HomeMy WebLinkAbout17834 Graphite Lane Survey*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________04/13/2021 lvlasaty
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.