11,868 2,448 556 556
3 Lower Level 1,142 8,470 176 1-6 361 1,513 900 71 71
Ventilation 5,850 437 1,352
System 1 total 3,521 50,515 930 25,457 6,548 1,172 1,172
System 1 Main Trunk Size:21x10 in.
Velocity:804 ft./min
Loss per 100 ft.:0.095 in.wg
Cooling System Summary
Cooling
Tons
Sensible/Latent
Split
Sensible
Btuh
Latent
Btuh
Total
Btuh
Net Required:2.67 80% / 20%25,457 6,548 32,005
Recommended:2.83 75% / 25%25,457 8,486 33,943
Actual:1.00 77% / 23%9,240 2,760 12,000
Equipment Data
Heating System Cooling System
Type:Natural Gas Furnace Standard Air Conditioner
Model:QC-F38-E78-G QC-C12
Indoor Model:S12
Brand:Quikcool FE Series Quikcool AS Series
Description:Hi Efficiency Furnace Standard Efficiency Air Condit
Efficiency:78.3 AFUE 12.4 SEER
Sound:8.1 bels
Capacity:38,000 Btuh 12,000 Btuh
Sensible Capacity:n/a 9,240 Btuh
Latent Capacity:n/a 2,760 Btuh
C:\ ...\19779 HENNING LAKEVILLE 03102021.rhv Wednesday, March 10, 2021, 12:27 PM
Builders Associaton of Minnesota version 101014
Date Certificate Posted
x Passive (No Fan)
Active (With fan and monometer
or other system monitoring
Location (or future location) of Fan:
Other Please Describe Here
x
10/15 x x
x
20 x
20 x
21 x
49 x
x
x
x
x Not applicable, all ducts located in conditioned space
x Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:Input in
BTUS:
70,000 Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
93%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
x Passive
Low: Other, describe:
x Low:
Location of fan(s), describe: Cfm's
4" " round duct OR Flex
" metal duct
ML193UH070
Heating Loss
Manufacturer Lennox
Natural Gas
Output in
Tons:
3 Ton50
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Capacity continuous ventilation rate in cfms:
200CFM
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
25,457Residential Load Calculation
SEER
/EER
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Electric
Make-up Air Select a Type
AO Smith
Domestic Water
Heater
MECHANICAL SYSTEMS
Rating or Size
Efficiency 13 Seer
Building envelope air tightness:
Rim Joist (1st Floor)
GPVL-50 13ACXN042-230 Model
Heating System
Natrual Gas
Lennox Fiberglass, Batts Foundation Wall
R-value
Average U-Factor (excludes skylights and one door) U:
Duct system air tightness:
Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply
Mineral Fiberboard Insulation Location
Foam, Closed Cell0.22
Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Non or Not ApplicableAttic
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
Rim Joist (2nd Floor+)
0.30
Appliances
Mech Room
Heat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
50,515
Heating Gain Cooling Load
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.
Place your
logo here
New Construction Energy Code Compliance Certificate
Name of Residential Contractor
Stone Cottage Construction Inc.
MN License Number
Lakeville19779 Henning Ave
BC636874
City Mailing Address of the Dwelling or Dwelling Unit
Combustion Air Select a Type
Location of duct or system:
32,005
Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat
NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION
This form must be completed and submitted with all new residential permit applications.
New residential building permits WILL NOT be issued without this completed form.
Project Site Address: _____________________________________________________________________
Company Name: _________________________________________________________________________
Primary Contact: _________________________________________________________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Description of Land Disturbing Activity: _____________________________________________________
NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___
If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an
erosion and sediment control plan MUST be submitted with the residential building permit application.
“The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities
in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater
Permit.” (NPDES Construction Stormwater Permit, MPCA)
“The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least
once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.”
(NPDES Construction Stormwater Permit, MPCA)
Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control
inspections and corrective actions:
Name of Person: ________________________________Company: _______________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Entity that Provided Training: ________________________ Certification Expiration Date: ____________
NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots.
No land disturbing activity may begin until a residential building permit has been issued.
I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National
Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER;
withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater
Permit (MN R 100001) or erosion and sediment control plan.
Signature: ________________________________________________ Date:_________________________
Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500
KP
04/14/21 X