Loading...
HomeMy WebLinkAbout19856 Harvest Dr SurveyZoning = RS-3FY - 30'SY - 10' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'*Draintile connection required.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________04/13/2021lvlasaty*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION